Some experiences with BEPCII SRF system operation

The Superconducting Radio Frequency (SRF) system of the upgrade project of the Beijing Electron Positron Collider (BEPCII) has been in operation for almost 8 years. During operation, many problems have been encountered, such as excessive heating of the power couplers, frequent beam trips during high...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Chinese physics C 2016-06, Vol.40 (6), p.74-79
1. Verfasser: 黄彤明 林海英 孙毅) 戴建枰 王光伟 潘卫民 李中泉 马强 王群要 赵光远 米正辉 沙鹏
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The Superconducting Radio Frequency (SRF) system of the upgrade project of the Beijing Electron Positron Collider (BEPCII) has been in operation for almost 8 years. During operation, many problems have been encountered, such as excessive heating of the power couplers, frequent beam trips during high intensity colliding, false arc interlock trigger and so on. Among them, some has been solved successfully, some have been alleviated. This paper will describe some experiences with BEPCII SRF system operation, including the symptoms, causes and solutions of problems.
ISSN:1674-1137
0254-3052
DOI:10.1088/1674-1137/40/6/067001