The raising and strengthening of the Steenbras dam
At a time when a serious water shortage confronted Cape Town, investigation revealed that the Steenbras Dam, the City's main source of water supply, required strengthening because of inadequate spillway capacity. Construction of a new 6,000,000 dam and pipeline had already been initiated, but i...
Gespeichert in:
Veröffentlicht in: | Civil engineering (Johannesburg, South Africa) South Africa), 1955-10, Vol.5 (10), p.327-351 |
---|---|
1. Verfasser: | |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | At a time when a serious water shortage confronted Cape Town, investigation revealed that the Steenbras Dam, the City's main source of water supply, required strengthening because of inadequate spillway capacity. Construction of a new 6,000,000 dam and pipeline had already been initiated, but immediate interim measures were essential to avoid the imposition of drastic water restrictions with consequent set back to the City's development. |
---|---|
ISSN: | 1021-2000 |