Techno-economic assessment of a Carnot battery thermally integrated with a data center

•The feasibility of integrating a Carnot battery with a data center is explored.•R1233zd(E) shows the highest roundtrip efficiency (43 %) in low-grade applications.•Heat pump integration with data center waste heat reduces the cooling system load.•In high energy price scenario, 7744 € yearly gain an...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Applied thermal engineering 2025-02, Vol.260, p.124952, Article 124952
Hauptverfasser: Poletto, Chiara, Pascale, Andrea De, Ottaviano, Saverio, Dumont, Olivier, Branchini, Lisa
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:•The feasibility of integrating a Carnot battery with a data center is explored.•R1233zd(E) shows the highest roundtrip efficiency (43 %) in low-grade applications.•Heat pump integration with data center waste heat reduces the cooling system load.•In high energy price scenario, 7744 € yearly gain and 10-year payback are obtained.•4-year payback period can be obtained when the electric surplus cannot be sold. Carnot batteries (CBs) are gaining interest as energy storage solutions, particularly when waste heat is available for thermal integration. Data centers (DCs) represent a relevant source of waste heat, as they convert most of the supplied electricity into low-grade heat, and their utilization is expected to continue increasing in the future. This study explores the feasibility of integrating an Organic Rankine Cycle (ORC)/Heat Pump (HP) CB with a DC powered by a photovoltaic power plant. First, from the thermodynamic analysis conducted in design conditions, the hydrofluoroolefin R1233zd(E) results in the most suitable working fluid, leading to 43 % roundtrip efficiency. Then, a detailed semi-empirical off-design model of a CB is employed in a rule-based control strategy to handle the ORC/HP operations. If the HP is thermally integrated with the DC waste heat, a higher coefficient of performance is achieved, and the consumption of the DC cooling system is reduced. A sensitivity analysis is conducted to explore the impact of the storage volume and the energy prices on the integrated system’s techno-economic performance. The CB implementation is economically feasible when the electricity price is high, reaching a yearly gain of 7744 €, and a simple payback period of 10 years when considering a DC electric consumption of 200 kWe and a 25 kWe-sized HP/ORC. The gain increases if the electric surplus cannot be sold, obtaining a 4-year payback period. Eventually, we perform a comparison with an ORC-only configuration to assess the CB’s technical and economic convenience.
ISSN:1359-4311
DOI:10.1016/j.applthermaleng.2024.124952