Interface Timing Verification with Delay Correlation Using Constraint Logic Programming

Using constraint logic programming and relational interval arithmetic, as implemented in CLP (BNR) Prolog, we develop a simple yet complete method for interface timing verification. We show how the problems raised by timing verification (consistency, causality and compatibility) can be formulated as...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Girodias, Pierre, Cerny, Eduard
Format: Tagungsbericht
Sprache:eng
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Using constraint logic programming and relational interval arithmetic, as implemented in CLP (BNR) Prolog, we develop a simple yet complete method for interface timing verification. We show how the problems raised by timing verification (consistency, causality and compatibility) can be formulated as constraint satisfaction problems and solved using relational interval arithmetic when the timing constraints are of the linear, earliest or latest type; we examine the effect of correlation between timing delays (within their specified intervals) and show how an interval delay narrowing method can be applied in this context. The original contribution of this paper is to provide a unifying framework for interface timing verification and to present a method that allows delay correlation to be considered.
DOI:10.5555/787260.787763