FAULT CAUSED BY WATER PRESSURE IN THE HEAD-COVER CHAMBER

Owing to the high temperature of the thrust beating pads, the No.l unit wasn't performed in the upgrading test at Liujiaxia Hydropower Plant. Through the experimental and theoretical analysis, it has been confirmed that the fault unit was caused by the high water pressure in the head-cover chamber....

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of hydrodynamics. Series B 2006, Vol.18 (3), p.280-286
Hauptverfasser: PEI, Hai-lin, QI, Xue-yi, LI, Hui, LI, Jian-hui, PEI, Ze-yu
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!