An automatic line for electroplating of parts

At the M.V. Frunze Production Union a ''Nickel-Chromium'' automatic line for decorative plating of parts has been designed, built, and placed in service. The line consists of 2 rows of bath equipment with return movement of the load. The baths in each row of the line are located...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Chem. Pet. Eng. (Engl. Transl.); (United States) 1982-02, Vol.18 (2), p.59-60
1. Verfasser: Odnenko, I. V.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:At the M.V. Frunze Production Union a ''Nickel-Chromium'' automatic line for decorative plating of parts has been designed, built, and placed in service. The line consists of 2 rows of bath equipment with return movement of the load. The baths in each row of the line are located in order of the plating production operation. The introduction of the line has made it possible to eliminate manual labor in electroplating of parts. The annual saving from introduction of it is 40,500 rubles.
ISSN:0009-2355
1573-8329
DOI:10.1007/BF01176534