An optimization model for liquid steel production allocation at PT. XYZ considering maintenance schedule

PT. XYZ is one of the largest steel companies in Indonesia which has several production units and produces a wide range of steel products. The company has several production units, namely Direct Reduction Plant (DRP), Billet Steel Plant (BSP), Slab Steel Plant (SSP), Hot Strip Mill (HSM), Cold Rolli...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Hapsari, Shanella Nestri, Rosyidi, Cucuk Nur, Jauhari, Wakhid Ahmad
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue 1
container_start_page
container_title
container_volume 2097
creator Hapsari, Shanella Nestri
Rosyidi, Cucuk Nur
Jauhari, Wakhid Ahmad
description PT. XYZ is one of the largest steel companies in Indonesia which has several production units and produces a wide range of steel products. The company has several production units, namely Direct Reduction Plant (DRP), Billet Steel Plant (BSP), Slab Steel Plant (SSP), Hot Strip Mill (HSM), Cold Rolling Mill (CRM), and Wire Rod Mill (WRM). HSM as one of the unit production under company produces hot rolled coil, and requires the supply of raw materials from another unit production (SSP). SSP has four Electric Arc Furnace (EAF), produces liquid steel as raw material of slab steel. In this research, we developed an optimization allocation model in EAF of SSP to maximize the profit considering maintenance schedule. The optimization model was solved by Optquest – Crystal Ball. The optimization results show that the model is able to find the optimal allocation of liquid steel production of each period considering EAF maintenance schedule. Based on the optimal result, the company can achieve a total profit of IDR 13,774,888,400.
doi_str_mv 10.1063/1.5098214
format Conference Proceeding
fullrecord <record><control><sourceid>proquest_scita</sourceid><recordid>TN_cdi_scitation_primary_10_1063_1_5098214</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2212951963</sourcerecordid><originalsourceid>FETCH-LOGICAL-p253t-ff3342f61388eb40905c6e5b50c21475df453012bdabbe445ccaad6f6d59f45e3</originalsourceid><addsrcrecordid>eNp9kEtLAzEUhYMoWKsL_0HAnTA1z3ksi_iCgi4qVDchk4dNmUmmk4ygv96xLbhzdeCej3vvOQBcYjTDKKc3eMZRVRLMjsAEc46zIsf5MZggVLGMMLo6BWcxbhAiVVGUE7Ceexi65Fr3LZMLHrZBmwba0MPGbQenYUxmHHR90IPaEbJpgtrDMsGX5Qyu3t6hCj46bXrnP2ArnU_GS68MjGpt9NCYc3BiZRPNxUGn4PX-bnn7mC2eH55u54usI5ymzFpKGbE5pmVpaoYqxFVueM2RGkMVXFvGKcKk1rKuDWNcKSl1bnPNq9EydAqu9nvHj7eDiUlswtD78aQgBJOK4yqnI3W9p6JyaZdFdL1rZf8lMBK_TQosDk3-B3-G_g8Unbb0B76wdYE</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>conference_proceeding</recordtype><pqid>2212951963</pqid></control><display><type>conference_proceeding</type><title>An optimization model for liquid steel production allocation at PT. XYZ considering maintenance schedule</title><source>American Institute of Physics (AIP) Journals</source><creator>Hapsari, Shanella Nestri ; Rosyidi, Cucuk Nur ; Jauhari, Wakhid Ahmad</creator><contributor>Sulistyo, Meiyanto Eko ; Maghfiroh, Hari ; Pramono, Subuh ; Ibrahim, Muhammad Hamka ; Apribowo, Chico Hermanu Brillianto ; Adriyanto, Feri ; Anwar, Miftahul ; Ibrahim, Sutrisno</contributor><creatorcontrib>Hapsari, Shanella Nestri ; Rosyidi, Cucuk Nur ; Jauhari, Wakhid Ahmad ; Sulistyo, Meiyanto Eko ; Maghfiroh, Hari ; Pramono, Subuh ; Ibrahim, Muhammad Hamka ; Apribowo, Chico Hermanu Brillianto ; Adriyanto, Feri ; Anwar, Miftahul ; Ibrahim, Sutrisno</creatorcontrib><description>PT. XYZ is one of the largest steel companies in Indonesia which has several production units and produces a wide range of steel products. The company has several production units, namely Direct Reduction Plant (DRP), Billet Steel Plant (BSP), Slab Steel Plant (SSP), Hot Strip Mill (HSM), Cold Rolling Mill (CRM), and Wire Rod Mill (WRM). HSM as one of the unit production under company produces hot rolled coil, and requires the supply of raw materials from another unit production (SSP). SSP has four Electric Arc Furnace (EAF), produces liquid steel as raw material of slab steel. In this research, we developed an optimization allocation model in EAF of SSP to maximize the profit considering maintenance schedule. The optimization model was solved by Optquest – Crystal Ball. The optimization results show that the model is able to find the optimal allocation of liquid steel production of each period considering EAF maintenance schedule. Based on the optimal result, the company can achieve a total profit of IDR 13,774,888,400.</description><identifier>ISSN: 0094-243X</identifier><identifier>EISSN: 1551-7616</identifier><identifier>DOI: 10.1063/1.5098214</identifier><identifier>CODEN: APCPCS</identifier><language>eng</language><publisher>Melville: American Institute of Physics</publisher><subject>Coils ; Coils (strip) ; Cold rolling mills ; Cold strip mills ; Direct reduction plants ; Electric arc furnaces ; Electric wire ; Hot rolling ; Hot strip mills ; Iron and steel industry ; Iron and steel making ; Iron and steel plants ; Maintenance management ; Optimization models ; Raw materials ; Rod mills (rolling) ; Rolling mills ; Schedules ; Steel industry ; Steel making ; Steel production ; Steel products ; Strip mills ; Wire rod</subject><ispartof>AIP Conference Proceedings, 2019, Vol.2097 (1)</ispartof><rights>Author(s)</rights><rights>2019 Author(s). Published by AIP Publishing.</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://pubs.aip.org/acp/article-lookup/doi/10.1063/1.5098214$$EHTML$$P50$$Gscitation$$H</linktohtml><link.rule.ids>310,311,315,781,785,790,791,795,4513,23935,23936,25145,27929,27930,76389</link.rule.ids></links><search><contributor>Sulistyo, Meiyanto Eko</contributor><contributor>Maghfiroh, Hari</contributor><contributor>Pramono, Subuh</contributor><contributor>Ibrahim, Muhammad Hamka</contributor><contributor>Apribowo, Chico Hermanu Brillianto</contributor><contributor>Adriyanto, Feri</contributor><contributor>Anwar, Miftahul</contributor><contributor>Ibrahim, Sutrisno</contributor><creatorcontrib>Hapsari, Shanella Nestri</creatorcontrib><creatorcontrib>Rosyidi, Cucuk Nur</creatorcontrib><creatorcontrib>Jauhari, Wakhid Ahmad</creatorcontrib><title>An optimization model for liquid steel production allocation at PT. XYZ considering maintenance schedule</title><title>AIP Conference Proceedings</title><description>PT. XYZ is one of the largest steel companies in Indonesia which has several production units and produces a wide range of steel products. The company has several production units, namely Direct Reduction Plant (DRP), Billet Steel Plant (BSP), Slab Steel Plant (SSP), Hot Strip Mill (HSM), Cold Rolling Mill (CRM), and Wire Rod Mill (WRM). HSM as one of the unit production under company produces hot rolled coil, and requires the supply of raw materials from another unit production (SSP). SSP has four Electric Arc Furnace (EAF), produces liquid steel as raw material of slab steel. In this research, we developed an optimization allocation model in EAF of SSP to maximize the profit considering maintenance schedule. The optimization model was solved by Optquest – Crystal Ball. The optimization results show that the model is able to find the optimal allocation of liquid steel production of each period considering EAF maintenance schedule. Based on the optimal result, the company can achieve a total profit of IDR 13,774,888,400.</description><subject>Coils</subject><subject>Coils (strip)</subject><subject>Cold rolling mills</subject><subject>Cold strip mills</subject><subject>Direct reduction plants</subject><subject>Electric arc furnaces</subject><subject>Electric wire</subject><subject>Hot rolling</subject><subject>Hot strip mills</subject><subject>Iron and steel industry</subject><subject>Iron and steel making</subject><subject>Iron and steel plants</subject><subject>Maintenance management</subject><subject>Optimization models</subject><subject>Raw materials</subject><subject>Rod mills (rolling)</subject><subject>Rolling mills</subject><subject>Schedules</subject><subject>Steel industry</subject><subject>Steel making</subject><subject>Steel production</subject><subject>Steel products</subject><subject>Strip mills</subject><subject>Wire rod</subject><issn>0094-243X</issn><issn>1551-7616</issn><fulltext>true</fulltext><rsrctype>conference_proceeding</rsrctype><creationdate>2019</creationdate><recordtype>conference_proceeding</recordtype><recordid>eNp9kEtLAzEUhYMoWKsL_0HAnTA1z3ksi_iCgi4qVDchk4dNmUmmk4ygv96xLbhzdeCej3vvOQBcYjTDKKc3eMZRVRLMjsAEc46zIsf5MZggVLGMMLo6BWcxbhAiVVGUE7Ceexi65Fr3LZMLHrZBmwba0MPGbQenYUxmHHR90IPaEbJpgtrDMsGX5Qyu3t6hCj46bXrnP2ArnU_GS68MjGpt9NCYc3BiZRPNxUGn4PX-bnn7mC2eH55u54usI5ymzFpKGbE5pmVpaoYqxFVueM2RGkMVXFvGKcKk1rKuDWNcKSl1bnPNq9EydAqu9nvHj7eDiUlswtD78aQgBJOK4yqnI3W9p6JyaZdFdL1rZf8lMBK_TQosDk3-B3-G_g8Unbb0B76wdYE</recordid><startdate>20190423</startdate><enddate>20190423</enddate><creator>Hapsari, Shanella Nestri</creator><creator>Rosyidi, Cucuk Nur</creator><creator>Jauhari, Wakhid Ahmad</creator><general>American Institute of Physics</general><scope>8FD</scope><scope>H8D</scope><scope>L7M</scope></search><sort><creationdate>20190423</creationdate><title>An optimization model for liquid steel production allocation at PT. XYZ considering maintenance schedule</title><author>Hapsari, Shanella Nestri ; Rosyidi, Cucuk Nur ; Jauhari, Wakhid Ahmad</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-p253t-ff3342f61388eb40905c6e5b50c21475df453012bdabbe445ccaad6f6d59f45e3</frbrgroupid><rsrctype>conference_proceedings</rsrctype><prefilter>conference_proceedings</prefilter><language>eng</language><creationdate>2019</creationdate><topic>Coils</topic><topic>Coils (strip)</topic><topic>Cold rolling mills</topic><topic>Cold strip mills</topic><topic>Direct reduction plants</topic><topic>Electric arc furnaces</topic><topic>Electric wire</topic><topic>Hot rolling</topic><topic>Hot strip mills</topic><topic>Iron and steel industry</topic><topic>Iron and steel making</topic><topic>Iron and steel plants</topic><topic>Maintenance management</topic><topic>Optimization models</topic><topic>Raw materials</topic><topic>Rod mills (rolling)</topic><topic>Rolling mills</topic><topic>Schedules</topic><topic>Steel industry</topic><topic>Steel making</topic><topic>Steel production</topic><topic>Steel products</topic><topic>Strip mills</topic><topic>Wire rod</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Hapsari, Shanella Nestri</creatorcontrib><creatorcontrib>Rosyidi, Cucuk Nur</creatorcontrib><creatorcontrib>Jauhari, Wakhid Ahmad</creatorcontrib><collection>Technology Research Database</collection><collection>Aerospace Database</collection><collection>Advanced Technologies Database with Aerospace</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Hapsari, Shanella Nestri</au><au>Rosyidi, Cucuk Nur</au><au>Jauhari, Wakhid Ahmad</au><au>Sulistyo, Meiyanto Eko</au><au>Maghfiroh, Hari</au><au>Pramono, Subuh</au><au>Ibrahim, Muhammad Hamka</au><au>Apribowo, Chico Hermanu Brillianto</au><au>Adriyanto, Feri</au><au>Anwar, Miftahul</au><au>Ibrahim, Sutrisno</au><format>book</format><genre>proceeding</genre><ristype>CONF</ristype><atitle>An optimization model for liquid steel production allocation at PT. XYZ considering maintenance schedule</atitle><btitle>AIP Conference Proceedings</btitle><date>2019-04-23</date><risdate>2019</risdate><volume>2097</volume><issue>1</issue><issn>0094-243X</issn><eissn>1551-7616</eissn><coden>APCPCS</coden><abstract>PT. XYZ is one of the largest steel companies in Indonesia which has several production units and produces a wide range of steel products. The company has several production units, namely Direct Reduction Plant (DRP), Billet Steel Plant (BSP), Slab Steel Plant (SSP), Hot Strip Mill (HSM), Cold Rolling Mill (CRM), and Wire Rod Mill (WRM). HSM as one of the unit production under company produces hot rolled coil, and requires the supply of raw materials from another unit production (SSP). SSP has four Electric Arc Furnace (EAF), produces liquid steel as raw material of slab steel. In this research, we developed an optimization allocation model in EAF of SSP to maximize the profit considering maintenance schedule. The optimization model was solved by Optquest – Crystal Ball. The optimization results show that the model is able to find the optimal allocation of liquid steel production of each period considering EAF maintenance schedule. Based on the optimal result, the company can achieve a total profit of IDR 13,774,888,400.</abstract><cop>Melville</cop><pub>American Institute of Physics</pub><doi>10.1063/1.5098214</doi><tpages>7</tpages></addata></record>
fulltext fulltext
identifier ISSN: 0094-243X
ispartof AIP Conference Proceedings, 2019, Vol.2097 (1)
issn 0094-243X
1551-7616
language eng
recordid cdi_scitation_primary_10_1063_1_5098214
source American Institute of Physics (AIP) Journals
subjects Coils
Coils (strip)
Cold rolling mills
Cold strip mills
Direct reduction plants
Electric arc furnaces
Electric wire
Hot rolling
Hot strip mills
Iron and steel industry
Iron and steel making
Iron and steel plants
Maintenance management
Optimization models
Raw materials
Rod mills (rolling)
Rolling mills
Schedules
Steel industry
Steel making
Steel production
Steel products
Strip mills
Wire rod
title An optimization model for liquid steel production allocation at PT. XYZ considering maintenance schedule
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-13T18%3A46%3A37IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_scita&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=proceeding&rft.atitle=An%20optimization%20model%20for%20liquid%20steel%20production%20allocation%20at%20PT.%20XYZ%20considering%20maintenance%20schedule&rft.btitle=AIP%20Conference%20Proceedings&rft.au=Hapsari,%20Shanella%20Nestri&rft.date=2019-04-23&rft.volume=2097&rft.issue=1&rft.issn=0094-243X&rft.eissn=1551-7616&rft.coden=APCPCS&rft_id=info:doi/10.1063/1.5098214&rft_dat=%3Cproquest_scita%3E2212951963%3C/proquest_scita%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2212951963&rft_id=info:pmid/&rfr_iscdi=true