Optimisation and performance prediction of photosynthetic biogas upgrading using a bubble column
[Display omitted] •Central Composite Design in RSM was applied as the design of experiments.•Bubble column performance for photosynthetic biogas upgrading was predicted.•Grid quality biomethane (CO2
Gespeichert in:
Veröffentlicht in: | Chemical engineering journal (Lausanne, Switzerland : 1996) Switzerland : 1996), 2022-06, Vol.437, p.134988, Article 134988 |
---|---|
Hauptverfasser: | , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | [Display omitted]
•Central Composite Design in RSM was applied as the design of experiments.•Bubble column performance for photosynthetic biogas upgrading was predicted.•Grid quality biomethane (CO2 |
---|---|
ISSN: | 1385-8947 1873-3212 |
DOI: | 10.1016/j.cej.2022.134988 |