Engineering project appraisal

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Rogers, Martin (VerfasserIn), Duffy, Aidan (VerfasserIn)
Format: Buch
Sprache:English
Veröffentlicht: Oxford Wiley-Blackwell 2012
Ausgabe:2. ed.
Schlagworte:
Online-Zugang:Inhaltsverzeichnis
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!

MARC

LEADER 00000nam a2200000zc 4500
001 BV040368338
003 DE-604
005 20130123
007 t|
008 120817s2012 xxk |||| 00||| eng d
010 |a 2012003455 
020 |a 9780470672990  |c pbk. : alk. paper  |9 978-0-470-67299-0 
035 |a (OCoLC)801784413 
035 |a (DE-599)BVBBV040368338 
040 |a DE-604  |b ger  |e aacr 
041 0 |a eng 
044 |a xxk  |c GB 
049 |a DE-703 
050 0 |a TA183 
082 0 |a 658.4/04 
084 |a ZG 9230  |0 (DE-625)156052:  |2 rvk 
100 1 |a Rogers, Martin  |e Verfasser  |4 aut 
245 1 0 |a Engineering project appraisal  |c Martin Rogers ; Aidan Duffy 
250 |a 2. ed. 
264 1 |a Oxford  |b Wiley-Blackwell  |c 2012 
300 |a XVIII, 378 S. 
336 |b txt  |2 rdacontent 
337 |b n  |2 rdamedia 
338 |b nc  |2 rdacarrier 
650 4 |a Ingenieurwissenschaften 
650 4 |a Engineering  |x Costs 
650 4 |a Engineering  |x Management 
650 0 7 |a Kostenberechnung  |0 (DE-588)4219304-7  |2 gnd  |9 rswk-swf 
650 0 7 |a Ingenieur  |0 (DE-588)4026955-3  |2 gnd  |9 rswk-swf 
650 0 7 |a Kostenanalyse  |0 (DE-588)4032580-5  |2 gnd  |9 rswk-swf 
650 0 7 |a Projektcontrolling  |0 (DE-588)4273818-0  |2 gnd  |9 rswk-swf 
650 0 7 |a Projektmanagement  |0 (DE-588)4047441-0  |2 gnd  |9 rswk-swf 
650 0 7 |a Management  |0 (DE-588)4037278-9  |2 gnd  |9 rswk-swf 
650 0 7 |a Ingenieurwissenschaften  |0 (DE-588)4137304-2  |2 gnd  |9 rswk-swf 
650 0 7 |a Projektbewertung  |0 (DE-588)4175874-2  |2 gnd  |9 rswk-swf 
650 0 7 |a Projektauswahl  |0 (DE-588)4125458-2  |2 gnd  |9 rswk-swf 
689 0 0 |a Ingenieur  |0 (DE-588)4026955-3  |D s 
689 0 1 |a Management  |0 (DE-588)4037278-9  |D s 
689 0 2 |a Projektmanagement  |0 (DE-588)4047441-0  |D s 
689 0 |5 DE-604 
689 1 0 |a Ingenieurwissenschaften  |0 (DE-588)4137304-2  |D s 
689 1 1 |a Projektmanagement  |0 (DE-588)4047441-0  |D s 
689 1 |5 DE-604 
689 2 0 |a Ingenieur  |0 (DE-588)4026955-3  |D s 
689 2 1 |a Projektmanagement  |0 (DE-588)4047441-0  |D s 
689 2 2 |a Projektcontrolling  |0 (DE-588)4273818-0  |D s 
689 2 3 |a Projektauswahl  |0 (DE-588)4125458-2  |D s 
689 2 |5 DE-604 
689 3 0 |a Ingenieur  |0 (DE-588)4026955-3  |D s 
689 3 1 |a Projektmanagement  |0 (DE-588)4047441-0  |D s 
689 3 2 |a Kostenanalyse  |0 (DE-588)4032580-5  |D s 
689 3 3 |a Kostenberechnung  |0 (DE-588)4219304-7  |D s 
689 3 |5 DE-604 
689 4 0 |a Projektbewertung  |0 (DE-588)4175874-2  |D s 
689 4 |8 1\p  |5 DE-604 
700 1 |a Duffy, Aidan  |e Verfasser  |4 aut 
856 4 2 |m SWB Datenaustausch  |q application/pdf  |u http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=025222003&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA  |3 Inhaltsverzeichnis 
883 1 |8 1\p  |a cgwrk  |d 20201028  |q DE-101  |u https://d-nb.info/provenance/plan#cgwrk 
943 1 |a oai:aleph.bib-bvb.de:BVB01-025222003 

Datensatz im Suchindex

_version_ 1819651567514550272
adam_text IMAGE 1 CONTENTS PREFACE, XIII INTRODUCTION, XV PART 1 ECONOMICS-BASED PROJECT APPRAISAL TECHNIQUES, 1 1 DECISION MAKING AND PROJECT APPRAISAL, 3 1.1 DECISION MAKING CONTEXT, 3 1.2 TECHNIQUES FOR DECISION MAKING, 4 1.2.1 NON-ANALYTICAL DECISION MAKING, 4 1.2.2 ANALYTICAL DECISION MAKING, 6 1.2.3 REASONED CHOICE, 6 1.2.4 CLASSICAL RATIONAL DECISION MAKING, 7 1.2.5 BEHAVIOURAL DECISION MAKING, 10 1.2.6 IRRATIONAL DECISION MAKING, 11 1.2.7 POLITICAL INVOLVEMENT IN THE PROJECT PLANNING PROCESS, 12 1.3 PRIMACY OF THE RATIONAL MODEL, 13 1.4 DECISION-MAKING CONDITIONS, 14 1.4.1 CERTAINTY, 14 1.4.2 RISK, 15 1.4.3 UNCERTAINTY, 15 1.5 PROJECT PLANNING PROCESS, 16 1.5.1 IDENTIFYING PROJECT OPTIONS, 16 1.5.2 IDENTIFYING ATTRIBUTES/CRITERIA OF EVALUATION, 17 1.5.3 METHODS FOR ENGINEERING PROJECT APPRAISAL, 19 1.6 EXAMPLE OF A DECISION PROCESS, 22 1.6.1 CASE STUDY 1: ECONOMIC ANALYSIS OF ALTERNATIVE PORT ACCESS ROUTES FOR A MAJOR CITY, 23 1.6.2 CASE STUDY 2: MULTICRITERIA ANALYSIS OF ALTERNATIVE WASTE MANAGEMENT STRATEGIES FOR A REGION, 24 1.7 SUMMARY, 25 1.8 REVIEW OF SUCCEEDING CHAPTERS, 26 REFERENCES, 27 IMAGE 2 VI CONTENTS 2 BASIC TOOLS FOR ECONOMIC APPRAISAL, 29 2.1 INTRODUCTION, 29 2.2 THE TIME VALUE OF MONEY, 29 2.3 THE ESTIMATION OF INTEREST, 30 2.4 SIMPLE AND COMPOUND INTEREST, 31 2.5 NOMINAL AND EFFECTIVE INTEREST RATES, 33 2.5.1 NOMINAL INTEREST RATES, 33 2.5.2 EFFECTIVE INTEREST RATES, 34 2.6 CONTINUOUS COMPOUNDING, 34 2.7 TIME EQUIVALENCE, 35 2.8 ECONOMIC COMPUTATION, 37 2.8.1 SYMBOLS, 37 2.8.2 FORMULAE FOR SINGLE PAYMENTS, 38 2.8.3 UNIFORM SERIES FORMULAE, 39 2.8.4 GEOMETRIC SERIES FORMULAE, 43 2.8.5 CALCULATIONS INVOLVING UNKNOWN INTEREST RATES, 46 2.8.6 CALCULATION OF UNKNOWN YEARS, 48 2.8.7 ADDITIONAL EXAMPLES, 48 2.9 SUMMARY, 50 3 PRESENT WORTH EVALUATION, 51 3.1 INTRODUCTION, 51 3.2 PRESENT WORTH - THE COMPARISON PROCESS, 52 3.2.1 COMPARING OPTIONS WITH EQUAL LIVES, 52 3.2.2 COMPARING OPTIONS WITH UNEQUAL LIVES, 53 3.2.3 COMPARING OPTIONS WITH INFINITE LIVES, 55 3.2.4 LIFE-CYCLE COST ANALYSIS, 58 3.2.5 PAYBACK COMPARISON METHOD, 60 3.2.6 ADDITIONAL EXAMPLES, 63 3.3 SUMMARY, 65 4 EQUIVALENT ANNUAL WORTH COMPUTATIONS, 67 4.1 INTRODUCTION, 67 4.2 THE PATTERN OF CAPITAL RECOVERY, 67 4.3 MODIFYING ANNUAL PAYMENTS TO INCLUDE SALVAGE VALUE, 69 4.4 EVALUATING A SINGLE PROJECT, 71 4.5 THE COMPARISON PROCESS, 72 4.5.1 INTRODUCTION, 72 4.5.2 EQUAL LIFE PROJECTS, 72 4.5.3 LEASE OR BUY? 72 4.5.4 PROJECTS WITH DIFFERENT LIVES, 73 4.5.5 PROJECTS WITH INFINITE LIVES, 75 4.6 SUMMARY, 77 IMAGE 3 CONTENTS VII RATE OF RETURN COMPUTATION, 79 5.1 INTRODUCTION, 79 5.2 MINIMUM ACCEPTABLE RATE OF RETURN (MARR), 79 5.3 INTERNAL RATE OF RETURN (IRR), 80 5.4 IRR FOR A SINGLE PROJECT, 80 5.4.1 CALCULATING IRR FOR A SINGLE PROJECT USING PRESENT WORTH, 80 5.4.2 CALCULATING IRR FOR A SINGLE PROJECT USING ANNUAL WORTH, 82 5.4.3 SINGLE PROJECTS WITH MORE THAN ONE POSSIBLE RATE OF RETURN, 82 5.4.4 EXTERNAL RATE OF RETURN (ERR), 83 5.4.5 HISTORICAL EXTERNAL RATE OF RETURN (HERR), 84 5.4.6 PROJECT BALANCE METHOD, 85 5.4.7 UNEQUAL LIVES, 86 5.5 INCREMENTAL ANALYSIS, 87 5.5.1 USING RATE OF RETURN ANALYSIS FOR RANKING MULTIPLE MUTUALLY EXCLUSIVE OPTIONS, 89 5.5.2 USING IRR TO ANALYSE OPTIONS WITH DIFFERENT LIVES, 93 5.6 SUMMARY, 94 BENEFIT/COST RATIO, DEPRECIATION AND TAXATION, 96 6. 1 INTRODUCTION, 96 6.2 COSTS, BENEFITS AND DISBENEFITS, 96 6.3 ESTIMATING THE BENEFIT/COST RATIO FOR A SINGLE PROJECT, 97 6.4 COMPARING MUTUALLY EXCLUSIVE OPTIONS USING INCREMENTAL BENEFIT/COST RATIOS, 98 6.5 DEPRECIATION, 99 6.5.1 STRAIGHT-LINE DEPRECIATION, 99 6.5.2 DECLINING BALANCE DEPRECIATION, 100 6.6 TAXATION, 102 6.7 SUMMARY, 104 6.7.1 BENEFIT/COST RATIO, 104 6.7.2 DEPRECIATION, 105 COST-BENEFIT ANALYSIS OF PUBLIC PROJECTS, 107 7.1 INTRODUCTION, 107 7.2 HISTORICAL BACKGROUND TO COST-BENEFIT ANALYSIS, 108 7.3 THEORETICAL BASIS FOR COST-BENEFIT ANALYSIS, 110 7.4 THE PROCEDURE OF COST-BENEFIT ANALYSIS, 111 7.5 IDENTIFYING THE MAIN PROJECT OPTIONS, 111 7.6 IDENTIFYING COSTS AND BENEFITS, 111 7.7 PLACING VALUATIONS ON ALL COSTS AND BENEFITS/DISBENEFITS, 112 7.7.1 SHADOW PRICING, 113 7.7.2 NON-MARKET VALUATION OF COSTS/BENEFITS, 114 7.8 ASSESSING AND COMPARING THE COST-BENEFIT PERFORMANCE OF OPTIONS, 115 7.9 SENSITIVITY ANALYSIS, 117 IMAGE 4 VIII CONTENTS 7.10 FINAL DECISION, 119 7.11 CASE STUDY: THE COST-BENEFIT ANALYSIS OF A HIGHWAY IMPROVEMENT PROJECT, 119 7.11.1 BACKGROUND TO COST-BENEFIT ANALYSIS FOR TRANSPORT PROJECTS, 119 7.11.2 INTRODUCTION TO THE CASE STUDY, 122 7.11.3 DATA, 122 7.11.4 SOLUTION, 123 7.12 CASE STUDY: WATER SUPPLY SCHEME IN A DEVELOPING COUNTRY, 128 7.12.1 BACKGROUND TO COST/BENEFIT ANALYSIS OF WATER PROJECTS, 128 7.12.2 INTRODUCTION TO THE CASE STUDY, 131 7.12.3 SOLUTION, 131 7.13 CASE STUDY: COST-BENEFIT ANALYSIS OF SEWER FLOODING ALLEVIATION, 135 7.13.1 INTRODUCTION TO THE CASE STUDY, 135 7.13.2 SOLUTION, 135 7.14 ADVANTAGES AND DISADVANTAGES OF TRADITIONAL COST-BENEFIT ANALYSIS, 137 7.15 TECHNIQUES FOR VALUING NON-ECONOMIC IMPACTS, 138 7.15.1 TECHNIQUES USING SURROGATE MARKET PRICES, 138 7.15.2 CONTINGENT VALUATION METHODS, 143 7.15.3 INTEGRATING SUSTAINABILITY INTO COST-BENEFIT ANALYSIS, 147 7.16 USING COST-BENEFIT ANALYSIS WITHIN DIFFERENT AREAS OF ENGINEERING, 148 7.16.1 FLOOD ALLEVIATION, 148 7.16.2 HEALTH, 149 7.16.3 AGRICULTURE/IRRIGATION, 149 7.16.4 TRANSPORT, 150 7.17 SUMMARY, 151 REFERENCES, 152 ECONOMIC ANALYSIS OF RENEWABLE ENERGY SUPPLY AND ENERGY EFFICIENT PROJECTS, 154 8.1 INTRODUCTION, 154 8.2 POLICY CONTEXT, 154 8.3 RENEWABLE ENERGY SUPPLY AND ENERGY EFFICIENT TECHNOLOGIES, 157 8.3.1 FOSSIL-FUELLED POWER GENERATION, 158 8.3.2 BIOMASS AND BIOENERGY, 159 8.3.3 WIND POWER, 160 8.3.4 SOLAR ENERGY, 162 8.3.5 BUILDINGS, 162 8.4 ECONOMIC MEASURES FOR RENEWABLE ENERGY AND ENERGY EFFICIENT PROJECTS, 163 8.4.1 ASPECTS OF RENEWABLE ENERGY SUPPLY AND ENERGY EFFICIENT ANALYSIS, 163 8.4.2 CONVENTIONAL ECONOMIC MEASURES, 171 8.4.3 SPECIAL ECONOMIC MEASURES, 176 8.4.4 CHOOSING ECONOMIC MEASURES, 178 8.5 ESTIMATING GHG EMISSIONS, 179 8.5.1 LIFE-CYCLE ASSESSMENT, 179 8.5.2 CARBON DIOXIDE EQUIVALENT, 180 IMAGE 5 CONTENTS IX 8.5.3 ENERGY AND GHG ACCOUNTING METHODS, 181 8.5.4 MARGINAL ABATEMENT COST OF CARBON, 183 8.6 UNCERTAINTY, 183 8.6.1 SENSITIVITY ANALYSIS, 185 8.6.2 SCENARIOS, 185 8.6.3 MONTE CARLO ANALYSIS, 186 8.7 CASE STUDIES, 186 8.7.1 COMPRESSED AIR ENERGY STORAGE, 186 8.7.2 POLICY ASSESSMENT OF DOMESTIC PV, 189 REFERENCES, 191 VALUE FOR MONEY IN CONSTRUCTION, 193 9.1 DEFINITION OF VALUE FOR MONEY, 193 9.2 DEFINING VALUE FOR MONEY IN THE CONTEXT OF A CONSTRUCTION PROJECT, 194 9.3 ACHIEVING VALUE FOR MONEY DURING CONSTRUCTION, 194 9.4 WHOLE-LIFE COSTING, 195 9.4.1 RELATIONSHIP BETWEEN VALUE FOR MONEY FRAMEWORK AND WHOLE-LIFE DECISION MAKING, 195 9.4.2 BASELINE COSTS VS. ACTUAL PERFORMANCE OVER WHOLE-LIFE , 196 9.5 THE CONCEPT OF MILESTONES , 196 9.5.1 VALUE FOR MONEY REVIEW, 196 9.5.2 FINANCIAL REVIEW, 197 9.5.3 PROJECT MANAGEMENT DELIVERY SYSTEMS REVIEW, 197 9.6 DETAILED DESCRIPTION OF THE VALUE FOR MONEY FRAMEWORK, 197 9.6.1 VALUE MANAGEMENT, 199 9.6.2 RISK MANAGEMENT, 201 9.6.3 PROJECT EXECUTION PLAN, 203 9.6.4 CONTROL PROCEDURES, 204 9.6.5 PROJECT REPORTS, 205 9.7 VALUE FOR MONEY AND DESIGN, 206 9.7.1 MAXIMISING BUSINESS EFFECTIVENESS, 207 9.7.2 DELIVERING EFFECTIVE PROJECT MANAGEMENT, 207 9.7.3 ACHIEVING THE REQUIRED FINANCIAL PERFORMANCE, 208 9.7.4 ACHIEVING A POSITIVE IMPACT ON THE LOCAL ENVIRONMENT, 209 9.7.5 MINIMISING OPERATIONAL MAINTENANCE COSTS AND ENVIRONMENTAL IMPACT, 209 9.7.6 ENSURING COMPLIANCE WITH THIRD-PARTY REQUIREMENTS, 210 9.7.7 ASSESSING THE RELATIVE IMPORTANCE OF THE DIFFERENT VALUE DRIVERS, 210 9.7.8 CONCLUDING COMMENTS ON ACHIEVING VALUE FOR MONEY THROUGH GOOD DESIGN, 210 9.8 IS THERE A CONFLICT BETWEEN SUSTAINABILITY AND VALUE FOR MONEY, 211 IMAGE 6 X CONTENTS 9.9 THE ROLE OF BETTER MANAGED CONSTRUCTION IN DELIVERING PROJECTS ON TIME AND WITHIN BUDGET, 213 9.9.1 ESTABLISHING EFFECTIVE CONSTRUCTION PROGRAMMES, 214 9.9.2 DEVELOPING AND SUPPORTING WELL-FOCUSED AND CAPABLE CLIENTS, 214 9.9.3 BASING BOTH DESIGN AND DECISION MAKING ON WHOLE-LIFE COSTING, 214 9.9.4 USING APPROPRIATE PROCUREMENT AND CONTRACTING STRATEGIES, 214 9.9.5 WORKING COLLABORATIVELY THROUGH FULLY INTEGRATED TEAMS, 214 9.9.6 EVALUATING THE PROJECT S PERFORMANCE, 215 REFERENCES, 215 10 OTHER ECONOMIC ANALYSIS TECHNIQUES, 216 10.1 INTRODUCTION, 216 10.2 COST EFFECTIVENESS, 216 10.2.1 FINAL COMMENT, 219 10.3 THE PLANNED BALANCE SHEET, 220 10.3.1 THE RELEVANCE OF PURE CBA TO PLANNING PROBLEMS, 221 10.3.2 LICHFIELD S PLANNED BALANCE SHEET, 222 10.3.3 LAYOUT OF THE PLANNED BALANCE SHEET, 224 10.3.4 CONCLUSIONS, 227 10.4 HILL S GOAL ACHIEVEMENT MATRIX, 227 10.4.1 GOAL ACHIEVEMENT MATRIX AND THE RATIONAL PLANNING PROCESS, 228 10.4.2 THE BASIC STEPS USED TO FORM THE MATRIX, 229 10.4.3 FORMULATING THE OBJECTIVES, 229 10.4.4 EVALUATING COSTS AND BENEFITS WITHIN THE GOAL ACHIEVEMENT MATRIX, 230 10.4.5 THE STRUCTURE OF THE MATRIX, 231 10.4.6 UNCERTAINTY WITHIN GOAL ACHIEVEMENT MATRIX, 232 10.4.7 THE SIMPLIFIED GOAL ACHIEVEMENT METHOD, 232 10.4.8 AN ADVANCED VERSION OF THE GOAL ACHIEVEMENT MATRIX, 234 10.4.9 CONCLUDING NOTES ON THE GOAL ACHIEVEMENT MATRIX, 236 10.5 SUMMARY, 239 REFERENCES, 240 PART 2 NON-ECONOMIC-BASED PROJECT APPRAISAL TECHNIQUES, 241 11 MULTICRITERIA ANALYSIS, 243 11.1 INTRODUCTION, 243 11.2 MULTICRITERIA EVALUATION MODELS, 244 11.3 SIMPLE NON-COMPENSATORY METHODS, 246 11.3.1 DOMINANCE, 246 11.3.2 SATISFICING METHODS, 248 IMAGE 7 CONTENTS XI 11.3.3 SEQUENTIAL ELIMINATION METHODS, 250 11.3.4 ATTITUDE-ORIENTED METHODS, 253 11.4 SUMMARY, 255 REFERENCES, 256 12 THE SIMPLE ADDITIVE MODEL, 257 12.1 BACKGROUND, 257 12.2 INTRODUCTION TO THE SIMPLE ADDITIVE WEIGHTING (SAW) METHOD, 259 12.3 SENSITIVITY TESTING, 261 12.4 PROBABILISTIC ADDITIVE WEIGHTING, 264 12.4.1 EXPECTED VALUE, 265 12.4.2 VARIANCE, 266 12.5 ASSIGNING WEIGHTS TO THE DECISION CRITERIA, 270 12.5.1 PRESUMPTION OF EQUAL WEIGHTS, 270 12.5.2 RANKING SYSTEM FOR OBTAINING WEIGHTS, 270 12.5.3 RATIO SYSTEM FOR OBTAINING WEIGHTS, 272 12.5.4 PAIRWISE COMPARISON WEIGHTING SYSTEM, 273 12.5.5 THE RESISTANCE-TO-CHANGE GRID, 274 12.5.6 HIERARCHY OF WEIGHTS, 276 12.5.7 MULTIPLE WEIGHTING SYSTEMS, 279 12.5.8 SCORING SYSTEMS FOR THE CRITERIA, 281 12.6 CHECKLISTS, 282 12.6.1 ENVIRONMENTAL EVALUATION SYSTEM, 283 12.6.2 SONDHEIM S ENVIRONMENTAL ASSESSMENT METHODOLOGY, 287 12.6.3 MONGKOL S METHODOLOGY, 289 12.7 CASE STUDY: USING THE SIMPLE ADDITIVE WEIGHTING MODEL TO CHOOSE THE BEST TRANSPORT STRATEGY FOR A MAJOR URBAN CENTRE, 292 12.7.1 ASSESSING THE IMPORTANCE WEIGHTINGS FOR THE DECISION CRITERIA, 293 12.7.2 ASSESSMENT OF EACH OPTION ON EACH OF THE SUBCRITERIA, 295 12.7.3 RESULTS OF THE MULTICRITERIA ASSESSMENT, 296 12.7.4 SENSITIVITY ANALYSIS, 297 12.8 SUMMARY, 298 REFERENCES, 298 13 ANALYTIC HIERARCHY PROCESS (AHP), 300 13.1 INTRODUCTION, 300 13.2 HIERARCHIES, 301 13.3 ESTABLISHING PRIORITIES WITHIN HIERARCHIES, 301 13.4 ESTABLISHING AND CALCULATING PRIORITIES, 303 13.4.1 DERIVING PRIORITIES USING AN APPROXIMATION METHOD, 304 13.4.2 DERIVING EXACT PRIORITIES USING THE ITERATIVE EIGENVECTOR METHOD, 306 13.4.3 EXAMPLE OF THE EXACT METHOD FOR DETERMINING PRIORITIES, 308 IMAGE 8 XII CONTENTS 13.5 RELATIONSHIP BETWEEN AHP AND THE SIMPLE ADDITIVE WEIGHTING (SAW) MODEL, 316 13.6 SUMMARY, 316 REFERENCES, 317 14 CONCORDANCE TECHNIQUES, 318 14.1 INTRODUCTION, 318 14.2 CONCORDANCE ANALYSIS, 319 14.3 PROMETHEEI AND II, 321 14.4 ELECTREI,328 14.4.1 OBTAINING A RANKING FROM THE CONCORDANCE AND DISCORDANCE INDICES, 330 14.5 OTHER CONCORDANCE MODELS, 331 14.5.1 INDIFFERENCE AND PREFERENCE THRESHOLDS, 331 14.5.2 ELECTRE III AND PROMETHEE (5TH FORM), 333 14.6 SUMMARY, 339 REFERENCES, 342 15 CONCLUDING COMMENTS, 343 15.1 INTRODUCTION, 343 15.2 WHICH PROJECT APPRAISAL TECHNIQUE SHOULD ONE USE? 343 15.3 FUTURE CHALLENGES, 344 REFERENCES, 345 INTEREST FACTOR TABLES, 346 INDEX, 368
any_adam_object 1
author Rogers, Martin
Duffy, Aidan
author_facet Rogers, Martin
Duffy, Aidan
author_role aut
aut
author_sort Rogers, Martin
author_variant m r mr
a d ad
building Verbundindex
bvnumber BV040368338
callnumber-first T - Technology
callnumber-label TA183
callnumber-raw TA183
callnumber-search TA183
callnumber-sort TA 3183
callnumber-subject TA - General and Civil Engineering
classification_rvk ZG 9230
ctrlnum (OCoLC)801784413
(DE-599)BVBBV040368338
dewey-full 658.4/04
dewey-hundreds 600 - Technology (Applied sciences)
dewey-ones 658 - General management
dewey-raw 658.4/04
dewey-search 658.4/04
dewey-sort 3658.4 14
dewey-tens 650 - Management and auxiliary services
discipline Technik
Wirtschaftswissenschaften
edition 2. ed.
format Book
fullrecord <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>02849nam a2200733zc 4500</leader><controlfield tag="001">BV040368338</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">20130123 </controlfield><controlfield tag="007">t|</controlfield><controlfield tag="008">120817s2012 xxk |||| 00||| eng d</controlfield><datafield tag="010" ind1=" " ind2=" "><subfield code="a">2012003455</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9780470672990</subfield><subfield code="c">pbk. : alk. paper</subfield><subfield code="9">978-0-470-67299-0</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)801784413</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV040368338</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">aacr</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="044" ind1=" " ind2=" "><subfield code="a">xxk</subfield><subfield code="c">GB</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-703</subfield></datafield><datafield tag="050" ind1=" " ind2="0"><subfield code="a">TA183</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">658.4/04</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">ZG 9230</subfield><subfield code="0">(DE-625)156052:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Rogers, Martin</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Engineering project appraisal</subfield><subfield code="c">Martin Rogers ; Aidan Duffy</subfield></datafield><datafield tag="250" ind1=" " ind2=" "><subfield code="a">2. ed.</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Oxford</subfield><subfield code="b">Wiley-Blackwell</subfield><subfield code="c">2012</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">XVIII, 378 S.</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Ingenieurwissenschaften</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Engineering</subfield><subfield code="x">Costs</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Engineering</subfield><subfield code="x">Management</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Kostenberechnung</subfield><subfield code="0">(DE-588)4219304-7</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Ingenieur</subfield><subfield code="0">(DE-588)4026955-3</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Kostenanalyse</subfield><subfield code="0">(DE-588)4032580-5</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Projektcontrolling</subfield><subfield code="0">(DE-588)4273818-0</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Projektmanagement</subfield><subfield code="0">(DE-588)4047441-0</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Management</subfield><subfield code="0">(DE-588)4037278-9</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Ingenieurwissenschaften</subfield><subfield code="0">(DE-588)4137304-2</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Projektbewertung</subfield><subfield code="0">(DE-588)4175874-2</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Projektauswahl</subfield><subfield code="0">(DE-588)4125458-2</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="689" ind1="0" ind2="0"><subfield code="a">Ingenieur</subfield><subfield code="0">(DE-588)4026955-3</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="1"><subfield code="a">Management</subfield><subfield code="0">(DE-588)4037278-9</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="2"><subfield code="a">Projektmanagement</subfield><subfield code="0">(DE-588)4047441-0</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="689" ind1="1" ind2="0"><subfield code="a">Ingenieurwissenschaften</subfield><subfield code="0">(DE-588)4137304-2</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="1" ind2="1"><subfield code="a">Projektmanagement</subfield><subfield code="0">(DE-588)4047441-0</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="1" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="689" ind1="2" ind2="0"><subfield code="a">Ingenieur</subfield><subfield code="0">(DE-588)4026955-3</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="2" ind2="1"><subfield code="a">Projektmanagement</subfield><subfield code="0">(DE-588)4047441-0</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="2" ind2="2"><subfield code="a">Projektcontrolling</subfield><subfield code="0">(DE-588)4273818-0</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="2" ind2="3"><subfield code="a">Projektauswahl</subfield><subfield code="0">(DE-588)4125458-2</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="2" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="689" ind1="3" ind2="0"><subfield code="a">Ingenieur</subfield><subfield code="0">(DE-588)4026955-3</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="3" ind2="1"><subfield code="a">Projektmanagement</subfield><subfield code="0">(DE-588)4047441-0</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="3" ind2="2"><subfield code="a">Kostenanalyse</subfield><subfield code="0">(DE-588)4032580-5</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="3" ind2="3"><subfield code="a">Kostenberechnung</subfield><subfield code="0">(DE-588)4219304-7</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="3" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="689" ind1="4" ind2="0"><subfield code="a">Projektbewertung</subfield><subfield code="0">(DE-588)4175874-2</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="4" ind2=" "><subfield code="8">1\p</subfield><subfield code="5">DE-604</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Duffy, Aidan</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="m">SWB Datenaustausch</subfield><subfield code="q">application/pdf</subfield><subfield code="u">http://bvbr.bib-bvb.de:8991/F?func=service&amp;doc_library=BVB01&amp;local_base=BVB01&amp;doc_number=025222003&amp;sequence=000001&amp;line_number=0001&amp;func_code=DB_RECORDS&amp;service_type=MEDIA</subfield><subfield code="3">Inhaltsverzeichnis</subfield></datafield><datafield tag="883" ind1="1" ind2=" "><subfield code="8">1\p</subfield><subfield code="a">cgwrk</subfield><subfield code="d">20201028</subfield><subfield code="q">DE-101</subfield><subfield code="u">https://d-nb.info/provenance/plan#cgwrk</subfield></datafield><datafield tag="943" ind1="1" ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-025222003</subfield></datafield></record></collection>
id DE-604.BV040368338
illustrated Not Illustrated
indexdate 2024-12-24T02:48:08Z
institution BVB
isbn 9780470672990
language English
lccn 2012003455
oai_aleph_id oai:aleph.bib-bvb.de:BVB01-025222003
oclc_num 801784413
open_access_boolean
owner DE-703
owner_facet DE-703
physical XVIII, 378 S.
publishDate 2012
publishDateSearch 2012
publishDateSort 2012
publisher Wiley-Blackwell
record_format marc
spellingShingle Rogers, Martin
Duffy, Aidan
Engineering project appraisal
Ingenieurwissenschaften
Engineering Costs
Engineering Management
Kostenberechnung (DE-588)4219304-7 gnd
Ingenieur (DE-588)4026955-3 gnd
Kostenanalyse (DE-588)4032580-5 gnd
Projektcontrolling (DE-588)4273818-0 gnd
Projektmanagement (DE-588)4047441-0 gnd
Management (DE-588)4037278-9 gnd
Ingenieurwissenschaften (DE-588)4137304-2 gnd
Projektbewertung (DE-588)4175874-2 gnd
Projektauswahl (DE-588)4125458-2 gnd
subject_GND (DE-588)4219304-7
(DE-588)4026955-3
(DE-588)4032580-5
(DE-588)4273818-0
(DE-588)4047441-0
(DE-588)4037278-9
(DE-588)4137304-2
(DE-588)4175874-2
(DE-588)4125458-2
title Engineering project appraisal
title_auth Engineering project appraisal
title_exact_search Engineering project appraisal
title_full Engineering project appraisal Martin Rogers ; Aidan Duffy
title_fullStr Engineering project appraisal Martin Rogers ; Aidan Duffy
title_full_unstemmed Engineering project appraisal Martin Rogers ; Aidan Duffy
title_short Engineering project appraisal
title_sort engineering project appraisal
topic Ingenieurwissenschaften
Engineering Costs
Engineering Management
Kostenberechnung (DE-588)4219304-7 gnd
Ingenieur (DE-588)4026955-3 gnd
Kostenanalyse (DE-588)4032580-5 gnd
Projektcontrolling (DE-588)4273818-0 gnd
Projektmanagement (DE-588)4047441-0 gnd
Management (DE-588)4037278-9 gnd
Ingenieurwissenschaften (DE-588)4137304-2 gnd
Projektbewertung (DE-588)4175874-2 gnd
Projektauswahl (DE-588)4125458-2 gnd
topic_facet Ingenieurwissenschaften
Engineering Costs
Engineering Management
Kostenberechnung
Ingenieur
Kostenanalyse
Projektcontrolling
Projektmanagement
Management
Projektbewertung
Projektauswahl
url http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=025222003&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA
work_keys_str_mv AT rogersmartin engineeringprojectappraisal
AT duffyaidan engineeringprojectappraisal