Mental workload analysis in PPIC division using NASA-TLX method at PT ABC

PT. ABC applies an international standard production quality management system, so it is no wonder the products they produce are of high quality. The division has responsibility for the production process at PT. ABC is PPIC (Production Planning and Inventory Control), because PPIC is a division that...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Prabaswari, Atyanti Dyah, Danianto, Fahri, Utomo, Bagus Wahyu
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue 1
container_start_page
container_title
container_volume 2693
creator Prabaswari, Atyanti Dyah
Danianto, Fahri
Utomo, Bagus Wahyu
description PT. ABC applies an international standard production quality management system, so it is no wonder the products they produce are of high quality. The division has responsibility for the production process at PT. ABC is PPIC (Production Planning and Inventory Control), because PPIC is a division that procures equipment and raw materials in the production process. PPIC can be defined as a process for planning and controlling the flow of material into, flowing, and out of the production/operation system so that market demand can be met with the right amount, right delivery time, and minimum production costs. Based on the job description of the PPIC division and the data obtained through the questionnaire, using the mental workload method of workers in the PPC section is 82.3%, and the MRPP share is 84%. Workers experience a high mental workload due to multiple tasks, the pressure to complete tasks, and much effort to complete the task. This study aims to analyze the mental workload of workers in the PPIC Division, amounting to 42 people using NASA-TLX, and to analyze the age factors, gender, and jobdesc affect mental workload using regression test. This study showed that the average level of the mental workload of workers was high with the highest indicator Effort (EF).
doi_str_mv 10.1063/5.0119378
format Conference Proceeding
fullrecord <record><control><sourceid>proquest_scita</sourceid><recordid>TN_cdi_scitation_primary_10_1063_5_0119378</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2886440545</sourcerecordid><originalsourceid>FETCH-LOGICAL-p966-e7a63678161ba090e666e435281b3a346a4c91d7a349ab3570c1cb96b1eaf53e3</originalsourceid><addsrcrecordid>eNotkF1LwzAYhYMoOKcX_oOAd0Jn3iZ501zW4kdh6sBe7C6kbaaZXTubTtm_t7JdnXPxcHg4hFwDmwFDfidnDEBzlZyQCUgJkULAUzJhTIsoFnx5Ti5CWDMWa6WSCclfXDvYhv52_VfT2Zra1jb74AP1LV0s8ozW_scH37V0F3z7QV_T9zQq5ku6ccNnN_IDXRQ0vc8uydnKNsFdHXNKiseHInuO5m9PeZbOo61GjJyyyFElgFBapplDRCe4jBMoueUCrag01Gqs2pZcKlZBVWoswdmV5I5Pyc1hdtt33zsXBrPudv0oHUycJCgEk0KO1O2BCpUf7DDqm23vN7bfG2Dm_ykjzfEp_gf3aFeQ</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>conference_proceeding</recordtype><pqid>2886440545</pqid></control><display><type>conference_proceeding</type><title>Mental workload analysis in PPIC division using NASA-TLX method at PT ABC</title><source>AIP Journals Complete</source><creator>Prabaswari, Atyanti Dyah ; Danianto, Fahri ; Utomo, Bagus Wahyu</creator><contributor>Dewi, Fitriyana ; Rachmawaty, Dina ; Rembulan, Glisina Dwinoor ; Caesaron, Dino ; Dellarosawati, Maria ; Salma, Sheila Amalia ; Winati, Famila Dwi ; Saragih, Nova Indah ; Bernanda, Devi Yurisca ; Wilujeng, Fuji Rahayu</contributor><creatorcontrib>Prabaswari, Atyanti Dyah ; Danianto, Fahri ; Utomo, Bagus Wahyu ; Dewi, Fitriyana ; Rachmawaty, Dina ; Rembulan, Glisina Dwinoor ; Caesaron, Dino ; Dellarosawati, Maria ; Salma, Sheila Amalia ; Winati, Famila Dwi ; Saragih, Nova Indah ; Bernanda, Devi Yurisca ; Wilujeng, Fuji Rahayu</creatorcontrib><description>PT. ABC applies an international standard production quality management system, so it is no wonder the products they produce are of high quality. The division has responsibility for the production process at PT. ABC is PPIC (Production Planning and Inventory Control), because PPIC is a division that procures equipment and raw materials in the production process. PPIC can be defined as a process for planning and controlling the flow of material into, flowing, and out of the production/operation system so that market demand can be met with the right amount, right delivery time, and minimum production costs. Based on the job description of the PPIC division and the data obtained through the questionnaire, using the mental workload method of workers in the PPC section is 82.3%, and the MRPP share is 84%. Workers experience a high mental workload due to multiple tasks, the pressure to complete tasks, and much effort to complete the task. This study aims to analyze the mental workload of workers in the PPIC Division, amounting to 42 people using NASA-TLX, and to analyze the age factors, gender, and jobdesc affect mental workload using regression test. This study showed that the average level of the mental workload of workers was high with the highest indicator Effort (EF).</description><identifier>ISSN: 0094-243X</identifier><identifier>EISSN: 1551-7616</identifier><identifier>DOI: 10.1063/5.0119378</identifier><identifier>CODEN: APCPCS</identifier><language>eng</language><publisher>Melville: American Institute of Physics</publisher><subject>Age factors ; Control equipment ; Inventory control ; Production costs ; Production planning ; Quality management ; Raw materials ; Workload ; Workloads</subject><ispartof>AIP Conference Proceedings, 2023, Vol.2693 (1)</ispartof><rights>Author(s)</rights><rights>2023 Author(s). Published by AIP Publishing.</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://pubs.aip.org/acp/article-lookup/doi/10.1063/5.0119378$$EHTML$$P50$$Gscitation$$H</linktohtml><link.rule.ids>310,311,315,782,786,791,792,796,4514,23937,23938,25147,27931,27932,76392</link.rule.ids></links><search><contributor>Dewi, Fitriyana</contributor><contributor>Rachmawaty, Dina</contributor><contributor>Rembulan, Glisina Dwinoor</contributor><contributor>Caesaron, Dino</contributor><contributor>Dellarosawati, Maria</contributor><contributor>Salma, Sheila Amalia</contributor><contributor>Winati, Famila Dwi</contributor><contributor>Saragih, Nova Indah</contributor><contributor>Bernanda, Devi Yurisca</contributor><contributor>Wilujeng, Fuji Rahayu</contributor><creatorcontrib>Prabaswari, Atyanti Dyah</creatorcontrib><creatorcontrib>Danianto, Fahri</creatorcontrib><creatorcontrib>Utomo, Bagus Wahyu</creatorcontrib><title>Mental workload analysis in PPIC division using NASA-TLX method at PT ABC</title><title>AIP Conference Proceedings</title><description>PT. ABC applies an international standard production quality management system, so it is no wonder the products they produce are of high quality. The division has responsibility for the production process at PT. ABC is PPIC (Production Planning and Inventory Control), because PPIC is a division that procures equipment and raw materials in the production process. PPIC can be defined as a process for planning and controlling the flow of material into, flowing, and out of the production/operation system so that market demand can be met with the right amount, right delivery time, and minimum production costs. Based on the job description of the PPIC division and the data obtained through the questionnaire, using the mental workload method of workers in the PPC section is 82.3%, and the MRPP share is 84%. Workers experience a high mental workload due to multiple tasks, the pressure to complete tasks, and much effort to complete the task. This study aims to analyze the mental workload of workers in the PPIC Division, amounting to 42 people using NASA-TLX, and to analyze the age factors, gender, and jobdesc affect mental workload using regression test. This study showed that the average level of the mental workload of workers was high with the highest indicator Effort (EF).</description><subject>Age factors</subject><subject>Control equipment</subject><subject>Inventory control</subject><subject>Production costs</subject><subject>Production planning</subject><subject>Quality management</subject><subject>Raw materials</subject><subject>Workload</subject><subject>Workloads</subject><issn>0094-243X</issn><issn>1551-7616</issn><fulltext>true</fulltext><rsrctype>conference_proceeding</rsrctype><creationdate>2023</creationdate><recordtype>conference_proceeding</recordtype><recordid>eNotkF1LwzAYhYMoOKcX_oOAd0Jn3iZ501zW4kdh6sBe7C6kbaaZXTubTtm_t7JdnXPxcHg4hFwDmwFDfidnDEBzlZyQCUgJkULAUzJhTIsoFnx5Ti5CWDMWa6WSCclfXDvYhv52_VfT2Zra1jb74AP1LV0s8ozW_scH37V0F3z7QV_T9zQq5ku6ccNnN_IDXRQ0vc8uydnKNsFdHXNKiseHInuO5m9PeZbOo61GjJyyyFElgFBapplDRCe4jBMoueUCrag01Gqs2pZcKlZBVWoswdmV5I5Pyc1hdtt33zsXBrPudv0oHUycJCgEk0KO1O2BCpUf7DDqm23vN7bfG2Dm_ykjzfEp_gf3aFeQ</recordid><startdate>20231106</startdate><enddate>20231106</enddate><creator>Prabaswari, Atyanti Dyah</creator><creator>Danianto, Fahri</creator><creator>Utomo, Bagus Wahyu</creator><general>American Institute of Physics</general><scope>8FD</scope><scope>H8D</scope><scope>L7M</scope></search><sort><creationdate>20231106</creationdate><title>Mental workload analysis in PPIC division using NASA-TLX method at PT ABC</title><author>Prabaswari, Atyanti Dyah ; Danianto, Fahri ; Utomo, Bagus Wahyu</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-p966-e7a63678161ba090e666e435281b3a346a4c91d7a349ab3570c1cb96b1eaf53e3</frbrgroupid><rsrctype>conference_proceedings</rsrctype><prefilter>conference_proceedings</prefilter><language>eng</language><creationdate>2023</creationdate><topic>Age factors</topic><topic>Control equipment</topic><topic>Inventory control</topic><topic>Production costs</topic><topic>Production planning</topic><topic>Quality management</topic><topic>Raw materials</topic><topic>Workload</topic><topic>Workloads</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Prabaswari, Atyanti Dyah</creatorcontrib><creatorcontrib>Danianto, Fahri</creatorcontrib><creatorcontrib>Utomo, Bagus Wahyu</creatorcontrib><collection>Technology Research Database</collection><collection>Aerospace Database</collection><collection>Advanced Technologies Database with Aerospace</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Prabaswari, Atyanti Dyah</au><au>Danianto, Fahri</au><au>Utomo, Bagus Wahyu</au><au>Dewi, Fitriyana</au><au>Rachmawaty, Dina</au><au>Rembulan, Glisina Dwinoor</au><au>Caesaron, Dino</au><au>Dellarosawati, Maria</au><au>Salma, Sheila Amalia</au><au>Winati, Famila Dwi</au><au>Saragih, Nova Indah</au><au>Bernanda, Devi Yurisca</au><au>Wilujeng, Fuji Rahayu</au><format>book</format><genre>proceeding</genre><ristype>CONF</ristype><atitle>Mental workload analysis in PPIC division using NASA-TLX method at PT ABC</atitle><btitle>AIP Conference Proceedings</btitle><date>2023-11-06</date><risdate>2023</risdate><volume>2693</volume><issue>1</issue><issn>0094-243X</issn><eissn>1551-7616</eissn><coden>APCPCS</coden><abstract>PT. ABC applies an international standard production quality management system, so it is no wonder the products they produce are of high quality. The division has responsibility for the production process at PT. ABC is PPIC (Production Planning and Inventory Control), because PPIC is a division that procures equipment and raw materials in the production process. PPIC can be defined as a process for planning and controlling the flow of material into, flowing, and out of the production/operation system so that market demand can be met with the right amount, right delivery time, and minimum production costs. Based on the job description of the PPIC division and the data obtained through the questionnaire, using the mental workload method of workers in the PPC section is 82.3%, and the MRPP share is 84%. Workers experience a high mental workload due to multiple tasks, the pressure to complete tasks, and much effort to complete the task. This study aims to analyze the mental workload of workers in the PPIC Division, amounting to 42 people using NASA-TLX, and to analyze the age factors, gender, and jobdesc affect mental workload using regression test. This study showed that the average level of the mental workload of workers was high with the highest indicator Effort (EF).</abstract><cop>Melville</cop><pub>American Institute of Physics</pub><doi>10.1063/5.0119378</doi><tpages>9</tpages></addata></record>
fulltext fulltext
identifier ISSN: 0094-243X
ispartof AIP Conference Proceedings, 2023, Vol.2693 (1)
issn 0094-243X
1551-7616
language eng
recordid cdi_scitation_primary_10_1063_5_0119378
source AIP Journals Complete
subjects Age factors
Control equipment
Inventory control
Production costs
Production planning
Quality management
Raw materials
Workload
Workloads
title Mental workload analysis in PPIC division using NASA-TLX method at PT ABC
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-06T04%3A06%3A43IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_scita&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=proceeding&rft.atitle=Mental%20workload%20analysis%20in%20PPIC%20division%20using%20NASA-TLX%20method%20at%20PT%20ABC&rft.btitle=AIP%20Conference%20Proceedings&rft.au=Prabaswari,%20Atyanti%20Dyah&rft.date=2023-11-06&rft.volume=2693&rft.issue=1&rft.issn=0094-243X&rft.eissn=1551-7616&rft.coden=APCPCS&rft_id=info:doi/10.1063/5.0119378&rft_dat=%3Cproquest_scita%3E2886440545%3C/proquest_scita%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2886440545&rft_id=info:pmid/&rfr_iscdi=true