The settlement performance of a raft supporting a 27-storey hotel on estuarine deposits in Durban
The raft analysis and design, site investigation and choice of material parameters were descriptionbed, as well as the subsequent monitoring of its settlement performance. Levelling studs and a magnetic borehole extensometer were installed to monitor raft settlements and compression of particular so...
Gespeichert in:
Veröffentlicht in: | Civil engineering (Johannesburg, South Africa) South Africa), 1990-06, Vol.32 (6), p.243 |
---|---|
1. Verfasser: | |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | 6 |
container_start_page | 243 |
container_title | Civil engineering (Johannesburg, South Africa) |
container_volume | 32 |
creator | Plant, G.W., Byrne, G.P., Jaros, M.B. & McMillan, C.M. |
description | The raft analysis and design, site investigation and choice of material parameters were descriptionbed, as well as the subsequent monitoring of its settlement performance. Levelling studs and a magnetic borehole extensometer were installed to monitor raft settlements and compression of particular soil horizons. The maximum settlement measured over five years to April 1988 was 36 mm. The key parameters in raft design were discussed. These included soil parameters, applied loading, contact pressure distribution, stress distribution with depth below the raft, relative raft stiffness and time-dependent settlement. |
format | Article |
fullrecord | <record><control><sourceid>sabinet</sourceid><recordid>TN_cdi_sabinet_saepub_10520_AJA10212019_15235</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sabinet_id>10520/AJA10212019_15235</sabinet_id><sourcerecordid>10520/AJA10212019_15235</sourcerecordid><originalsourceid>FETCH-sabinet_saepub_10520_AJA10212019_152353</originalsourceid><addsrcrecordid>eNqVjksKwkAQBWehYPzcoS8Q6BkJwWXwg7h2HzraMZFkZpjuLLy9Cl7A1YOiCt7MZBadzR0iLsxS5IloXWHLzNC1YxBWHXhkrxA5tSGN5G8MoQWCRK2CTDGGpL1_fIgrc9GQ-AVdUB4geGDRiVLvGe4cg_Qq0Hs4TKkhvzbzlgbhzW9XJj8dr_tzLtR8Cq2FOE5NbbFwWFeX6nvVod3VtnDbYvuv_wbDckeQ</addsrcrecordid><sourcetype>Publisher</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>The settlement performance of a raft supporting a 27-storey hotel on estuarine deposits in Durban</title><source>Sabinet African Journals Core Collection</source><creator>Plant, G.W., Byrne, G.P., Jaros, M.B. & McMillan, C.M.</creator><creatorcontrib>Plant, G.W., Byrne, G.P., Jaros, M.B. & McMillan, C.M.</creatorcontrib><description>The raft analysis and design, site investigation and choice of material parameters were descriptionbed, as well as the subsequent monitoring of its settlement performance. Levelling studs and a magnetic borehole extensometer were installed to monitor raft settlements and compression of particular soil horizons. The maximum settlement measured over five years to April 1988 was 36 mm. The key parameters in raft design were discussed. These included soil parameters, applied loading, contact pressure distribution, stress distribution with depth below the raft, relative raft stiffness and time-dependent settlement.</description><identifier>ISSN: 1021-2000</identifier><language>eng</language><publisher>South African Institution Of Civil Engineering (SAICE)</publisher><subject>Estuarine deposits ; Raft ; Settlement</subject><ispartof>Civil engineering (Johannesburg, South Africa), 1990-06, Vol.32 (6), p.243</ispartof><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,39238</link.rule.ids></links><search><creatorcontrib>Plant, G.W., Byrne, G.P., Jaros, M.B. & McMillan, C.M.</creatorcontrib><title>The settlement performance of a raft supporting a 27-storey hotel on estuarine deposits in Durban</title><title>Civil engineering (Johannesburg, South Africa)</title><description>The raft analysis and design, site investigation and choice of material parameters were descriptionbed, as well as the subsequent monitoring of its settlement performance. Levelling studs and a magnetic borehole extensometer were installed to monitor raft settlements and compression of particular soil horizons. The maximum settlement measured over five years to April 1988 was 36 mm. The key parameters in raft design were discussed. These included soil parameters, applied loading, contact pressure distribution, stress distribution with depth below the raft, relative raft stiffness and time-dependent settlement.</description><subject>Estuarine deposits</subject><subject>Raft</subject><subject>Settlement</subject><issn>1021-2000</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>1990</creationdate><recordtype>article</recordtype><sourceid/><recordid>eNqVjksKwkAQBWehYPzcoS8Q6BkJwWXwg7h2HzraMZFkZpjuLLy9Cl7A1YOiCt7MZBadzR0iLsxS5IloXWHLzNC1YxBWHXhkrxA5tSGN5G8MoQWCRK2CTDGGpL1_fIgrc9GQ-AVdUB4geGDRiVLvGe4cg_Qq0Hs4TKkhvzbzlgbhzW9XJj8dr_tzLtR8Cq2FOE5NbbFwWFeX6nvVod3VtnDbYvuv_wbDckeQ</recordid><startdate>19900601</startdate><enddate>19900601</enddate><creator>Plant, G.W., Byrne, G.P., Jaros, M.B. & McMillan, C.M.</creator><general>South African Institution Of Civil Engineering (SAICE)</general><scope/></search><sort><creationdate>19900601</creationdate><title>The settlement performance of a raft supporting a 27-storey hotel on estuarine deposits in Durban</title><author>Plant, G.W., Byrne, G.P., Jaros, M.B. & McMillan, C.M.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-sabinet_saepub_10520_AJA10212019_152353</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>1990</creationdate><topic>Estuarine deposits</topic><topic>Raft</topic><topic>Settlement</topic><toplevel>online_resources</toplevel><creatorcontrib>Plant, G.W., Byrne, G.P., Jaros, M.B. & McMillan, C.M.</creatorcontrib><jtitle>Civil engineering (Johannesburg, South Africa)</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Plant, G.W., Byrne, G.P., Jaros, M.B. & McMillan, C.M.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>The settlement performance of a raft supporting a 27-storey hotel on estuarine deposits in Durban</atitle><jtitle>Civil engineering (Johannesburg, South Africa)</jtitle><date>1990-06-01</date><risdate>1990</risdate><volume>32</volume><issue>6</issue><spage>243</spage><pages>243-</pages><issn>1021-2000</issn><abstract>The raft analysis and design, site investigation and choice of material parameters were descriptionbed, as well as the subsequent monitoring of its settlement performance. Levelling studs and a magnetic borehole extensometer were installed to monitor raft settlements and compression of particular soil horizons. The maximum settlement measured over five years to April 1988 was 36 mm. The key parameters in raft design were discussed. These included soil parameters, applied loading, contact pressure distribution, stress distribution with depth below the raft, relative raft stiffness and time-dependent settlement.</abstract><pub>South African Institution Of Civil Engineering (SAICE)</pub></addata></record> |
fulltext | fulltext |
identifier | ISSN: 1021-2000 |
ispartof | Civil engineering (Johannesburg, South Africa), 1990-06, Vol.32 (6), p.243 |
issn | 1021-2000 |
language | eng |
recordid | cdi_sabinet_saepub_10520_AJA10212019_15235 |
source | Sabinet African Journals Core Collection |
subjects | Estuarine deposits Raft Settlement |
title | The settlement performance of a raft supporting a 27-storey hotel on estuarine deposits in Durban |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-08T14%3A46%3A12IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-sabinet&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=The%20settlement%20performance%20of%20a%20raft%20supporting%20a%2027-storey%20hotel%20on%20estuarine%20deposits%20in%20Durban&rft.jtitle=Civil%20engineering%20(Johannesburg,%20South%20Africa)&rft.au=Plant,%20G.W.,%20Byrne,%20G.P.,%20Jaros,%20M.B.%20&%20McMillan,%20C.M.&rft.date=1990-06-01&rft.volume=32&rft.issue=6&rft.spage=243&rft.pages=243-&rft.issn=1021-2000&rft_id=info:doi/&rft_dat=%3Csabinet%3E10520/AJA10212019_15235%3C/sabinet%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rft_sabinet_id=10520/AJA10212019_15235&rfr_iscdi=true |