A new cost-sharing preventive maintenance program under two-dimensional warranty

In this paper, we present a new cost-sharing preventive maintenance (PM) program for a product protected by a two-dimensional warranty. The product is preventively maintained by its manufacturer in the warranty period and by a customer in the post-warranty period. To better coordinate their decision...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International journal of production economics 2022-12, Vol.254, p.108580, Article 108580
Hauptverfasser: Peng, Shizhe, Jiang, Wei, Wei, Lai, Wang, Xiao-Lin
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:In this paper, we present a new cost-sharing preventive maintenance (PM) program for a product protected by a two-dimensional warranty. The product is preventively maintained by its manufacturer in the warranty period and by a customer in the post-warranty period. To better coordinate their decisions, the cost of PM during the warranty period is borne jointly by both parties based on a fixed ratio. We propose a new way of designing such a cost-sharing PM program by using the customer’s expected post-warranty cost. We find a failure intensity threshold that determines whether the customer should carry out PM at the beginning of the post-warranty period. It is shown that cost sharing can reduce the failure intensity at this point, which in turn can reduce the customer’s expected total cost. Given a specific usage rate of the product, we then derive the optimal cost-sharing ratio from the customer’s perspective. In the numerical study, we examine the effect of usage rate on the optimal cost-sharing ratio as well as the benefits gained from cost sharing.
ISSN:0925-5273
1873-7579
DOI:10.1016/j.ijpe.2022.108580