Risk-based post injection site care and monitoring for commercial-scale carbon storage: Reevaluation of the FutureGen 2.0 site using NRAP-Open-IAM and DREAM

•NRAP-Open-IAM and DREAM were used to determine an optimized monitoring network for a commercial-scale CO2 storage project.•NRAP-Open-IAM revealed that maximum simulated leakage rates of brine were small and could be detected during the injection phase.•These NRAP tools can be used to define a risk-...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International Journal of Greenhouse Gas Control 2019-11, Vol.90, p.102784, Article 102784
Hauptverfasser: Bacon, Diana H., Yonkofski, Catherine M.R., Brown, Christopher F., Demirkanli, Deniz I., Whiting, Jonathan M.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:•NRAP-Open-IAM and DREAM were used to determine an optimized monitoring network for a commercial-scale CO2 storage project.•NRAP-Open-IAM revealed that maximum simulated leakage rates of brine were small and could be detected during the injection phase.•These NRAP tools can be used to define a risk-based, and substantially shorter, PISC period for the site.•This study serves as a first-of-its-kind effort to apply NRAP tools to evaluate components of a commercial-scale Class VI UIC permit.•This study provides a foundation for broader application and adoption of these NRAP tools by the CCS community. Modeling was conducted to assess the effectiveness of the NRAP toolset, specifically NRAP-Open-IAM and DREAM, to determine a risk-based PISC period and optimized monitoring network for a commercial-scale CO2 storage project. Realizations from NRAP-Open-IAM revealed that maximum simulated leakage rates of brine were small, on the order of 10−5 kg/s, and maximum simulated leakage rates of CO2 were on the order of 10-3 kg/s, and could be detected earliest during the injection phase in the Ironton-Galesville, the thief zone immediately overlying the injection reservoir. Using this information to design an optimized monitoring well network eliminated one of the three originally planned monitoring wells, resulting in a cost reduction for the project. Perhaps the most significant finding from this effort is that NRAP-Open-IAM can be used to define a risk-based, and substantially shorter, PISC period for the site. NRAP-Open-IAM realizations indicate that the majority of risk of endangerment to USDWs decreases within the first 5 years after CO2 injection ends. Doubling this timeframe would still lead to a net PISC period reduction of 40-years and an operational cost reduction in excess of $50 M for the project. This study serves as a first-of-its-kind effort to apply NRAP tools to evaluate components of a commercial-scale Class VI UIC permit and provides a foundation for broader application and adoption by the CCS community.