Analysis of project planning using revised Warshall’s algorithm

A Myraid of details must be considered in planning how to coordinate all these activities in developing a realistic schedule and then in monitoring the progress of the project. The overview begins with the description of each graphical scheduling technique Gantt chart or Bar chart. It continues with...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Karthy, T., Ramya, S.
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue 1
container_start_page
container_title
container_volume 2112
creator Karthy, T.
Ramya, S.
description A Myraid of details must be considered in planning how to coordinate all these activities in developing a realistic schedule and then in monitoring the progress of the project. The overview begins with the description of each graphical scheduling technique Gantt chart or Bar chart. It continues with example of contributors to scheduling and control that include: CPM, Metra potential method, Revised Warshall’s algorithm.
doi_str_mv 10.1063/1.5112214
format Conference Proceeding
fullrecord <record><control><sourceid>proquest_scita</sourceid><recordid>TN_cdi_scitation_primary_10_1063_1_5112214</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2245910578</sourcerecordid><originalsourceid>FETCH-LOGICAL-p253t-cd843e9d66d5278108584517036f42c0c4b88b2fd3ee6637b6db3dfa42af47623</originalsourceid><addsrcrecordid>eNotkM1Kw0AYRQdRMFYXvkHAnZA63_xnGYpWoeBG0d0wyUzaCWkSZxKhO1_D1_NJbGk3924ul8NB6BbwHLCgDzDnAIQAO0MJcA6ZFCDOUYJxzjLC6OcluoqxwZjkUqoEFUVn2l30Me3rdAh946oxHVrTdb5bp1M8ZHDfPjqbfpgQN6Zt_35-Y2radR_8uNleo4vatNHdnHqG3p8e3xbP2ep1-bIoVtlAOB2zyipGXW6FsJxIBVhxxThITEXNSIUrVipVktpS54SgshS2pLY2jJiaSUHoDN0df_eUX5OLo276KezpoyaE8Rwwl2q_uj-uYuVHM_q-00PwWxN2GrA-KNKgT4roP_KJWJs</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>conference_proceeding</recordtype><pqid>2245910578</pqid></control><display><type>conference_proceeding</type><title>Analysis of project planning using revised Warshall’s algorithm</title><source>AIP Journals Complete</source><creator>Karthy, T. ; Ramya, S.</creator><contributor>Govindarajan, A. ; Sangeetha, S. ; Sambath, P.</contributor><creatorcontrib>Karthy, T. ; Ramya, S. ; Govindarajan, A. ; Sangeetha, S. ; Sambath, P.</creatorcontrib><description>A Myraid of details must be considered in planning how to coordinate all these activities in developing a realistic schedule and then in monitoring the progress of the project. The overview begins with the description of each graphical scheduling technique Gantt chart or Bar chart. It continues with example of contributors to scheduling and control that include: CPM, Metra potential method, Revised Warshall’s algorithm.</description><identifier>ISSN: 0094-243X</identifier><identifier>EISSN: 1551-7616</identifier><identifier>DOI: 10.1063/1.5112214</identifier><identifier>CODEN: APCPCS</identifier><language>eng</language><publisher>Melville: American Institute of Physics</publisher><subject>Algorithms ; Control charts ; Gantt charts ; Project planning ; Schedules ; Scheduling</subject><ispartof>AIP conference proceedings, 2019, Vol.2112 (1)</ispartof><rights>Author(s)</rights><rights>2019 Author(s). Published by AIP Publishing.</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://pubs.aip.org/acp/article-lookup/doi/10.1063/1.5112214$$EHTML$$P50$$Gscitation$$H</linktohtml><link.rule.ids>309,310,314,776,780,785,786,790,4497,23910,23911,25119,27903,27904,76131</link.rule.ids></links><search><contributor>Govindarajan, A.</contributor><contributor>Sangeetha, S.</contributor><contributor>Sambath, P.</contributor><creatorcontrib>Karthy, T.</creatorcontrib><creatorcontrib>Ramya, S.</creatorcontrib><title>Analysis of project planning using revised Warshall’s algorithm</title><title>AIP conference proceedings</title><description>A Myraid of details must be considered in planning how to coordinate all these activities in developing a realistic schedule and then in monitoring the progress of the project. The overview begins with the description of each graphical scheduling technique Gantt chart or Bar chart. It continues with example of contributors to scheduling and control that include: CPM, Metra potential method, Revised Warshall’s algorithm.</description><subject>Algorithms</subject><subject>Control charts</subject><subject>Gantt charts</subject><subject>Project planning</subject><subject>Schedules</subject><subject>Scheduling</subject><issn>0094-243X</issn><issn>1551-7616</issn><fulltext>true</fulltext><rsrctype>conference_proceeding</rsrctype><creationdate>2019</creationdate><recordtype>conference_proceeding</recordtype><recordid>eNotkM1Kw0AYRQdRMFYXvkHAnZA63_xnGYpWoeBG0d0wyUzaCWkSZxKhO1_D1_NJbGk3924ul8NB6BbwHLCgDzDnAIQAO0MJcA6ZFCDOUYJxzjLC6OcluoqxwZjkUqoEFUVn2l30Me3rdAh946oxHVrTdb5bp1M8ZHDfPjqbfpgQN6Zt_35-Y2radR_8uNleo4vatNHdnHqG3p8e3xbP2ep1-bIoVtlAOB2zyipGXW6FsJxIBVhxxThITEXNSIUrVipVktpS54SgshS2pLY2jJiaSUHoDN0df_eUX5OLo276KezpoyaE8Rwwl2q_uj-uYuVHM_q-00PwWxN2GrA-KNKgT4roP_KJWJs</recordid><startdate>20190621</startdate><enddate>20190621</enddate><creator>Karthy, T.</creator><creator>Ramya, S.</creator><general>American Institute of Physics</general><scope>8FD</scope><scope>H8D</scope><scope>L7M</scope></search><sort><creationdate>20190621</creationdate><title>Analysis of project planning using revised Warshall’s algorithm</title><author>Karthy, T. ; Ramya, S.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-p253t-cd843e9d66d5278108584517036f42c0c4b88b2fd3ee6637b6db3dfa42af47623</frbrgroupid><rsrctype>conference_proceedings</rsrctype><prefilter>conference_proceedings</prefilter><language>eng</language><creationdate>2019</creationdate><topic>Algorithms</topic><topic>Control charts</topic><topic>Gantt charts</topic><topic>Project planning</topic><topic>Schedules</topic><topic>Scheduling</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Karthy, T.</creatorcontrib><creatorcontrib>Ramya, S.</creatorcontrib><collection>Technology Research Database</collection><collection>Aerospace Database</collection><collection>Advanced Technologies Database with Aerospace</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Karthy, T.</au><au>Ramya, S.</au><au>Govindarajan, A.</au><au>Sangeetha, S.</au><au>Sambath, P.</au><format>book</format><genre>proceeding</genre><ristype>CONF</ristype><atitle>Analysis of project planning using revised Warshall’s algorithm</atitle><btitle>AIP conference proceedings</btitle><date>2019-06-21</date><risdate>2019</risdate><volume>2112</volume><issue>1</issue><issn>0094-243X</issn><eissn>1551-7616</eissn><coden>APCPCS</coden><abstract>A Myraid of details must be considered in planning how to coordinate all these activities in developing a realistic schedule and then in monitoring the progress of the project. The overview begins with the description of each graphical scheduling technique Gantt chart or Bar chart. It continues with example of contributors to scheduling and control that include: CPM, Metra potential method, Revised Warshall’s algorithm.</abstract><cop>Melville</cop><pub>American Institute of Physics</pub><doi>10.1063/1.5112214</doi><tpages>8</tpages><oa>free_for_read</oa></addata></record>
fulltext fulltext
identifier ISSN: 0094-243X
ispartof AIP conference proceedings, 2019, Vol.2112 (1)
issn 0094-243X
1551-7616
language eng
recordid cdi_scitation_primary_10_1063_1_5112214
source AIP Journals Complete
subjects Algorithms
Control charts
Gantt charts
Project planning
Schedules
Scheduling
title Analysis of project planning using revised Warshall’s algorithm
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-21T14%3A14%3A36IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_scita&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=proceeding&rft.atitle=Analysis%20of%20project%20planning%20using%20revised%20Warshall%E2%80%99s%20algorithm&rft.btitle=AIP%20conference%20proceedings&rft.au=Karthy,%20T.&rft.date=2019-06-21&rft.volume=2112&rft.issue=1&rft.issn=0094-243X&rft.eissn=1551-7616&rft.coden=APCPCS&rft_id=info:doi/10.1063/1.5112214&rft_dat=%3Cproquest_scita%3E2245910578%3C/proquest_scita%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2245910578&rft_id=info:pmid/&rfr_iscdi=true