Methods and systems for completing multi-zone openhole formations
Methods and systems for completing multi-zone formations. The method can include placing a gravel pack assembly within a borehole. The gravel pack assembly can include a first sand control extension. A first sand control screen can be disposed adjacent the first sand control extension. The first san...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!