Increase the efficiency of the boiler using bagasse dryer in sugar plant unit
Nowadays the major global problem in sustainable development was restricted by call and crisis of energy. The overview over the entire plant design of a sugar plant has been analyzed that the time taken for firing the bagasse inside the boiler was too long. To reduce this bagasse dryer was designed...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Tagungsbericht |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!