The raising and strengthening of the Steenbras dam

At a time when a serious water shortage confronted Cape Town, investigation revealed that the Steenbras Dam, the City's main source of water supply, required strengthening because of inadequate spillway capacity. Construction of a new 6,000,000 dam and pipeline had already been initiated, but i...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Civil engineering (Johannesburg, South Africa) South Africa), 1955-10, Vol.5 (10), p.327-351
1. Verfasser: Morris, S.S. & Garrett, W.S.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 351
container_issue 10
container_start_page 327
container_title Civil engineering (Johannesburg, South Africa)
container_volume 5
creator Morris, S.S. & Garrett, W.S.
description At a time when a serious water shortage confronted Cape Town, investigation revealed that the Steenbras Dam, the City's main source of water supply, required strengthening because of inadequate spillway capacity. Construction of a new 6,000,000 dam and pipeline had already been initiated, but immediate interim measures were essential to avoid the imposition of drastic water restrictions with consequent set back to the City's development.
format Article
fullrecord <record><control><sourceid>sabinet</sourceid><recordid>TN_cdi_sabinet_saepub_10520_AJA10212019_13992</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sabinet_id>10520/AJA10212019_13992</sabinet_id><sourcerecordid>10520/AJA10212019_13992</sourcerecordid><originalsourceid>FETCH-sabinet_saepub_10520_AJA10212019_139923</originalsourceid><addsrcrecordid>eNqVjU0KwjAQRrNQsP7cIRcIzEwp0mURRdzafZjSaRvRKJl4fy14AVff4_HgW5gCgdARAKzMWvUGgFThvjDUTmITBw1xtBx7qzlJHPMkcTbPwX7RXrNI7BKr7fmxNcuB7yq7326MOx3bw9kpdyFK9sryenceoSLwzaWZvwmw9ljWNZX_9h8TsDYH</addsrcrecordid><sourcetype>Publisher</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>The raising and strengthening of the Steenbras dam</title><source>Sabinet African Journals Core Collection</source><creator>Morris, S.S. &amp; Garrett, W.S.</creator><creatorcontrib>Morris, S.S. &amp; Garrett, W.S.</creatorcontrib><description>At a time when a serious water shortage confronted Cape Town, investigation revealed that the Steenbras Dam, the City's main source of water supply, required strengthening because of inadequate spillway capacity. Construction of a new 6,000,000 dam and pipeline had already been initiated, but immediate interim measures were essential to avoid the imposition of drastic water restrictions with consequent set back to the City's development.</description><identifier>ISSN: 1021-2000</identifier><language>eng</language><publisher>South African Institution Of Civil Engineering (SAICE)</publisher><subject>Cape Town ; Inadequate spillway capacity ; Serious water shortage ; Steenbras Dam</subject><ispartof>Civil engineering (Johannesburg, South Africa), 1955-10, Vol.5 (10), p.327-351</ispartof><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>315,781,785,39244</link.rule.ids></links><search><creatorcontrib>Morris, S.S. &amp; Garrett, W.S.</creatorcontrib><title>The raising and strengthening of the Steenbras dam</title><title>Civil engineering (Johannesburg, South Africa)</title><description>At a time when a serious water shortage confronted Cape Town, investigation revealed that the Steenbras Dam, the City's main source of water supply, required strengthening because of inadequate spillway capacity. Construction of a new 6,000,000 dam and pipeline had already been initiated, but immediate interim measures were essential to avoid the imposition of drastic water restrictions with consequent set back to the City's development.</description><subject>Cape Town</subject><subject>Inadequate spillway capacity</subject><subject>Serious water shortage</subject><subject>Steenbras Dam</subject><issn>1021-2000</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>1955</creationdate><recordtype>article</recordtype><sourceid/><recordid>eNqVjU0KwjAQRrNQsP7cIRcIzEwp0mURRdzafZjSaRvRKJl4fy14AVff4_HgW5gCgdARAKzMWvUGgFThvjDUTmITBw1xtBx7qzlJHPMkcTbPwX7RXrNI7BKr7fmxNcuB7yq7326MOx3bw9kpdyFK9sryenceoSLwzaWZvwmw9ljWNZX_9h8TsDYH</recordid><startdate>19551001</startdate><enddate>19551001</enddate><creator>Morris, S.S. &amp; Garrett, W.S.</creator><general>South African Institution Of Civil Engineering (SAICE)</general><scope/></search><sort><creationdate>19551001</creationdate><title>The raising and strengthening of the Steenbras dam</title><author>Morris, S.S. &amp; Garrett, W.S.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-sabinet_saepub_10520_AJA10212019_139923</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>1955</creationdate><topic>Cape Town</topic><topic>Inadequate spillway capacity</topic><topic>Serious water shortage</topic><topic>Steenbras Dam</topic><toplevel>online_resources</toplevel><creatorcontrib>Morris, S.S. &amp; Garrett, W.S.</creatorcontrib><jtitle>Civil engineering (Johannesburg, South Africa)</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Morris, S.S. &amp; Garrett, W.S.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>The raising and strengthening of the Steenbras dam</atitle><jtitle>Civil engineering (Johannesburg, South Africa)</jtitle><date>1955-10-01</date><risdate>1955</risdate><volume>5</volume><issue>10</issue><spage>327</spage><epage>351</epage><pages>327-351</pages><issn>1021-2000</issn><abstract>At a time when a serious water shortage confronted Cape Town, investigation revealed that the Steenbras Dam, the City's main source of water supply, required strengthening because of inadequate spillway capacity. Construction of a new 6,000,000 dam and pipeline had already been initiated, but immediate interim measures were essential to avoid the imposition of drastic water restrictions with consequent set back to the City's development.</abstract><pub>South African Institution Of Civil Engineering (SAICE)</pub></addata></record>
fulltext fulltext
identifier ISSN: 1021-2000
ispartof Civil engineering (Johannesburg, South Africa), 1955-10, Vol.5 (10), p.327-351
issn 1021-2000
language eng
recordid cdi_sabinet_saepub_10520_AJA10212019_13992
source Sabinet African Journals Core Collection
subjects Cape Town
Inadequate spillway capacity
Serious water shortage
Steenbras Dam
title The raising and strengthening of the Steenbras dam
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-14T19%3A33%3A56IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-sabinet&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=The%20raising%20and%20strengthening%20of%20the%20Steenbras%20dam&rft.jtitle=Civil%20engineering%20(Johannesburg,%20South%20Africa)&rft.au=Morris,%20S.S.%20&%20Garrett,%20W.S.&rft.date=1955-10-01&rft.volume=5&rft.issue=10&rft.spage=327&rft.epage=351&rft.pages=327-351&rft.issn=1021-2000&rft_id=info:doi/&rft_dat=%3Csabinet%3E10520/AJA10212019_13992%3C/sabinet%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rft_sabinet_id=10520/AJA10212019_13992&rfr_iscdi=true