A new cost-sharing preventive maintenance program under two-dimensional warranty
In this paper, we present a new cost-sharing preventive maintenance (PM) program for a product protected by a two-dimensional warranty. The product is preventively maintained by its manufacturer in the warranty period and by a customer in the post-warranty period. To better coordinate their decision...
Gespeichert in:
Veröffentlicht in: | International journal of production economics 2022-12, Vol.254, p.108580, Article 108580 |
---|---|
Hauptverfasser: | , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | In this paper, we present a new cost-sharing preventive maintenance (PM) program for a product protected by a two-dimensional warranty. The product is preventively maintained by its manufacturer in the warranty period and by a customer in the post-warranty period. To better coordinate their decisions, the cost of PM during the warranty period is borne jointly by both parties based on a fixed ratio. We propose a new way of designing such a cost-sharing PM program by using the customer’s expected post-warranty cost. We find a failure intensity threshold that determines whether the customer should carry out PM at the beginning of the post-warranty period. It is shown that cost sharing can reduce the failure intensity at this point, which in turn can reduce the customer’s expected total cost. Given a specific usage rate of the product, we then derive the optimal cost-sharing ratio from the customer’s perspective. In the numerical study, we examine the effect of usage rate on the optimal cost-sharing ratio as well as the benefits gained from cost sharing. |
---|---|
ISSN: | 0925-5273 1873-7579 |
DOI: | 10.1016/j.ijpe.2022.108580 |