A novel peak shaving framework for coal-fired power plant in isolated microgrids: Combined flexible energy storage and waste heat recovery

Coal-fired power plants (CFPPs) not only bear the burden of peak shaving, but the mission of energy saving. However, the increasing peak-valley difference leads to the difficulties of peak shaving and the energy waste caused by the ineffective utilization of waste heat, which undoubtedly becomes a n...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of cleaner production 2022-11, Vol.374, p.133936, Article 133936
Hauptverfasser: Ouyang, Tiancheng, Qin, Peijia, Tan, Xianlin, Wang, Jinxiang, Fan, Junhao
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Coal-fired power plants (CFPPs) not only bear the burden of peak shaving, but the mission of energy saving. However, the increasing peak-valley difference leads to the difficulties of peak shaving and the energy waste caused by the ineffective utilization of waste heat, which undoubtedly becomes a new problem for CFPPs. So, a new integrated system combining flexible energy storage and waste heat recovery in the CFPP is presented. The scheme consists of a double-effect absorption heat pump (D-AHP) with an integrated thermal electricity storage system (IT-ESS). Waste heat from flue gas is recovered by D-AHP, while IT-ESS is responsible for peak shaving. Firstly, comprehensive satisfaction is used for demand-side management. Subsequently, D-AHP is utilized to recover waste heat to meet the users' heating demand. Finally, steam is extracted during off-peak time to store energy for IT-ESS, while energy is released for peak shaving during peak time. Throughout the process, the proportional-integral-differential is applied to control the airflow into the IT-ESS. Numerical results indicate that the maximum peak-valley difference is decreased by 55.3 MW after the optimization of comprehensive satisfaction, and the response time for the airflow to reach the target value is only about 10% of one period with the PID control strategy. Besides, the scheme successfully satisfies the electricity demand and heating demand in isolated microgrids, and the round-trip efficiency of IT-ESS is 23.11%. Lastly, the daily revenue of the system is 1.40 million dollars and the payback period is 3.16 years. [Display omitted] •A new design of flexible energy storage combined with waste heat recovery is proposed.•Peak-valley difference of load is reduced after applying comprehensive satisfaction.•The integrated thermal electricity storage system is applied for peak shaving.
ISSN:0959-6526
1879-1786
DOI:10.1016/j.jclepro.2022.133936