The Shandong Shidao Bay 200 MWe High-Temperature Gas-Cooled Reactor Pebble-Bed Module (HTR-PM) Demonstration Power Plant: An Engineering and Technological Innovation
After the first concrete was poured on December 9, 2012 at the Shidao Bay site in Rongcheng, Shandong Province, China, the construction of the reactor building for the world's first high-temperature gas- cooled reactor pebble-bed module (HTR-PM) demonstration power plant was completed in June, 2015....
Gespeichert in:
Veröffentlicht in: | 中国工程科学:英文版 2016 (1), p.112-118 |
---|---|
1. Verfasser: | |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | After the first concrete was poured on December 9, 2012 at the Shidao Bay site in Rongcheng, Shandong Province, China, the construction of the reactor building for the world's first high-temperature gas- cooled reactor pebble-bed module (HTR-PM) demonstration power plant was completed in June, 2015. Installation of the main equipment then began, and the power plant is currently progressing well to- ward connecting to the grid at the end of 2017. The thermal power of a single HTR-PM reactor module is 250 MW,h, the helium temperatures at the reactor core inlet/outlet are 250/750 ℃, and a steam of 13.25 MPa/567 ~C is produced at the steam generator outlet. Two HTR-PM reactor modules are connect- ed to a steam turbine to form a 210 MW nuclear power plant. Due to China's industrial capability, we were able to overcome great difficulties, manufacture first-of-a-kind equipment, and realize series ma- jor technological innovations. We have achieved successful results in many aspects, including planning and implementing R&D, establishing an industrial partnership, manufacturing equipment, fuel produc- tion, licensing, site preparation, and balancing safety and economics; these obtained experiences may also be referenced by the global nuclear community. |
---|---|
ISSN: | 2095-8099 |