Estimation of discrete-time software rejuvenation schedule based on the cost-effectiveness
In this paper, the probability model for determination of the rejuvenation schedule of the software system treated by Huang and colleagues (1995) and by Dohi and colleagues (2001) is discussed. In particular, under the evaluation criterion of cost‐effectiveness, two discrete time models are analyzed...
Gespeichert in:
Veröffentlicht in: | Electronics & communications in Japan. Part 3, Fundamental electronic science Fundamental electronic science, 2004-06, Vol.87 (6), p.23-31 |
---|---|
Hauptverfasser: | , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | In this paper, the probability model for determination of the rejuvenation schedule of the software system treated by Huang and colleagues (1995) and by Dohi and colleagues (2001) is discussed. In particular, under the evaluation criterion of cost‐effectiveness, two discrete time models are analyzed and an optimum software rejuvenation schedule maximizing cost‐effectiveness is derived. Further, a statistical procedure for estimation of an optimal software rejuvenation schedule is discussed in which no probability distribution is specified from the failure time data. © 2004 Wiley Periodicals, Inc. Electron Comm Jpn Pt 3, 87(6): 23–31, 2004; Published online in Wiley InterScience (www.interscience.wiley.com). DOI 10.1002/ecjc.10128 |
---|---|
ISSN: | 1042-0967 1520-6440 |
DOI: | 10.1002/ecjc.10128 |