The raising and strengthening of the Steenbras dam
At a time when a serious water shortage confronted Cape Town, investigation revealed that the Steenbras Dam, the City's main source of water supply, required strengthening because of inadequate spillway capacity. Construction of a new 6,000,000 dam and pipeline had already been initiated, but i...
Gespeichert in:
Veröffentlicht in: | Civil engineering (Johannesburg, South Africa) South Africa), 1955-10, Vol.5 (10), p.327-351 |
---|---|
1. Verfasser: | |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 351 |
---|---|
container_issue | 10 |
container_start_page | 327 |
container_title | Civil engineering (Johannesburg, South Africa) |
container_volume | 5 |
creator | Morris, S.S. & Garrett, W.S. |
description | At a time when a serious water shortage confronted Cape Town, investigation revealed that the Steenbras Dam, the City's main source of water supply, required strengthening because of inadequate spillway capacity. Construction of a new 6,000,000 dam and pipeline had already been initiated, but immediate interim measures were essential to avoid the imposition of drastic water restrictions with consequent set back to the City's development. |
format | Article |
fullrecord | <record><control><sourceid>sabinet</sourceid><recordid>TN_cdi_sabinet_saepub_10520_AJA10212019_13992</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sabinet_id>10520/AJA10212019_13992</sabinet_id><sourcerecordid>10520/AJA10212019_13992</sourcerecordid><originalsourceid>FETCH-sabinet_saepub_10520_AJA10212019_139923</originalsourceid><addsrcrecordid>eNqVjU0KwjAQRrNQsP7cIRcIzEwp0mURRdzafZjSaRvRKJl4fy14AVff4_HgW5gCgdARAKzMWvUGgFThvjDUTmITBw1xtBx7qzlJHPMkcTbPwX7RXrNI7BKr7fmxNcuB7yq7326MOx3bw9kpdyFK9sryenceoSLwzaWZvwmw9ljWNZX_9h8TsDYH</addsrcrecordid><sourcetype>Publisher</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>The raising and strengthening of the Steenbras dam</title><source>Sabinet African Journals Core Collection</source><creator>Morris, S.S. & Garrett, W.S.</creator><creatorcontrib>Morris, S.S. & Garrett, W.S.</creatorcontrib><description>At a time when a serious water shortage confronted Cape Town, investigation revealed that the Steenbras Dam, the City's main source of water supply, required strengthening because of inadequate spillway capacity. Construction of a new 6,000,000 dam and pipeline had already been initiated, but immediate interim measures were essential to avoid the imposition of drastic water restrictions with consequent set back to the City's development.</description><identifier>ISSN: 1021-2000</identifier><language>eng</language><publisher>South African Institution Of Civil Engineering (SAICE)</publisher><subject>Cape Town ; Inadequate spillway capacity ; Serious water shortage ; Steenbras Dam</subject><ispartof>Civil engineering (Johannesburg, South Africa), 1955-10, Vol.5 (10), p.327-351</ispartof><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>315,781,785,39244</link.rule.ids></links><search><creatorcontrib>Morris, S.S. & Garrett, W.S.</creatorcontrib><title>The raising and strengthening of the Steenbras dam</title><title>Civil engineering (Johannesburg, South Africa)</title><description>At a time when a serious water shortage confronted Cape Town, investigation revealed that the Steenbras Dam, the City's main source of water supply, required strengthening because of inadequate spillway capacity. Construction of a new 6,000,000 dam and pipeline had already been initiated, but immediate interim measures were essential to avoid the imposition of drastic water restrictions with consequent set back to the City's development.</description><subject>Cape Town</subject><subject>Inadequate spillway capacity</subject><subject>Serious water shortage</subject><subject>Steenbras Dam</subject><issn>1021-2000</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>1955</creationdate><recordtype>article</recordtype><sourceid/><recordid>eNqVjU0KwjAQRrNQsP7cIRcIzEwp0mURRdzafZjSaRvRKJl4fy14AVff4_HgW5gCgdARAKzMWvUGgFThvjDUTmITBw1xtBx7qzlJHPMkcTbPwX7RXrNI7BKr7fmxNcuB7yq7326MOx3bw9kpdyFK9sryenceoSLwzaWZvwmw9ljWNZX_9h8TsDYH</recordid><startdate>19551001</startdate><enddate>19551001</enddate><creator>Morris, S.S. & Garrett, W.S.</creator><general>South African Institution Of Civil Engineering (SAICE)</general><scope/></search><sort><creationdate>19551001</creationdate><title>The raising and strengthening of the Steenbras dam</title><author>Morris, S.S. & Garrett, W.S.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-sabinet_saepub_10520_AJA10212019_139923</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>1955</creationdate><topic>Cape Town</topic><topic>Inadequate spillway capacity</topic><topic>Serious water shortage</topic><topic>Steenbras Dam</topic><toplevel>online_resources</toplevel><creatorcontrib>Morris, S.S. & Garrett, W.S.</creatorcontrib><jtitle>Civil engineering (Johannesburg, South Africa)</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Morris, S.S. & Garrett, W.S.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>The raising and strengthening of the Steenbras dam</atitle><jtitle>Civil engineering (Johannesburg, South Africa)</jtitle><date>1955-10-01</date><risdate>1955</risdate><volume>5</volume><issue>10</issue><spage>327</spage><epage>351</epage><pages>327-351</pages><issn>1021-2000</issn><abstract>At a time when a serious water shortage confronted Cape Town, investigation revealed that the Steenbras Dam, the City's main source of water supply, required strengthening because of inadequate spillway capacity. Construction of a new 6,000,000 dam and pipeline had already been initiated, but immediate interim measures were essential to avoid the imposition of drastic water restrictions with consequent set back to the City's development.</abstract><pub>South African Institution Of Civil Engineering (SAICE)</pub></addata></record> |
fulltext | fulltext |
identifier | ISSN: 1021-2000 |
ispartof | Civil engineering (Johannesburg, South Africa), 1955-10, Vol.5 (10), p.327-351 |
issn | 1021-2000 |
language | eng |
recordid | cdi_sabinet_saepub_10520_AJA10212019_13992 |
source | Sabinet African Journals Core Collection |
subjects | Cape Town Inadequate spillway capacity Serious water shortage Steenbras Dam |
title | The raising and strengthening of the Steenbras dam |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-14T19%3A33%3A56IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-sabinet&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=The%20raising%20and%20strengthening%20of%20the%20Steenbras%20dam&rft.jtitle=Civil%20engineering%20(Johannesburg,%20South%20Africa)&rft.au=Morris,%20S.S.%20&%20Garrett,%20W.S.&rft.date=1955-10-01&rft.volume=5&rft.issue=10&rft.spage=327&rft.epage=351&rft.pages=327-351&rft.issn=1021-2000&rft_id=info:doi/&rft_dat=%3Csabinet%3E10520/AJA10212019_13992%3C/sabinet%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rft_sabinet_id=10520/AJA10212019_13992&rfr_iscdi=true |