Lessons learned after three years of SPIDER operation and the first MITICA integrated tests
ITER envisages the use of two heating neutral beam injectors plus an optional one as part of the auxiliary heating and current drive system. The 16.5 MW expected neutral beam power per injector is several notches higher than worldwide existing facilities. A Neutral Beam Test Facility (NBTF) was esta...
Gespeichert in:
Veröffentlicht in: | arXiv.org 2023-04 |
---|---|
Hauptverfasser: | , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | ITER envisages the use of two heating neutral beam injectors plus an optional one as part of the auxiliary heating and current drive system. The 16.5 MW expected neutral beam power per injector is several notches higher than worldwide existing facilities. A Neutral Beam Test Facility (NBTF) was established at Consorzio RFX, exploiting the synergy of two test beds, SPIDER and MITICA. SPIDER is dedicated to developing and characterizing large efficient negative ion sources at relevant parameters in ITER-like conditions: source and accelerator located in the same vacuum where the beam propagates, immunity to electromagnetic interferences of multiple radio-frequency (RF) antennas, avoidance of RF-induced discharges on the outside of the source. Three years of experiments on SPIDER have addressed to the necessary design modifications to enable full performances. The source is presently under a long shut-down phase to incorporate learnings from the experimental campaign. Parallelly, developments on MITICA, the full-scale prototype of the ITER NBI featuring a 1 MV accelerator and ion neutralization, are underway including manufacturing of in-vessel components, while power supplies and auxiliary plants are already under final testing and commissioning. Integration, commissioning and tests of the 1MV power supplies are essential for this first-of-kind system, unparalleled both in research and industry field. The integrated test to confirm 1MV output by combining invertor systems, DC generators and transmission lines extracted errors/accidents in some components. To realize a concrete system for ITER, solutions for the repair and the improvement of the system were developed. Hence, NBTF is emerging as a necessary facility, due to the large gap with existing injectors, effectively dedicated to identify issues and find solutions to enable successful ITER NBI operations in a time bound fashion. |
---|---|
ISSN: | 2331-8422 |
DOI: | 10.48550/arxiv.2304.01692 |