Gazprom's Struggle to Complete and Control Nord Stream 2

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: Bieliszczuk, Bartosz (VerfasserIn)
Format: Elektronisch E-Book
Sprache:English
Veröffentlicht: Warszawa [Poland] Polski Instytut Spraw Międzynarodowych 2020
Schlagworte:
Online-Zugang:BSB01
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!

MARC

LEADER 00000nmm a2200000zc 4500
001 BV049447383
003 DE-604
005 00000000000000.0
007 cr|uuu---uuuuu
008 231204s2020 |||| o||u| ||||||eng d
035 |a (ZDB-45-CGR)ceeol856563 
035 |a (OCoLC)1414550162 
035 |a (DE-599)BVBBV049447383 
040 |a DE-604  |b ger  |e aacr 
041 0 |a eng 
049 |a DE-12 
084 |a OST  |q DE-12  |2 fid 
100 1 |a Bieliszczuk, Bartosz  |e Verfasser  |4 aut 
245 1 0 |a Gazprom's Struggle to Complete and Control Nord Stream 2  |c Bartosz Bieliszczuk 
264 1 |a Warszawa [Poland]  |b Polski Instytut Spraw Międzynarodowych  |c 2020 
264 2 |a Frankfurt M.  |b CEEOL  |c 2020 
300 |a 1 Online-Ressource (2 Seiten) 
336 |b txt  |2 rdacontent 
337 |b c  |2 rdamedia 
338 |b cr  |2 rdacarrier 
500 |a Russia's plans to complete the construction of Nord Stream 2 (NS2) and maintain Gazprom's control over the gas pipeline after its launch are facing serious obstacles. The main challenges to the Russian company are that the key contractor has withdrawn from the project fearing U.S. sanctions and the requirement to apply EU law to the pipeline. Russia is now trying to finish NS2 construction using its own means and ensure that the institutions regulating the status of the pipeline interpret EU law in Gazprom's favour 
650 4 |a Supranational / Global Economy 
650 4 |a Governance 
650 4 |a Environmental and Energy policy 
650 4 |a International relations/trade 
650 4 |a EU-Legislation 
650 4 |a Transport / Logistics 
710 2 |a Central and Eastern European Online Library  |e Sonstige  |4 oth 
912 |a ZDB-45-CGR 
940 1 |n oe 
940 1 |q BSB_OE_CEEOL 
999 |a oai:aleph.bib-bvb.de:BVB01-034793278 
966 e |u https://www.ceeol.com/search/gray-literature-detail?id=856563  |l BSB01  |p ZDB-45-CGR  |x Verlag  |3 Volltext 

Datensatz im Suchindex

_version_ 1804186205660643328
adam_txt
any_adam_object
any_adam_object_boolean
author Bieliszczuk, Bartosz
author_facet Bieliszczuk, Bartosz
author_role aut
author_sort Bieliszczuk, Bartosz
author_variant b b bb
building Verbundindex
bvnumber BV049447383
collection ZDB-45-CGR
ctrlnum (ZDB-45-CGR)ceeol856563
(OCoLC)1414550162
(DE-599)BVBBV049447383
format Electronic
eBook
fullrecord <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01898nmm a2200421zc 4500</leader><controlfield tag="001">BV049447383</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">00000000000000.0</controlfield><controlfield tag="007">cr|uuu---uuuuu</controlfield><controlfield tag="008">231204s2020 |||| o||u| ||||||eng d</controlfield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(ZDB-45-CGR)ceeol856563</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)1414550162</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV049447383</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">aacr</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-12</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">OST</subfield><subfield code="q">DE-12</subfield><subfield code="2">fid</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Bieliszczuk, Bartosz</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Gazprom's Struggle to Complete and Control Nord Stream 2</subfield><subfield code="c">Bartosz Bieliszczuk</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Warszawa [Poland]</subfield><subfield code="b">Polski Instytut Spraw Międzynarodowych</subfield><subfield code="c">2020</subfield></datafield><datafield tag="264" ind1=" " ind2="2"><subfield code="a">Frankfurt M.</subfield><subfield code="b">CEEOL</subfield><subfield code="c">2020</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">1 Online-Ressource (2 Seiten)</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">Russia's plans to complete the construction of Nord Stream 2 (NS2) and maintain Gazprom's control over the gas pipeline after its launch are facing serious obstacles. The main challenges to the Russian company are that the key contractor has withdrawn from the project fearing U.S. sanctions and the requirement to apply EU law to the pipeline. Russia is now trying to finish NS2 construction using its own means and ensure that the institutions regulating the status of the pipeline interpret EU law in Gazprom's favour</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Supranational / Global Economy</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Governance</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Environmental and Energy policy</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">International relations/trade</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">EU-Legislation</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Transport / Logistics</subfield></datafield><datafield tag="710" ind1="2" ind2=" "><subfield code="a">Central and Eastern European Online Library</subfield><subfield code="e">Sonstige</subfield><subfield code="4">oth</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">ZDB-45-CGR</subfield></datafield><datafield tag="940" ind1="1" ind2=" "><subfield code="n">oe</subfield></datafield><datafield tag="940" ind1="1" ind2=" "><subfield code="q">BSB_OE_CEEOL</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-034793278</subfield></datafield><datafield tag="966" ind1="e" ind2=" "><subfield code="u">https://www.ceeol.com/search/gray-literature-detail?id=856563</subfield><subfield code="l">BSB01</subfield><subfield code="p">ZDB-45-CGR</subfield><subfield code="x">Verlag</subfield><subfield code="3">Volltext</subfield></datafield></record></collection>
id DE-604.BV049447383
illustrated Not Illustrated
index_date 2024-07-03T23:12:51Z
indexdate 2024-07-10T10:07:26Z
institution BVB
language English
oai_aleph_id oai:aleph.bib-bvb.de:BVB01-034793278
oclc_num 1414550162
open_access_boolean
owner DE-12
owner_facet DE-12
physical 1 Online-Ressource (2 Seiten)
psigel ZDB-45-CGR
BSB_OE_CEEOL
publishDate 2020
publishDateSearch 2020
publishDateSort 2020
publisher Polski Instytut Spraw Międzynarodowych
record_format marc
spelling Bieliszczuk, Bartosz Verfasser aut
Gazprom's Struggle to Complete and Control Nord Stream 2 Bartosz Bieliszczuk
Warszawa [Poland] Polski Instytut Spraw Międzynarodowych 2020
Frankfurt M. CEEOL 2020
1 Online-Ressource (2 Seiten)
txt rdacontent
c rdamedia
cr rdacarrier
Russia's plans to complete the construction of Nord Stream 2 (NS2) and maintain Gazprom's control over the gas pipeline after its launch are facing serious obstacles. The main challenges to the Russian company are that the key contractor has withdrawn from the project fearing U.S. sanctions and the requirement to apply EU law to the pipeline. Russia is now trying to finish NS2 construction using its own means and ensure that the institutions regulating the status of the pipeline interpret EU law in Gazprom's favour
Supranational / Global Economy
Governance
Environmental and Energy policy
International relations/trade
EU-Legislation
Transport / Logistics
Central and Eastern European Online Library Sonstige oth
spellingShingle Bieliszczuk, Bartosz
Gazprom's Struggle to Complete and Control Nord Stream 2
Supranational / Global Economy
Governance
Environmental and Energy policy
International relations/trade
EU-Legislation
Transport / Logistics
title Gazprom's Struggle to Complete and Control Nord Stream 2
title_auth Gazprom's Struggle to Complete and Control Nord Stream 2
title_exact_search Gazprom's Struggle to Complete and Control Nord Stream 2
title_exact_search_txtP Gazprom's Struggle to Complete and Control Nord Stream 2
title_full Gazprom's Struggle to Complete and Control Nord Stream 2 Bartosz Bieliszczuk
title_fullStr Gazprom's Struggle to Complete and Control Nord Stream 2 Bartosz Bieliszczuk
title_full_unstemmed Gazprom's Struggle to Complete and Control Nord Stream 2 Bartosz Bieliszczuk
title_short Gazprom's Struggle to Complete and Control Nord Stream 2
title_sort gazprom s struggle to complete and control nord stream 2
topic Supranational / Global Economy
Governance
Environmental and Energy policy
International relations/trade
EU-Legislation
Transport / Logistics
topic_facet Supranational / Global Economy
Governance
Environmental and Energy policy
International relations/trade
EU-Legislation
Transport / Logistics
work_keys_str_mv AT bieliszczukbartosz gazpromsstruggletocompleteandcontrolnordstream2
AT centralandeasterneuropeanonlinelibrary gazpromsstruggletocompleteandcontrolnordstream2