Planning and scheduling for petroleum refineries using mathematical programming

The objective of this paper is the development and solution of nonlinear and mixed-integer (MIP) optimization models for real-world planning and scheduling problems in petroleum refineries. Firstly, we present a nonlinear planning model that represents a general refinery topology and allows implemen...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Brazilian journal of chemical engineering 2002-04, Vol.19 (2), p.207-228
Hauptverfasser: Joly, M., Moro, L.F.L., Pinto, J.M.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 228
container_issue 2
container_start_page 207
container_title Brazilian journal of chemical engineering
container_volume 19
creator Joly, M.
Moro, L.F.L.
Pinto, J.M.
description The objective of this paper is the development and solution of nonlinear and mixed-integer (MIP) optimization models for real-world planning and scheduling problems in petroleum refineries. Firstly, we present a nonlinear planning model that represents a general refinery topology and allows implementation of nonlinear process models as well as blending relations. The optimization model is able to define new operating points, thus increasing the production of the more valuable products and simultaneously satisfying all specification constraints. The second part addresses scheduling problems in oil refineries, which are formulated as MIP optimization models and rely on both continuous and discrete time representations. Three practical applications closely related to the current refinery scenario are presented. The first one addresses the problem of crude oil inventory management of a refinery that receives several types of crude oil delivered exclusively by a single oil pipeline. Subsequently, two optimization models intended to define the optimal production policy, inventory control and distribution are proposed and solved for the fuel oil and asphalt plant. Finally, the planning model of Moro et al. (1998) is extended in order to sequence decisions at the scheduling level in the liquefied petroleum gas (LPG) area for maximization of the production of petrochemical-grade propane and product delivery.
doi_str_mv 10.1590/S0104-66322002000200008
format Article
fullrecord <record><control><sourceid>scielo_cross</sourceid><recordid>TN_cdi_scielo_journals_S0104_66322002000200008</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><scielo_id>S0104_66322002000200008</scielo_id><sourcerecordid>S0104_66322002000200008</sourcerecordid><originalsourceid>FETCH-LOGICAL-c380t-9ad4e1e762749b133339df1ecee2c3dfb9b4a916713bc4ad0620b7fb741bb5483</originalsourceid><addsrcrecordid>eNp1UNtKxDAQDaLguvoN9ge6Jk3aNI-yeIOFFdTnkMtkt0ublqR98O9Nd0UEMUzmwpkzwxyEbglekVLguzdMMMurihYFxsmOH9dnaPEDnP_KL9FVjIfUVWIqFmj72irvG7_LlLdZNHuwUzuXrg_ZAGPoW5i6LIBrPIQGYjbFGe7UuIfkGqPabAj9LqiuS8A1unCqjXDzHZfo4_Hhff2cb7ZPL-v7TW5ojcdcKMuAAK8KzoQmND1hHQEDUBhqnRaaKUEqTqg2TFlcFVhzpzkjWpespku0Os2NpoG2l4d-Cj4tlEc55B85EoGfCCb0MaZ75BCaToVPSbCchfyX-QVNomTy</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Planning and scheduling for petroleum refineries using mathematical programming</title><source>EZB-FREE-00999 freely available EZB journals</source><source>Free Full-Text Journals in Chemistry</source><creator>Joly, M. ; Moro, L.F.L. ; Pinto, J.M.</creator><creatorcontrib>Joly, M. ; Moro, L.F.L. ; Pinto, J.M.</creatorcontrib><description>The objective of this paper is the development and solution of nonlinear and mixed-integer (MIP) optimization models for real-world planning and scheduling problems in petroleum refineries. Firstly, we present a nonlinear planning model that represents a general refinery topology and allows implementation of nonlinear process models as well as blending relations. The optimization model is able to define new operating points, thus increasing the production of the more valuable products and simultaneously satisfying all specification constraints. The second part addresses scheduling problems in oil refineries, which are formulated as MIP optimization models and rely on both continuous and discrete time representations. Three practical applications closely related to the current refinery scenario are presented. The first one addresses the problem of crude oil inventory management of a refinery that receives several types of crude oil delivered exclusively by a single oil pipeline. Subsequently, two optimization models intended to define the optimal production policy, inventory control and distribution are proposed and solved for the fuel oil and asphalt plant. Finally, the planning model of Moro et al. (1998) is extended in order to sequence decisions at the scheduling level in the liquefied petroleum gas (LPG) area for maximization of the production of petrochemical-grade propane and product delivery.</description><identifier>ISSN: 0104-6632</identifier><identifier>ISSN: 1678-4383</identifier><identifier>EISSN: 0104-6632</identifier><identifier>DOI: 10.1590/S0104-66322002000200008</identifier><language>eng</language><publisher>Brazilian Society of Chemical Engineering</publisher><subject>ENGINEERING, CHEMICAL</subject><ispartof>Brazilian journal of chemical engineering, 2002-04, Vol.19 (2), p.207-228</ispartof><rights>This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c380t-9ad4e1e762749b133339df1ecee2c3dfb9b4a916713bc4ad0620b7fb741bb5483</citedby><cites>FETCH-LOGICAL-c380t-9ad4e1e762749b133339df1ecee2c3dfb9b4a916713bc4ad0620b7fb741bb5483</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>230,314,780,784,885,27923,27924</link.rule.ids></links><search><creatorcontrib>Joly, M.</creatorcontrib><creatorcontrib>Moro, L.F.L.</creatorcontrib><creatorcontrib>Pinto, J.M.</creatorcontrib><title>Planning and scheduling for petroleum refineries using mathematical programming</title><title>Brazilian journal of chemical engineering</title><addtitle>Braz. J. Chem. Eng</addtitle><description>The objective of this paper is the development and solution of nonlinear and mixed-integer (MIP) optimization models for real-world planning and scheduling problems in petroleum refineries. Firstly, we present a nonlinear planning model that represents a general refinery topology and allows implementation of nonlinear process models as well as blending relations. The optimization model is able to define new operating points, thus increasing the production of the more valuable products and simultaneously satisfying all specification constraints. The second part addresses scheduling problems in oil refineries, which are formulated as MIP optimization models and rely on both continuous and discrete time representations. Three practical applications closely related to the current refinery scenario are presented. The first one addresses the problem of crude oil inventory management of a refinery that receives several types of crude oil delivered exclusively by a single oil pipeline. Subsequently, two optimization models intended to define the optimal production policy, inventory control and distribution are proposed and solved for the fuel oil and asphalt plant. Finally, the planning model of Moro et al. (1998) is extended in order to sequence decisions at the scheduling level in the liquefied petroleum gas (LPG) area for maximization of the production of petrochemical-grade propane and product delivery.</description><subject>ENGINEERING, CHEMICAL</subject><issn>0104-6632</issn><issn>1678-4383</issn><issn>0104-6632</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2002</creationdate><recordtype>article</recordtype><recordid>eNp1UNtKxDAQDaLguvoN9ge6Jk3aNI-yeIOFFdTnkMtkt0ublqR98O9Nd0UEMUzmwpkzwxyEbglekVLguzdMMMurihYFxsmOH9dnaPEDnP_KL9FVjIfUVWIqFmj72irvG7_LlLdZNHuwUzuXrg_ZAGPoW5i6LIBrPIQGYjbFGe7UuIfkGqPabAj9LqiuS8A1unCqjXDzHZfo4_Hhff2cb7ZPL-v7TW5ojcdcKMuAAK8KzoQmND1hHQEDUBhqnRaaKUEqTqg2TFlcFVhzpzkjWpespku0Os2NpoG2l4d-Cj4tlEc55B85EoGfCCb0MaZ75BCaToVPSbCchfyX-QVNomTy</recordid><startdate>20020401</startdate><enddate>20020401</enddate><creator>Joly, M.</creator><creator>Moro, L.F.L.</creator><creator>Pinto, J.M.</creator><general>Brazilian Society of Chemical Engineering</general><scope>AAYXX</scope><scope>CITATION</scope><scope>GPN</scope></search><sort><creationdate>20020401</creationdate><title>Planning and scheduling for petroleum refineries using mathematical programming</title><author>Joly, M. ; Moro, L.F.L. ; Pinto, J.M.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c380t-9ad4e1e762749b133339df1ecee2c3dfb9b4a916713bc4ad0620b7fb741bb5483</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2002</creationdate><topic>ENGINEERING, CHEMICAL</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Joly, M.</creatorcontrib><creatorcontrib>Moro, L.F.L.</creatorcontrib><creatorcontrib>Pinto, J.M.</creatorcontrib><collection>CrossRef</collection><collection>SciELO</collection><jtitle>Brazilian journal of chemical engineering</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Joly, M.</au><au>Moro, L.F.L.</au><au>Pinto, J.M.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Planning and scheduling for petroleum refineries using mathematical programming</atitle><jtitle>Brazilian journal of chemical engineering</jtitle><addtitle>Braz. J. Chem. Eng</addtitle><date>2002-04-01</date><risdate>2002</risdate><volume>19</volume><issue>2</issue><spage>207</spage><epage>228</epage><pages>207-228</pages><issn>0104-6632</issn><issn>1678-4383</issn><eissn>0104-6632</eissn><abstract>The objective of this paper is the development and solution of nonlinear and mixed-integer (MIP) optimization models for real-world planning and scheduling problems in petroleum refineries. Firstly, we present a nonlinear planning model that represents a general refinery topology and allows implementation of nonlinear process models as well as blending relations. The optimization model is able to define new operating points, thus increasing the production of the more valuable products and simultaneously satisfying all specification constraints. The second part addresses scheduling problems in oil refineries, which are formulated as MIP optimization models and rely on both continuous and discrete time representations. Three practical applications closely related to the current refinery scenario are presented. The first one addresses the problem of crude oil inventory management of a refinery that receives several types of crude oil delivered exclusively by a single oil pipeline. Subsequently, two optimization models intended to define the optimal production policy, inventory control and distribution are proposed and solved for the fuel oil and asphalt plant. Finally, the planning model of Moro et al. (1998) is extended in order to sequence decisions at the scheduling level in the liquefied petroleum gas (LPG) area for maximization of the production of petrochemical-grade propane and product delivery.</abstract><pub>Brazilian Society of Chemical Engineering</pub><doi>10.1590/S0104-66322002000200008</doi><tpages>22</tpages><oa>free_for_read</oa></addata></record>
fulltext fulltext
identifier ISSN: 0104-6632
ispartof Brazilian journal of chemical engineering, 2002-04, Vol.19 (2), p.207-228
issn 0104-6632
1678-4383
0104-6632
language eng
recordid cdi_scielo_journals_S0104_66322002000200008
source EZB-FREE-00999 freely available EZB journals; Free Full-Text Journals in Chemistry
subjects ENGINEERING, CHEMICAL
title Planning and scheduling for petroleum refineries using mathematical programming
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-09T03%3A53%3A42IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-scielo_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Planning%20and%20scheduling%20for%20petroleum%20refineries%20using%20mathematical%20programming&rft.jtitle=Brazilian%20journal%20of%20chemical%20engineering&rft.au=Joly,%20M.&rft.date=2002-04-01&rft.volume=19&rft.issue=2&rft.spage=207&rft.epage=228&rft.pages=207-228&rft.issn=0104-6632&rft.eissn=0104-6632&rft_id=info:doi/10.1590/S0104-66322002000200008&rft_dat=%3Cscielo_cross%3ES0104_66322002000200008%3C/scielo_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rft_scielo_id=S0104_66322002000200008&rfr_iscdi=true