Analysis of project planning using revised Warshall’s algorithm
A Myraid of details must be considered in planning how to coordinate all these activities in developing a realistic schedule and then in monitoring the progress of the project. The overview begins with the description of each graphical scheduling technique Gantt chart or Bar chart. It continues with...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Tagungsbericht |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | 1 |
container_start_page | |
container_title | |
container_volume | 2112 |
creator | Karthy, T. Ramya, S. |
description | A Myraid of details must be considered in planning how to coordinate all these activities in developing a realistic schedule and then in monitoring the progress of the project. The overview begins with the description of each graphical scheduling technique Gantt chart or Bar chart. It continues with example of contributors to scheduling and control that include: CPM, Metra potential method, Revised Warshall’s algorithm. |
doi_str_mv | 10.1063/1.5112214 |
format | Conference Proceeding |
fullrecord | <record><control><sourceid>proquest_scita</sourceid><recordid>TN_cdi_scitation_primary_10_1063_1_5112214</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2245910578</sourcerecordid><originalsourceid>FETCH-LOGICAL-p253t-cd843e9d66d5278108584517036f42c0c4b88b2fd3ee6637b6db3dfa42af47623</originalsourceid><addsrcrecordid>eNotkM1Kw0AYRQdRMFYXvkHAnZA63_xnGYpWoeBG0d0wyUzaCWkSZxKhO1_D1_NJbGk3924ul8NB6BbwHLCgDzDnAIQAO0MJcA6ZFCDOUYJxzjLC6OcluoqxwZjkUqoEFUVn2l30Me3rdAh946oxHVrTdb5bp1M8ZHDfPjqbfpgQN6Zt_35-Y2radR_8uNleo4vatNHdnHqG3p8e3xbP2ep1-bIoVtlAOB2zyipGXW6FsJxIBVhxxThITEXNSIUrVipVktpS54SgshS2pLY2jJiaSUHoDN0df_eUX5OLo276KezpoyaE8Rwwl2q_uj-uYuVHM_q-00PwWxN2GrA-KNKgT4roP_KJWJs</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>conference_proceeding</recordtype><pqid>2245910578</pqid></control><display><type>conference_proceeding</type><title>Analysis of project planning using revised Warshall’s algorithm</title><source>AIP Journals Complete</source><creator>Karthy, T. ; Ramya, S.</creator><contributor>Govindarajan, A. ; Sangeetha, S. ; Sambath, P.</contributor><creatorcontrib>Karthy, T. ; Ramya, S. ; Govindarajan, A. ; Sangeetha, S. ; Sambath, P.</creatorcontrib><description>A Myraid of details must be considered in planning how to coordinate all these activities in developing a realistic schedule and then in monitoring the progress of the project. The overview begins with the description of each graphical scheduling technique Gantt chart or Bar chart. It continues with example of contributors to scheduling and control that include: CPM, Metra potential method, Revised Warshall’s algorithm.</description><identifier>ISSN: 0094-243X</identifier><identifier>EISSN: 1551-7616</identifier><identifier>DOI: 10.1063/1.5112214</identifier><identifier>CODEN: APCPCS</identifier><language>eng</language><publisher>Melville: American Institute of Physics</publisher><subject>Algorithms ; Control charts ; Gantt charts ; Project planning ; Schedules ; Scheduling</subject><ispartof>AIP conference proceedings, 2019, Vol.2112 (1)</ispartof><rights>Author(s)</rights><rights>2019 Author(s). Published by AIP Publishing.</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://pubs.aip.org/acp/article-lookup/doi/10.1063/1.5112214$$EHTML$$P50$$Gscitation$$H</linktohtml><link.rule.ids>309,310,314,776,780,785,786,790,4497,23910,23911,25119,27903,27904,76131</link.rule.ids></links><search><contributor>Govindarajan, A.</contributor><contributor>Sangeetha, S.</contributor><contributor>Sambath, P.</contributor><creatorcontrib>Karthy, T.</creatorcontrib><creatorcontrib>Ramya, S.</creatorcontrib><title>Analysis of project planning using revised Warshall’s algorithm</title><title>AIP conference proceedings</title><description>A Myraid of details must be considered in planning how to coordinate all these activities in developing a realistic schedule and then in monitoring the progress of the project. The overview begins with the description of each graphical scheduling technique Gantt chart or Bar chart. It continues with example of contributors to scheduling and control that include: CPM, Metra potential method, Revised Warshall’s algorithm.</description><subject>Algorithms</subject><subject>Control charts</subject><subject>Gantt charts</subject><subject>Project planning</subject><subject>Schedules</subject><subject>Scheduling</subject><issn>0094-243X</issn><issn>1551-7616</issn><fulltext>true</fulltext><rsrctype>conference_proceeding</rsrctype><creationdate>2019</creationdate><recordtype>conference_proceeding</recordtype><recordid>eNotkM1Kw0AYRQdRMFYXvkHAnZA63_xnGYpWoeBG0d0wyUzaCWkSZxKhO1_D1_NJbGk3924ul8NB6BbwHLCgDzDnAIQAO0MJcA6ZFCDOUYJxzjLC6OcluoqxwZjkUqoEFUVn2l30Me3rdAh946oxHVrTdb5bp1M8ZHDfPjqbfpgQN6Zt_35-Y2radR_8uNleo4vatNHdnHqG3p8e3xbP2ep1-bIoVtlAOB2zyipGXW6FsJxIBVhxxThITEXNSIUrVipVktpS54SgshS2pLY2jJiaSUHoDN0df_eUX5OLo276KezpoyaE8Rwwl2q_uj-uYuVHM_q-00PwWxN2GrA-KNKgT4roP_KJWJs</recordid><startdate>20190621</startdate><enddate>20190621</enddate><creator>Karthy, T.</creator><creator>Ramya, S.</creator><general>American Institute of Physics</general><scope>8FD</scope><scope>H8D</scope><scope>L7M</scope></search><sort><creationdate>20190621</creationdate><title>Analysis of project planning using revised Warshall’s algorithm</title><author>Karthy, T. ; Ramya, S.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-p253t-cd843e9d66d5278108584517036f42c0c4b88b2fd3ee6637b6db3dfa42af47623</frbrgroupid><rsrctype>conference_proceedings</rsrctype><prefilter>conference_proceedings</prefilter><language>eng</language><creationdate>2019</creationdate><topic>Algorithms</topic><topic>Control charts</topic><topic>Gantt charts</topic><topic>Project planning</topic><topic>Schedules</topic><topic>Scheduling</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Karthy, T.</creatorcontrib><creatorcontrib>Ramya, S.</creatorcontrib><collection>Technology Research Database</collection><collection>Aerospace Database</collection><collection>Advanced Technologies Database with Aerospace</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Karthy, T.</au><au>Ramya, S.</au><au>Govindarajan, A.</au><au>Sangeetha, S.</au><au>Sambath, P.</au><format>book</format><genre>proceeding</genre><ristype>CONF</ristype><atitle>Analysis of project planning using revised Warshall’s algorithm</atitle><btitle>AIP conference proceedings</btitle><date>2019-06-21</date><risdate>2019</risdate><volume>2112</volume><issue>1</issue><issn>0094-243X</issn><eissn>1551-7616</eissn><coden>APCPCS</coden><abstract>A Myraid of details must be considered in planning how to coordinate all these activities in developing a realistic schedule and then in monitoring the progress of the project. The overview begins with the description of each graphical scheduling technique Gantt chart or Bar chart. It continues with example of contributors to scheduling and control that include: CPM, Metra potential method, Revised Warshall’s algorithm.</abstract><cop>Melville</cop><pub>American Institute of Physics</pub><doi>10.1063/1.5112214</doi><tpages>8</tpages><oa>free_for_read</oa></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0094-243X |
ispartof | AIP conference proceedings, 2019, Vol.2112 (1) |
issn | 0094-243X 1551-7616 |
language | eng |
recordid | cdi_scitation_primary_10_1063_1_5112214 |
source | AIP Journals Complete |
subjects | Algorithms Control charts Gantt charts Project planning Schedules Scheduling |
title | Analysis of project planning using revised Warshall’s algorithm |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-21T14%3A14%3A36IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_scita&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=proceeding&rft.atitle=Analysis%20of%20project%20planning%20using%20revised%20Warshall%E2%80%99s%20algorithm&rft.btitle=AIP%20conference%20proceedings&rft.au=Karthy,%20T.&rft.date=2019-06-21&rft.volume=2112&rft.issue=1&rft.issn=0094-243X&rft.eissn=1551-7616&rft.coden=APCPCS&rft_id=info:doi/10.1063/1.5112214&rft_dat=%3Cproquest_scita%3E2245910578%3C/proquest_scita%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2245910578&rft_id=info:pmid/&rfr_iscdi=true |