Erosion-corrosion failure analysis of the elbow pipe of steam distribution manifold

•The cause of failure of 90° and 45° elbows made from API 5L X65 steel is analyzed.•Experimental and CFD based numerical analysis are compared for the study.•The maximum erosion rate in the 45° elbow is 42% lower than in the 90° elbow.•Remedial actions for preventing the erosion-corrosion of 90° and...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Engineering failure analysis 2024-06, Vol.160, p.108177, Article 108177
Hauptverfasser: Khan, Rehan, Mourad, Abdel-Hamid.I., Wieczorowski, Michał, Damjanović, Darko, Pao, William, Elsheikh, Ammar, Seikh, A.H.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:•The cause of failure of 90° and 45° elbows made from API 5L X65 steel is analyzed.•Experimental and CFD based numerical analysis are compared for the study.•The maximum erosion rate in the 45° elbow is 42% lower than in the 90° elbow.•Remedial actions for preventing the erosion-corrosion of 90° and 45° elbows are proposed. This work discusses a case study of the failure of rice condition plant boiler pipe fittings. The failure analysis was performed on the 45° and 90° API 5LX65 steel pipe elbows connected to a steam manifold in a boiler of a rice conditioning plant. Failure analysis was performed by visual observation, microscopic analysis, hardness measurements, and numerically by Computational Fluid Dynamics (CFD). It was confirmed that the mechanism of failure was due to erosion-corrosion. The results showed also that, erosion-corrosion at the outlet of the 90° and 45° elbows due to the maximum particle impact in the high pressure and high turbulence intensity region. Microscopic analysis of the 90° and 45° elbows showed that large pits and cuts were the main reason for leakage perforation. Erosion at the inner bend of the 90° and 45° elbows is lower than at the outer bend, which is related to the higher particle–wall impaction, pressure, and turbulence intensity. The main cause of leakage and wall thinning in both elbows is the development of limescale which leads to pitting corrosion and the formation of leaks at higher oxygen concentrations. The simulation results show that the maximum material removal rate in the 45° elbow is 42 % lower than in the 90° elbow, the erodent impaction and higher wall shear are liable for the development of the perforation near the exit of 90° and 45° elbows.
ISSN:1350-6307
1873-1961
DOI:10.1016/j.engfailanal.2024.108177