Introduction to Cut-off Grade Estimation
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Elektronisch E-Book |
Sprache: | English |
Veröffentlicht: |
Littleton
SME
2008
|
Schlagworte: | |
Online-Zugang: | FAW01 FAW02 Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
MARC
LEADER | 00000nmm a2200000zc 4500 | ||
---|---|---|---|
001 | BV043155612 | ||
003 | DE-604 | ||
005 | 00000000000000.0 | ||
007 | cr|uuu---uuuuu | ||
008 | 151126s2008 |||| o||u| ||||||eng d | ||
020 | |a 087335284X |c electronic bk. |9 0-87335-284-X | ||
020 | |a 9780873352840 |c electronic bk. |9 978-0-87335-284-0 | ||
035 | |a (OCoLC)609846004 | ||
035 | |a (DE-599)BVBBV043155612 | ||
040 | |a DE-604 |b ger |e aacr | ||
041 | 0 | |a eng | |
049 | |a DE-1046 |a DE-1047 | ||
082 | 0 | |a 622.7 | |
100 | 1 | |a Rendu, Jean-Michel |e Verfasser |4 aut | |
245 | 1 | 0 | |a Introduction to Cut-off Grade Estimation |
264 | 1 | |a Littleton |b SME |c 2008 | |
300 | |a 1 Online-Ressource (115 pages) | ||
336 | |b txt |2 rdacontent | ||
337 | |b c |2 rdamedia | ||
338 | |b cr |2 rdacarrier | ||
500 | |a Cover; Title; Copyright; Contents; Preface; CHAPTER 1: Introduction; CHAPTER 2: General Principles; CHAPTER 3: Minimum Cut-off Grades; CHAPTER 4: Cut-off Grade for Polymetallic Deposits; CHAPTER 5: Cut-off Grade and Optimization of Processing Plant Operating Conditions; CHAPTER 6: Cut-off Grade and Mine Planning-Open Pit and Underground Selective Mining; CHAPTER 7: Cut-off Grade and Mine Planning- Block and Panel Caving; CHAPTER 8: Which Costs Should Be Included in Cut-off Grade Calculations?; CHAPTER 9: When Marginal Analysis No Longer Applies: A Gold Leaching Operation | ||
500 | |a CHAPTER 10: Mining Capacity and Cut-off Grade When Processing Capacity Is FixedCHAPTER 11: Processing Capacity and Cut-off Grade When Mining Capacity Is Fixed; CHAPTER 12: Mining and Processing Capacity and Cut-off Grade When Sales Volume Is Fixed; CHAPTER 13: Releasing Capacity Constraints: A Base Metal Example; CHAPTER 14: Relationship Between Mine Selectivity, Deposit Modeling, Ore Control, and Cut-off Grade; CHAPTER 15: Conclusio | ||
500 | |a An Introduction to Cut-off Grade Estimation examines one of the most important calculations in the mining industry. Cut-off grades are essential to determining the economic feasibility and mine life of a project. Increased cut-off grades can reduce political risks by ensuring higher financial returns over a shorter period of time. Conversely, lower cut-off grades may increase project life with longer economic benefits to shareowners, employees, and local communities. Cut-off grades also impact reported reserves, which are closely monitored by stock exchanges and regulatory agencies. Author Dr | ||
650 | 7 | |a TECHNOLOGY & ENGINEERING / Mining |2 bisacsh | |
650 | 7 | |a Ores / Grading |2 fast | |
650 | 7 | |a Ores / Sampling and estimation |2 fast | |
650 | 4 | |a Ores |x Grading | |
650 | 4 | |a Ores |x Sampling and estimation | |
856 | 4 | 0 | |u http://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&db=nlabk&AN=439082 |x Aggregator |3 Volltext |
912 | |a ZDB-4-EBA | ||
999 | |a oai:aleph.bib-bvb.de:BVB01-028579803 | ||
966 | e | |u http://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&db=nlabk&AN=439082 |l FAW01 |p ZDB-4-EBA |q FAW_PDA_EBA |x Aggregator |3 Volltext | |
966 | e | |u http://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&db=nlabk&AN=439082 |l FAW02 |p ZDB-4-EBA |q FAW_PDA_EBA |x Aggregator |3 Volltext |
Datensatz im Suchindex
_version_ | 1804175620386586624 |
---|---|
any_adam_object | |
author | Rendu, Jean-Michel |
author_facet | Rendu, Jean-Michel |
author_role | aut |
author_sort | Rendu, Jean-Michel |
author_variant | j m r jmr |
building | Verbundindex |
bvnumber | BV043155612 |
collection | ZDB-4-EBA |
ctrlnum | (OCoLC)609846004 (DE-599)BVBBV043155612 |
dewey-full | 622.7 |
dewey-hundreds | 600 - Technology (Applied sciences) |
dewey-ones | 622 - Mining and related operations |
dewey-raw | 622.7 |
dewey-search | 622.7 |
dewey-sort | 3622.7 |
dewey-tens | 620 - Engineering and allied operations |
discipline | Bergbau / Hüttenwesen |
format | Electronic eBook |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>03179nmm a2200421zc 4500</leader><controlfield tag="001">BV043155612</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">00000000000000.0</controlfield><controlfield tag="007">cr|uuu---uuuuu</controlfield><controlfield tag="008">151126s2008 |||| o||u| ||||||eng d</controlfield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">087335284X</subfield><subfield code="c">electronic bk.</subfield><subfield code="9">0-87335-284-X</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9780873352840</subfield><subfield code="c">electronic bk.</subfield><subfield code="9">978-0-87335-284-0</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)609846004</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV043155612</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">aacr</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-1046</subfield><subfield code="a">DE-1047</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">622.7</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Rendu, Jean-Michel</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Introduction to Cut-off Grade Estimation</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Littleton</subfield><subfield code="b">SME</subfield><subfield code="c">2008</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">1 Online-Ressource (115 pages)</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">Cover; Title; Copyright; Contents; Preface; CHAPTER 1: Introduction; CHAPTER 2: General Principles; CHAPTER 3: Minimum Cut-off Grades; CHAPTER 4: Cut-off Grade for Polymetallic Deposits; CHAPTER 5: Cut-off Grade and Optimization of Processing Plant Operating Conditions; CHAPTER 6: Cut-off Grade and Mine Planning-Open Pit and Underground Selective Mining; CHAPTER 7: Cut-off Grade and Mine Planning- Block and Panel Caving; CHAPTER 8: Which Costs Should Be Included in Cut-off Grade Calculations?; CHAPTER 9: When Marginal Analysis No Longer Applies: A Gold Leaching Operation</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">CHAPTER 10: Mining Capacity and Cut-off Grade When Processing Capacity Is FixedCHAPTER 11: Processing Capacity and Cut-off Grade When Mining Capacity Is Fixed; CHAPTER 12: Mining and Processing Capacity and Cut-off Grade When Sales Volume Is Fixed; CHAPTER 13: Releasing Capacity Constraints: A Base Metal Example; CHAPTER 14: Relationship Between Mine Selectivity, Deposit Modeling, Ore Control, and Cut-off Grade; CHAPTER 15: Conclusio</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">An Introduction to Cut-off Grade Estimation examines one of the most important calculations in the mining industry. Cut-off grades are essential to determining the economic feasibility and mine life of a project. Increased cut-off grades can reduce political risks by ensuring higher financial returns over a shorter period of time. Conversely, lower cut-off grades may increase project life with longer economic benefits to shareowners, employees, and local communities. Cut-off grades also impact reported reserves, which are closely monitored by stock exchanges and regulatory agencies. Author Dr</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">TECHNOLOGY & ENGINEERING / Mining</subfield><subfield code="2">bisacsh</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Ores / Grading</subfield><subfield code="2">fast</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Ores / Sampling and estimation</subfield><subfield code="2">fast</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Ores</subfield><subfield code="x">Grading</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Ores</subfield><subfield code="x">Sampling and estimation</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">http://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&db=nlabk&AN=439082</subfield><subfield code="x">Aggregator</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">ZDB-4-EBA</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-028579803</subfield></datafield><datafield tag="966" ind1="e" ind2=" "><subfield code="u">http://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&db=nlabk&AN=439082</subfield><subfield code="l">FAW01</subfield><subfield code="p">ZDB-4-EBA</subfield><subfield code="q">FAW_PDA_EBA</subfield><subfield code="x">Aggregator</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="966" ind1="e" ind2=" "><subfield code="u">http://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&db=nlabk&AN=439082</subfield><subfield code="l">FAW02</subfield><subfield code="p">ZDB-4-EBA</subfield><subfield code="q">FAW_PDA_EBA</subfield><subfield code="x">Aggregator</subfield><subfield code="3">Volltext</subfield></datafield></record></collection> |
id | DE-604.BV043155612 |
illustrated | Not Illustrated |
indexdate | 2024-07-10T07:19:11Z |
institution | BVB |
isbn | 087335284X 9780873352840 |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-028579803 |
oclc_num | 609846004 |
open_access_boolean | |
owner | DE-1046 DE-1047 |
owner_facet | DE-1046 DE-1047 |
physical | 1 Online-Ressource (115 pages) |
psigel | ZDB-4-EBA ZDB-4-EBA FAW_PDA_EBA |
publishDate | 2008 |
publishDateSearch | 2008 |
publishDateSort | 2008 |
publisher | SME |
record_format | marc |
spelling | Rendu, Jean-Michel Verfasser aut Introduction to Cut-off Grade Estimation Littleton SME 2008 1 Online-Ressource (115 pages) txt rdacontent c rdamedia cr rdacarrier Cover; Title; Copyright; Contents; Preface; CHAPTER 1: Introduction; CHAPTER 2: General Principles; CHAPTER 3: Minimum Cut-off Grades; CHAPTER 4: Cut-off Grade for Polymetallic Deposits; CHAPTER 5: Cut-off Grade and Optimization of Processing Plant Operating Conditions; CHAPTER 6: Cut-off Grade and Mine Planning-Open Pit and Underground Selective Mining; CHAPTER 7: Cut-off Grade and Mine Planning- Block and Panel Caving; CHAPTER 8: Which Costs Should Be Included in Cut-off Grade Calculations?; CHAPTER 9: When Marginal Analysis No Longer Applies: A Gold Leaching Operation CHAPTER 10: Mining Capacity and Cut-off Grade When Processing Capacity Is FixedCHAPTER 11: Processing Capacity and Cut-off Grade When Mining Capacity Is Fixed; CHAPTER 12: Mining and Processing Capacity and Cut-off Grade When Sales Volume Is Fixed; CHAPTER 13: Releasing Capacity Constraints: A Base Metal Example; CHAPTER 14: Relationship Between Mine Selectivity, Deposit Modeling, Ore Control, and Cut-off Grade; CHAPTER 15: Conclusio An Introduction to Cut-off Grade Estimation examines one of the most important calculations in the mining industry. Cut-off grades are essential to determining the economic feasibility and mine life of a project. Increased cut-off grades can reduce political risks by ensuring higher financial returns over a shorter period of time. Conversely, lower cut-off grades may increase project life with longer economic benefits to shareowners, employees, and local communities. Cut-off grades also impact reported reserves, which are closely monitored by stock exchanges and regulatory agencies. Author Dr TECHNOLOGY & ENGINEERING / Mining bisacsh Ores / Grading fast Ores / Sampling and estimation fast Ores Grading Ores Sampling and estimation http://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&db=nlabk&AN=439082 Aggregator Volltext |
spellingShingle | Rendu, Jean-Michel Introduction to Cut-off Grade Estimation TECHNOLOGY & ENGINEERING / Mining bisacsh Ores / Grading fast Ores / Sampling and estimation fast Ores Grading Ores Sampling and estimation |
title | Introduction to Cut-off Grade Estimation |
title_auth | Introduction to Cut-off Grade Estimation |
title_exact_search | Introduction to Cut-off Grade Estimation |
title_full | Introduction to Cut-off Grade Estimation |
title_fullStr | Introduction to Cut-off Grade Estimation |
title_full_unstemmed | Introduction to Cut-off Grade Estimation |
title_short | Introduction to Cut-off Grade Estimation |
title_sort | introduction to cut off grade estimation |
topic | TECHNOLOGY & ENGINEERING / Mining bisacsh Ores / Grading fast Ores / Sampling and estimation fast Ores Grading Ores Sampling and estimation |
topic_facet | TECHNOLOGY & ENGINEERING / Mining Ores / Grading Ores / Sampling and estimation Ores Grading Ores Sampling and estimation |
url | http://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&db=nlabk&AN=439082 |
work_keys_str_mv | AT rendujeanmichel introductiontocutoffgradeestimation |