Avoiding slush for hot-point drilling of glacier boreholes

Water-filled boreholes in cold ice refreeze in hours to days, and prior attempts to keep them open with antifreeze resulted in a plug of slush effectively freezing the hole even faster. Thus, antifreeze as a method to stabilize hot-water boreholes has largely been abandoned. In the hot-point drillin...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Annals of glaciology 2021-04, Vol.62 (84), p.166-170, Article 0260305520000701
Hauptverfasser: Hills, Benjamin H., Winebrenner, Dale P., Elam, W. T., Kintner, Paul M. S.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Water-filled boreholes in cold ice refreeze in hours to days, and prior attempts to keep them open with antifreeze resulted in a plug of slush effectively freezing the hole even faster. Thus, antifreeze as a method to stabilize hot-water boreholes has largely been abandoned. In the hot-point drilling case, no external water is added to the hole during drilling, so earlier antifreeze injection is possible while the drill continues melting downward. Here, we use a cylindrical Stefan model to explore slush formation within the parameter space representative of hot-point drilling. We find that earlier injection timing creates an opportunity to avoid slush entirely by injecting sufficient antifreeze to dissolve the hole past the drilled radius. As in the case of hot-water drilling, the alternative is to force mixing in the hole after antifreeze injection to ensure that ice refreezes onto the borehole wall instead of within the solution as slush.
ISSN:0260-3055
1727-5644
DOI:10.1017/aog.2020.70