Gaining control capacity management and scheduling

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Correll, James G. (VerfasserIn), Edson, Norris W. (VerfasserIn)
Format: Buch
Sprache:English
Veröffentlicht: New York, NY [u.a.] Wiley 1999
Ausgabe:2. ed.
Schriftenreihe:Oliver Wight manufacturing series
Schlagworte:
Online-Zugang:Inhaltsverzeichnis
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!

MARC

LEADER 00000nam a2200000 c 4500
001 BV014009978
003 DE-604
005 20011116
007 t|
008 011116s1999 xx d||| |||| 00||| eng d
020 |a 0471291676  |9 0-471-29167-6 
035 |a (OCoLC)39360803 
035 |a (DE-599)BVBBV014009978 
040 |a DE-604  |b ger  |e rakwb 
041 0 |a eng 
049 |a DE-N2  |a DE-634  |a DE-83 
050 0 |a TS157.5 
082 0 |a 658.5/3  |2 21 
084 |a QP 542  |0 (DE-625)141900:  |2 rvk 
100 1 |a Correll, James G.  |e Verfasser  |4 aut 
245 1 0 |a Gaining control  |b capacity management and scheduling  |c James G. Correll ; Norris W. Edson 
250 |a 2. ed. 
264 1 |a New York, NY [u.a.]  |b Wiley  |c 1999 
300 |a XIV, 270 S.  |b graph. Darst. 
336 |b txt  |2 rdacontent 
337 |b n  |2 rdamedia 
338 |b nc  |2 rdacarrier 
490 0 |a Oliver Wight manufacturing series 
650 4 |a Industrial capacity  |x Management 
650 4 |a Just-in-time systems 
650 4 |a Manufacturing resource planning 
650 4 |a Production scheduling 
650 0 7 |a Fertigungsplanung  |0 (DE-588)4113545-3  |2 gnd  |9 rswk-swf 
689 0 0 |a Fertigungsplanung  |0 (DE-588)4113545-3  |D s 
689 0 |5 DE-604 
700 1 |a Edson, Norris W.  |e Verfasser  |4 aut 
856 4 2 |m HBZ Datenaustausch  |q application/pdf  |u http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=009592010&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA  |3 Inhaltsverzeichnis 
943 1 |a oai:aleph.bib-bvb.de:BVB01-009592010 

Datensatz im Suchindex

_version_ 1819786378771169280
adam_text Contents Acknowledgments vii Introduction ix Cast of Characters xiii Chapter One Out of Control 1 Chapter Two Constructing Routings and Work Centers 13 Chapter Three Mastering Dispatching and Scheduling 41 Chapter Four Understanding Capacity Planning 91 Chapter Five Controlling the Flow of Work 139 Chapter Six Scheduling to Capacity Constraints 163 Chapter Seven Applying Rough Cut Capacity Planning 189 Chapter Eight Joining Forces 213 vi Contents Chapter Nine Continuous Improvement 223 Chapter Ten Moving Ahead 249 Notes 263 Index 265
any_adam_object 1
author Correll, James G.
Edson, Norris W.
author_facet Correll, James G.
Edson, Norris W.
author_role aut
aut
author_sort Correll, James G.
author_variant j g c jg jgc
n w e nw nwe
building Verbundindex
bvnumber BV014009978
callnumber-first T - Technology
callnumber-label TS157
callnumber-raw TS157.5
callnumber-search TS157.5
callnumber-sort TS 3157.5
callnumber-subject TS - Manufactures
classification_rvk QP 542
ctrlnum (OCoLC)39360803
(DE-599)BVBBV014009978
dewey-full 658.5/3
dewey-hundreds 600 - Technology (Applied sciences)
dewey-ones 658 - General management
dewey-raw 658.5/3
dewey-search 658.5/3
dewey-sort 3658.5 13
dewey-tens 650 - Management and auxiliary services
discipline Wirtschaftswissenschaften
edition 2. ed.
format Book
fullrecord <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01543nam a2200421 c 4500</leader><controlfield tag="001">BV014009978</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">20011116 </controlfield><controlfield tag="007">t|</controlfield><controlfield tag="008">011116s1999 xx d||| |||| 00||| eng d</controlfield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">0471291676</subfield><subfield code="9">0-471-29167-6</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)39360803</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV014009978</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-N2</subfield><subfield code="a">DE-634</subfield><subfield code="a">DE-83</subfield></datafield><datafield tag="050" ind1=" " ind2="0"><subfield code="a">TS157.5</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">658.5/3</subfield><subfield code="2">21</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">QP 542</subfield><subfield code="0">(DE-625)141900:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Correll, James G.</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Gaining control</subfield><subfield code="b">capacity management and scheduling</subfield><subfield code="c">James G. Correll ; Norris W. Edson</subfield></datafield><datafield tag="250" ind1=" " ind2=" "><subfield code="a">2. ed.</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">New York, NY [u.a.]</subfield><subfield code="b">Wiley</subfield><subfield code="c">1999</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">XIV, 270 S.</subfield><subfield code="b">graph. Darst.</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="490" ind1="0" ind2=" "><subfield code="a">Oliver Wight manufacturing series</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Industrial capacity</subfield><subfield code="x">Management</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Just-in-time systems</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Manufacturing resource planning</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Production scheduling</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Fertigungsplanung</subfield><subfield code="0">(DE-588)4113545-3</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="689" ind1="0" ind2="0"><subfield code="a">Fertigungsplanung</subfield><subfield code="0">(DE-588)4113545-3</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Edson, Norris W.</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="m">HBZ Datenaustausch</subfield><subfield code="q">application/pdf</subfield><subfield code="u">http://bvbr.bib-bvb.de:8991/F?func=service&amp;doc_library=BVB01&amp;local_base=BVB01&amp;doc_number=009592010&amp;sequence=000002&amp;line_number=0001&amp;func_code=DB_RECORDS&amp;service_type=MEDIA</subfield><subfield code="3">Inhaltsverzeichnis</subfield></datafield><datafield tag="943" ind1="1" ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-009592010</subfield></datafield></record></collection>
id DE-604.BV014009978
illustrated Illustrated
indexdate 2024-12-23T15:45:52Z
institution BVB
isbn 0471291676
language English
oai_aleph_id oai:aleph.bib-bvb.de:BVB01-009592010
oclc_num 39360803
open_access_boolean
owner DE-N2
DE-634
DE-83
owner_facet DE-N2
DE-634
DE-83
physical XIV, 270 S. graph. Darst.
publishDate 1999
publishDateSearch 1999
publishDateSort 1999
publisher Wiley
record_format marc
series2 Oliver Wight manufacturing series
spellingShingle Correll, James G.
Edson, Norris W.
Gaining control capacity management and scheduling
Industrial capacity Management
Just-in-time systems
Manufacturing resource planning
Production scheduling
Fertigungsplanung (DE-588)4113545-3 gnd
subject_GND (DE-588)4113545-3
title Gaining control capacity management and scheduling
title_auth Gaining control capacity management and scheduling
title_exact_search Gaining control capacity management and scheduling
title_full Gaining control capacity management and scheduling James G. Correll ; Norris W. Edson
title_fullStr Gaining control capacity management and scheduling James G. Correll ; Norris W. Edson
title_full_unstemmed Gaining control capacity management and scheduling James G. Correll ; Norris W. Edson
title_short Gaining control
title_sort gaining control capacity management and scheduling
title_sub capacity management and scheduling
topic Industrial capacity Management
Just-in-time systems
Manufacturing resource planning
Production scheduling
Fertigungsplanung (DE-588)4113545-3 gnd
topic_facet Industrial capacity Management
Just-in-time systems
Manufacturing resource planning
Production scheduling
Fertigungsplanung
url http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=009592010&sequence=000002&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA
work_keys_str_mv AT correlljamesg gainingcontrolcapacitymanagementandscheduling
AT edsonnorrisw gainingcontrolcapacitymanagementandscheduling