Manufacturing Systems Modeling and Analysis
Gespeichert in:
Format: | Elektronisch E-Book |
---|---|
Sprache: | English |
Veröffentlicht: |
Berlin
Springer Berlin
2009
|
Ausgabe: | 1. Ed. |
Schlagworte: | |
Online-Zugang: | BTU01 FHN01 FHR01 Volltext Inhaltsverzeichnis |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
MARC
LEADER | 00000nmm a2200000 c 4500 | ||
---|---|---|---|
001 | BV035240878 | ||
003 | DE-604 | ||
005 | 00000000000000.0 | ||
007 | cr|uuu---uuuuu | ||
008 | 090112s2009 gw |||| o||u| ||||||eng d | ||
015 | |a 08,N44,0865 |2 dnb | ||
016 | 7 | |a 990736199 |2 DE-101 | |
020 | |a 9783540887638 |c Online |9 978-3-540-88763-8 | ||
024 | 7 | |a 10.1007/978-3-540-88763-8 |2 doi | |
024 | 3 | |a 9783540887621 | |
028 | 5 | 2 | |a 12272693 |
035 | |a (OCoLC)1074882882 | ||
035 | |a (DE-599)DNB990736199 | ||
040 | |a DE-604 |b ger |e rakddb | ||
041 | 0 | |a eng | |
044 | |a gw |c XA-DE-BE | ||
049 | |a DE-898 |a DE-634 |a DE-92 |a DE-83 | ||
082 | 0 | |a 658.530151982 |2 22/ger | |
084 | |a QP 542 |0 (DE-625)141900: |2 rvk | ||
084 | |a 650 |2 sdnb | ||
245 | 1 | 0 | |a Manufacturing Systems Modeling and Analysis |c Guy L. Curry ; Richard M. Feldman |
250 | |a 1. Ed. | ||
264 | 1 | |a Berlin |b Springer Berlin |c 2009 | |
300 | |a 1 Online-Ressource (XVI, 328 S.) |b 100 schw.-w. Ill., 70 schw.-w. Tab. | ||
336 | |b txt |2 rdacontent | ||
337 | |b c |2 rdamedia | ||
338 | |b cr |2 rdacarrier | ||
650 | 0 | 7 | |a Warteschlangentheorie |0 (DE-588)4255044-0 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Fabrikplanung |0 (DE-588)4134388-8 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Fertigungssystem |0 (DE-588)4154150-9 |2 gnd |9 rswk-swf |
650 | 0 | 7 | |a Produktionsmodell |0 (DE-588)4126380-7 |2 gnd |9 rswk-swf |
689 | 0 | 0 | |a Fabrikplanung |0 (DE-588)4134388-8 |D s |
689 | 0 | 1 | |a Fertigungssystem |0 (DE-588)4154150-9 |D s |
689 | 0 | 2 | |a Warteschlangentheorie |0 (DE-588)4255044-0 |D s |
689 | 0 | 3 | |a Produktionsmodell |0 (DE-588)4126380-7 |D s |
689 | 0 | |5 DE-604 | |
700 | 1 | |a Curry, Guy L. |e Sonstige |4 oth | |
700 | 1 | |a Feldman, Richard M. |e Sonstige |4 oth | |
776 | 0 | 8 | |i Erscheint auch als |n Druck-Ausgabe, Hardcover |z 978-3-540-88762-1 |
856 | 4 | 0 | |u https://doi.org/10.1007/978-3-540-88763-8 |x Verlag |3 Volltext |
856 | 4 | 2 | |m DNB Datenaustausch |q application/pdf |u http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=017046672&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |3 Inhaltsverzeichnis |
912 | |a ZDB-2-ENG | ||
999 | |a oai:aleph.bib-bvb.de:BVB01-017046672 | ||
966 | e | |u https://doi.org/10.1007/978-3-540-88763-8 |l BTU01 |p ZDB-2-ENG |x Verlag |3 Volltext | |
966 | e | |u https://doi.org/10.1007/978-3-540-88763-8 |l FHN01 |p ZDB-2-ENG |x Verlag |3 Volltext | |
966 | e | |u https://doi.org/10.1007/978-3-540-88763-8 |l FHR01 |p ZDB-2-ENG |x Verlag |3 Volltext |
Datensatz im Suchindex
_version_ | 1804138513166237696 |
---|---|
adam_text | CONTENTS
BASIC PROBABILITY REVIEW
1
.1
BASIC DEFINITIONS 1
.2 RANDOM VARIABLES AND DISTRIBUTION FUNCTIONS 4
.3 MEAN AND VARIANCE 10
.4 IMPORTANT DISTRIBUTIONS 13
.5 MULTIVARIATE DISTRIBUTIONS 23
.6 COMBINATIONS OF RANDOM VARIABLES 31
1.6.1 FIXED SUM OF RANDOM VARIABLES 31
1.6.2 RANDOM SUM OF RANDOM VARIABLES 32
1.6.3 MIXTURES OF RANDOM VARIABLES 34
APPENDIX 35
PROBLEMS 36
REFERENCES 43
INTRODUCTION TO FACTORY MODELS
45
2.1 THE BASICS 45
2.1.1 NOTATION, DEFINITIONS AND DIAGRAMS 46
2.1.2 MEASURED DATA AND SYSTEM PARAMETERS 49
2.2 INTRODUCTION TO FACTORY PERFORMANCE 54
2.2.1 THE MODELING METHOD 55
2.2.2 MODEL USAGE 58
2.2.3 MODEL CONCLUSIONS 59
2.3 DETERMINISTIC VS STOCHASTIC MODELS 60
APPENDIX 62
PROBLEMS 65
REFERENCES 67
SINGLE WORKSTATION FACTORY MODELS
69
3.1 FIRSTMODEL 69
3.2 DIAGRAM METHOD FOR DEVELOPING THE BALANCE EQUATIONS 73
3.3 MODEL SHORTHAND NOTATION 76
BIBLIOGRAFISCHE INFORMATIONEN
HTTP://D-NB.INFO/990736199
DIGITALISIERT DURCH
X CONTENTS
3.4 AN INFINITE CAPACITY MODEL (M/M/L
) 77
3.5 MULTIPLE SERVER SYSTEMS WITH NON-IDENTICAL SERVICE RATES 81
3.6 USING EXPONENTIALS TO APPROXIMATE GENERAL TIMES 85
3.6.1 ERLANG PROCESSING TIMES 85
3.6.2 ERLANG INTER-ARRIVAL TIMES 87
3.6.3 PHASED INTER-ARRIVAL AND PROCESSING TIMES 89
3.7 SINGLE SERVER MODEL APPROXIMATIONS 90
3.7.1 GENERAL SERVICE DISTRIBUTIONS 91
3.7.2 APPROXIMATIONS FOR
G/G/X
SYSTEMS 93
3.7.3 APPROXIMATIONS FOR
G/G/C
SYSTEMS 95
APPENDIX 97
PROBLEMS 100
REFERENCES 107
4 PROCESSING TIME VARIABILITY
109
4.1 NATURAL PROCESSING TIME VARIABILITY 111
4.2 RANDOM BREAKDOWNS AND REPAIRS DURING PROCESSING 113
PROBLEMS 121
REFERENCES 123
5 MULTIPLE-STAGE SINGLE-PRODUCT FACTORY MODELS
125
5.1 APPROXIMATING THE DEPARTURE PROCESS FROM A WORKSTATION 125
5.2 SERIAI SYSTEMS DECOMPOSITION 128
5.3 NONSERIAL NETWORK MODELS 133
5.3.1 MERGING INFLOW STREAMS 133
5.3.2 RANDOM SPLITTING OF THE DEPARTURE STREAM 135
5.4 THE GENERAL NETWORK APPROXIMATION MODEL 138
5.4.1 COMPUTING WORKSTATION MEAN ARRIVAI RATES 139
5.4.2 COMPUTING SQUARED COEFFICIENTS OF VARIATION FOR ARRIVAIS .
. 141
APPENDIX 150
PROBLEMS 152
REFERENCES 157
6 MULTIPLE PRODUCT FACTORY MODELS
159
6.1 PRODUCT FLOW RATES 160
6.2 WORKSTATION WORKLOADS 162
6.3 SERVICE TIME CHARACTERISTICS 163
6.4 WORKSTATION PERFORMANCE MEASURES 164
6.5 PROCESSING STEP MODELING PARADIGM 167
6.5.1 SERVICE TIME CHARACTERISTICS 170
6.5.2 PERFORMANCE MEASURES 172
6.6 GROUP TECHNOLOGY AND CELLULAR MANUFACTURING 177
PROBLEMS 184
REFERENCES 196
CONTENTS XI
7 MODELS OF VARIOUS FORMS OF BATCHING
197
7.1 BATCH MOVES 198
7.1.1 BATCH FORMING TIME 199
7.1.2 BATCH QUEUE CYCLE TIME 201
7.1.3 BATCH MOVE PROCESSING TIME DELAYS 202
7.1.4 INTER-DEPARTURE TIME SCV WITH BATCH MOVE ARRIVAIS 204
7.2 BATCHING FOR SETUP REDUCTION 206
7.2.1 INTER-DEPARTURE TIME SCV WITH BATCH SETUPS 209
7.3 BATCH SERVICE MODEL 209
7.3.1 CYCLE TIME FOR BATCH SERVICE 210
7.3.2 DEPARTURE PROCESS FOR BATCH SERVICE 211
7.4 MODELING THE WORKSTATION FOLLOWING A BATCH SERVER 213
7.4.1 A SERIAI SYSTEM TOPOLOGY 213
7.4.2 BRANCHING FOLLOWING A BATCH SERVER 214
7.5 BATCH NETWORK EXAMPLES 222
7.5.1 BATCH NETWORK EXAMPLE 1 222
7.5.2 BATCH NETWORK EXAMPLE 2 226
PROBLEMS 230
REFERENCES 240
8
WIP
LIMITING CONTROL STRATEGIES
241
8.1 CLOSED QUEUEING NETWORKS FOR SINGLE PRODUCTS 242
8.1.1 ANALYSIS WITH EXPONENTIAL PROCESSING TIMES 245
8.1.2 ANALYSIS WITH GENERAL PROCESSING TIMES 252
8.2 CLOSED QUEUEING NETWORKS WITH MULTIPLE PRODUCTS 255
8.2.1 MEAN VALUE ANALYSIS FOR MULTIPLE PRODUCTS 256
8.2.2 MEAN VALUE ANALYSIS APPROXIMATION FOR MULTIPLE PRODUCTS. 260
8.2.3 GENERAL SERVICE TIME APPROXIMATION FOR MULTIPLE
PRODUCTS 262
8.3 PRODUCTION AND SEQUENCING STRATEGIES: A CASE STUDY 267
8.3.1 PROBLEM STATEMENT 268
8.3.2 PUSH STRATEGY MODEL 269
8.3.3
CONWIP
STRATEGY MODEL 271
APPENDIX 272
PROBLEMS 273
REFERENCES 279
9 SERIAI LIMITED BUFFER MODELS
281
9.1 THE DECOMPOSITION APPROACH USED FOR KANBAN SYSTEMS 282
9.2 MODELING THE TWO-NODE SUBSYSTEM 284
9.2.1 MODELING THE SERVICE DISTRIBUTION 285
9.2.2 STRUCTURE OF THE STATE-SPACE 288
9.2.3 GENERATOR MATRIX RELATING SYSTEM PROBABILITIES 290
9.2.4 CONNECTING THE SUBSYSTEMS 291
XII CONTENTS
9.3 EXAMPLE OF A KANBAN SERIAI SYSTEM 293
9.3.1 THE FIRST FORWARD PASS 294
9.3.2 THE BACKWARD PASS 300
9.3.3 THE REMAINING ITERATIONS 307
9.3.4 CONVERGENCE AND FACTORY PERFORMANCE MEASURES 308
9.3.5 GENERALIZATIONS 310
9.4 SETTING KANBAN LIMITS 310
9.4.1 ALLOCATING A FIXED NUMBER OF BUFFER UNITS 311
9.4.2 CYCLE TIME RESTRICTION 315
9.4.3 SERIAI FACTORY RESULTS 316
PROBLEMS 317
REFERENCES 320
GLOSSARY
321
INDEX
325
|
any_adam_object | 1 |
building | Verbundindex |
bvnumber | BV035240878 |
classification_rvk | QP 542 |
collection | ZDB-2-ENG |
ctrlnum | (OCoLC)1074882882 (DE-599)DNB990736199 |
dewey-full | 658.530151982 |
dewey-hundreds | 600 - Technology (Applied sciences) |
dewey-ones | 658 - General management |
dewey-raw | 658.530151982 |
dewey-search | 658.530151982 |
dewey-sort | 3658.530151982 |
dewey-tens | 650 - Management and auxiliary services |
discipline | Wirtschaftswissenschaften |
doi_str_mv | 10.1007/978-3-540-88763-8 |
edition | 1. Ed. |
format | Electronic eBook |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>02430nmm a2200577 c 4500</leader><controlfield tag="001">BV035240878</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">00000000000000.0</controlfield><controlfield tag="007">cr|uuu---uuuuu</controlfield><controlfield tag="008">090112s2009 gw |||| o||u| ||||||eng d</controlfield><datafield tag="015" ind1=" " ind2=" "><subfield code="a">08,N44,0865</subfield><subfield code="2">dnb</subfield></datafield><datafield tag="016" ind1="7" ind2=" "><subfield code="a">990736199</subfield><subfield code="2">DE-101</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9783540887638</subfield><subfield code="c">Online</subfield><subfield code="9">978-3-540-88763-8</subfield></datafield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.1007/978-3-540-88763-8</subfield><subfield code="2">doi</subfield></datafield><datafield tag="024" ind1="3" ind2=" "><subfield code="a">9783540887621</subfield></datafield><datafield tag="028" ind1="5" ind2="2"><subfield code="a">12272693</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)1074882882</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)DNB990736199</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rakddb</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="044" ind1=" " ind2=" "><subfield code="a">gw</subfield><subfield code="c">XA-DE-BE</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-898</subfield><subfield code="a">DE-634</subfield><subfield code="a">DE-92</subfield><subfield code="a">DE-83</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">658.530151982</subfield><subfield code="2">22/ger</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">QP 542</subfield><subfield code="0">(DE-625)141900:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">650</subfield><subfield code="2">sdnb</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Manufacturing Systems Modeling and Analysis</subfield><subfield code="c">Guy L. Curry ; Richard M. Feldman</subfield></datafield><datafield tag="250" ind1=" " ind2=" "><subfield code="a">1. Ed.</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Berlin</subfield><subfield code="b">Springer Berlin</subfield><subfield code="c">2009</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">1 Online-Ressource (XVI, 328 S.)</subfield><subfield code="b">100 schw.-w. Ill., 70 schw.-w. Tab.</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Warteschlangentheorie</subfield><subfield code="0">(DE-588)4255044-0</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Fabrikplanung</subfield><subfield code="0">(DE-588)4134388-8</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Fertigungssystem</subfield><subfield code="0">(DE-588)4154150-9</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Produktionsmodell</subfield><subfield code="0">(DE-588)4126380-7</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="689" ind1="0" ind2="0"><subfield code="a">Fabrikplanung</subfield><subfield code="0">(DE-588)4134388-8</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="1"><subfield code="a">Fertigungssystem</subfield><subfield code="0">(DE-588)4154150-9</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="2"><subfield code="a">Warteschlangentheorie</subfield><subfield code="0">(DE-588)4255044-0</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2="3"><subfield code="a">Produktionsmodell</subfield><subfield code="0">(DE-588)4126380-7</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Curry, Guy L.</subfield><subfield code="e">Sonstige</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Feldman, Richard M.</subfield><subfield code="e">Sonstige</subfield><subfield code="4">oth</subfield></datafield><datafield tag="776" ind1="0" ind2="8"><subfield code="i">Erscheint auch als</subfield><subfield code="n">Druck-Ausgabe, Hardcover</subfield><subfield code="z">978-3-540-88762-1</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.1007/978-3-540-88763-8</subfield><subfield code="x">Verlag</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="m">DNB Datenaustausch</subfield><subfield code="q">application/pdf</subfield><subfield code="u">http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=017046672&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA</subfield><subfield code="3">Inhaltsverzeichnis</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">ZDB-2-ENG</subfield></datafield><datafield tag="999" ind1=" " ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-017046672</subfield></datafield><datafield tag="966" ind1="e" ind2=" "><subfield code="u">https://doi.org/10.1007/978-3-540-88763-8</subfield><subfield code="l">BTU01</subfield><subfield code="p">ZDB-2-ENG</subfield><subfield code="x">Verlag</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="966" ind1="e" ind2=" "><subfield code="u">https://doi.org/10.1007/978-3-540-88763-8</subfield><subfield code="l">FHN01</subfield><subfield code="p">ZDB-2-ENG</subfield><subfield code="x">Verlag</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="966" ind1="e" ind2=" "><subfield code="u">https://doi.org/10.1007/978-3-540-88763-8</subfield><subfield code="l">FHR01</subfield><subfield code="p">ZDB-2-ENG</subfield><subfield code="x">Verlag</subfield><subfield code="3">Volltext</subfield></datafield></record></collection> |
id | DE-604.BV035240878 |
illustrated | Illustrated |
indexdate | 2024-07-09T21:29:23Z |
institution | BVB |
isbn | 9783540887638 |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-017046672 |
oclc_num | 1074882882 |
open_access_boolean | |
owner | DE-898 DE-BY-UBR DE-634 DE-92 DE-83 |
owner_facet | DE-898 DE-BY-UBR DE-634 DE-92 DE-83 |
physical | 1 Online-Ressource (XVI, 328 S.) 100 schw.-w. Ill., 70 schw.-w. Tab. |
psigel | ZDB-2-ENG |
publishDate | 2009 |
publishDateSearch | 2009 |
publishDateSort | 2009 |
publisher | Springer Berlin |
record_format | marc |
spelling | Manufacturing Systems Modeling and Analysis Guy L. Curry ; Richard M. Feldman 1. Ed. Berlin Springer Berlin 2009 1 Online-Ressource (XVI, 328 S.) 100 schw.-w. Ill., 70 schw.-w. Tab. txt rdacontent c rdamedia cr rdacarrier Warteschlangentheorie (DE-588)4255044-0 gnd rswk-swf Fabrikplanung (DE-588)4134388-8 gnd rswk-swf Fertigungssystem (DE-588)4154150-9 gnd rswk-swf Produktionsmodell (DE-588)4126380-7 gnd rswk-swf Fabrikplanung (DE-588)4134388-8 s Fertigungssystem (DE-588)4154150-9 s Warteschlangentheorie (DE-588)4255044-0 s Produktionsmodell (DE-588)4126380-7 s DE-604 Curry, Guy L. Sonstige oth Feldman, Richard M. Sonstige oth Erscheint auch als Druck-Ausgabe, Hardcover 978-3-540-88762-1 https://doi.org/10.1007/978-3-540-88763-8 Verlag Volltext DNB Datenaustausch application/pdf http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=017046672&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA Inhaltsverzeichnis |
spellingShingle | Manufacturing Systems Modeling and Analysis Warteschlangentheorie (DE-588)4255044-0 gnd Fabrikplanung (DE-588)4134388-8 gnd Fertigungssystem (DE-588)4154150-9 gnd Produktionsmodell (DE-588)4126380-7 gnd |
subject_GND | (DE-588)4255044-0 (DE-588)4134388-8 (DE-588)4154150-9 (DE-588)4126380-7 |
title | Manufacturing Systems Modeling and Analysis |
title_auth | Manufacturing Systems Modeling and Analysis |
title_exact_search | Manufacturing Systems Modeling and Analysis |
title_full | Manufacturing Systems Modeling and Analysis Guy L. Curry ; Richard M. Feldman |
title_fullStr | Manufacturing Systems Modeling and Analysis Guy L. Curry ; Richard M. Feldman |
title_full_unstemmed | Manufacturing Systems Modeling and Analysis Guy L. Curry ; Richard M. Feldman |
title_short | Manufacturing Systems Modeling and Analysis |
title_sort | manufacturing systems modeling and analysis |
topic | Warteschlangentheorie (DE-588)4255044-0 gnd Fabrikplanung (DE-588)4134388-8 gnd Fertigungssystem (DE-588)4154150-9 gnd Produktionsmodell (DE-588)4126380-7 gnd |
topic_facet | Warteschlangentheorie Fabrikplanung Fertigungssystem Produktionsmodell |
url | https://doi.org/10.1007/978-3-540-88763-8 http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=017046672&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA |
work_keys_str_mv | AT curryguyl manufacturingsystemsmodelingandanalysis AT feldmanrichardm manufacturingsystemsmodelingandanalysis |