Investigation of premature failure mechanism in pavement overlay of national highway of Bangladesh

•Either Asphalt layer to asphalt layer or asphalt to granular base interface de-bonding and cracking are strongly related.•Overloading found more significant than de-bonding especially for rutting.•Fatigue and rutting failure within one year should be associated by coupling effect of interlayer poor...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Construction & building materials 2022-02, Vol.318, p.126194, Article 126194
Hauptverfasser: Abadin, Md. Joynul, Hayano, Kimitoshi
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:•Either Asphalt layer to asphalt layer or asphalt to granular base interface de-bonding and cracking are strongly related.•Overloading found more significant than de-bonding especially for rutting.•Fatigue and rutting failure within one year should be associated by coupling effect of interlayer poor bonding and overloading in N2 Highway. Roadway is the economic lifeline of Bangladesh. Maintenance of this roadway is main challenge of Roads and Highways Department (RHD). Overlay is the most common maintenance practice for National Highways, which design life is five years. However, it’s been reported, the overlay failed prematurely with cracking and rutting within one year even 6 to 9 months in some cases. This study aiming to investigate the premature failure mechanism of national highway pavement. Several field investigations were done on national highway namely N2. A numerical parametric study was also conducted with variable interfacial bond condition, overloading and layers stiffness. To investigate the pavements failures, conventional fatigue and rutting criteria were considered. Laser crack measurement system showed that alligator cracking is dominant failure mode followed by rutting. Alligator crack pattern indicated about slippage failure and overloading induced fatigue failure. Core cutting confirmed that interface de-bonding and cracking are strongly related. Bitumen samples were found highly temperature susceptible which could be correlated slippage failure. Moreover, Base layer stiffness variation was observed from Dynamic Cone Penetration test. Numerical analysis revealed that poor interfacial bonding significantly affects horizontal and vertical strain distributions; subsequently reduce pavement life but only it is not enough to fatigue and rutting failure of N2 within one year. Overloading found more significant than de-bonding especially for rutting. Analysis also suggested that fatigue and rutting failure within one year should be associated by coupling effect of poor bonding and overloading. Variation of base layer stiffness might be exacerbated the coupling effect in N2.
ISSN:0950-0618
1879-0526
DOI:10.1016/j.conbuildmat.2021.126194