Treatment design of geological defects in dam foundation of Jinping I hydropower station
Jinping I hydropower station is one of the most challenging projects in China due to its highest arch dam and complex geological conditions for construction. After geological investigation into the dam foundation, a few large-scale weak discontinuities are observed. The rock masses in the left dam f...
Gespeichert in:
Veröffentlicht in: | Journal of Rock Mechanics and Geotechnical Engineering 2013-10, Vol.5 (5), p.342-349 |
---|---|
Hauptverfasser: | , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!