Heroes of the Gulf
The sandbagging operation, started on May 13, repaired gaps in the barrier island caused by coastal erosion by dropping large sandbags, ranging from 2,000 to 4,000 pounds each, from helicopters and should mitigate the approaching oil. The Louisiana Guard also completed the construction of an almost...
Gespeichert in:
Veröffentlicht in: | National Guard 2010-07, Vol.64 (7), p.40 |
---|---|
1. Verfasser: | |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The sandbagging operation, started on May 13, repaired gaps in the barrier island caused by coastal erosion by dropping large sandbags, ranging from 2,000 to 4,000 pounds each, from helicopters and should mitigate the approaching oil. The Louisiana Guard also completed the construction of an almost six-mile long Tiger Dam shoreline protection system near Venice, La., in the Southwest Pass of the Mississippi River Delta. |
---|---|
ISSN: | 0163-3945 |