Planning and constructing a hybrid operating room: Lessons learned
Case Study: Kootenai Health Surgery Renovation The multi-phase surgery renovation for Kootenai Health updated every square foot of the surgery department, including eight traditional operating rooms and one hybrid operating room. A hybrid OR is required to be 1.5x as large, with a minimum clear floo...
Gespeichert in:
Veröffentlicht in: | Building Design & Construction 2018-12 |
---|---|
1. Verfasser: | |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | Building Design & Construction |
container_volume | |
creator | Dan Kurtz, AIA, LEED AP |
description | Case Study: Kootenai Health Surgery Renovation The multi-phase surgery renovation for Kootenai Health updated every square foot of the surgery department, including eight traditional operating rooms and one hybrid operating room. A hybrid OR is required to be 1.5x as large, with a minimum clear floor area of 600 square feet. Because hybrid ORs require additional space for equipment and to provide flexibility for the types of procedures performed, these rooms typically average more than 1,000 square feet. Key Technologies Needed in Hybrid ORs Include: Fixed angiographic imaging system Heart-lung bypass machine Hybrid operating table Physiologic / hemodynamic monitor Wall- and boom-mounted video display monitors Contrast injector Surgical and interventional lighting Transthoracic and intravascular echo Anesthesia machine Surgical carts and storage systems Functionality is Key. |
format | Article |
fullrecord | <record><control><sourceid>proquest</sourceid><recordid>TN_cdi_proquest_reports_2151796495</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2151796495</sourcerecordid><originalsourceid>FETCH-proquest_reports_21517964953</originalsourceid><addsrcrecordid>eNpjYeA0MDAw1zU2MTDnYOAqLs4yMDA0MjIz42RwCshJzMvLzEtXSMxLUUjOzysuKSpNLgELKGRUJhVlpijkF6QWJYKFivLzc60UfFKLi4EKFXJSE4vyUlN4GFjTEnOKU3mhNDeDkptriLOHbkFRfmFpanFJfFFqQX5RSXG8kaGpobmlmYmlqTFRigDtyTi5</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2151796495</pqid></control><display><type>article</type><title>Planning and constructing a hybrid operating room: Lessons learned</title><source>EZB Electronic Journals Library</source><creator>Dan Kurtz, AIA, LEED AP</creator><creatorcontrib>Dan Kurtz, AIA, LEED AP</creatorcontrib><description>Case Study: Kootenai Health Surgery Renovation The multi-phase surgery renovation for Kootenai Health updated every square foot of the surgery department, including eight traditional operating rooms and one hybrid operating room. A hybrid OR is required to be 1.5x as large, with a minimum clear floor area of 600 square feet. Because hybrid ORs require additional space for equipment and to provide flexibility for the types of procedures performed, these rooms typically average more than 1,000 square feet. Key Technologies Needed in Hybrid ORs Include: Fixed angiographic imaging system Heart-lung bypass machine Hybrid operating table Physiologic / hemodynamic monitor Wall- and boom-mounted video display monitors Contrast injector Surgical and interventional lighting Transthoracic and intravascular echo Anesthesia machine Surgical carts and storage systems Functionality is Key.</description><identifier>ISSN: 0007-3407</identifier><language>eng</language><publisher>Arlington Heights: SGC Horizon Building & Construction Group</publisher><subject>Anesthesia ; Carts ; Case studies ; Construction planning ; Feet ; Hemodynamics ; Hybrid systems ; Lighting ; Recovery (Medical) ; Storage systems ; Surgery</subject><ispartof>Building Design & Construction, 2018-12</ispartof><rights>Copyright SGC Horizon Building & Construction Group Dec 7, 2018</rights><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>312,777,781,788</link.rule.ids></links><search><creatorcontrib>Dan Kurtz, AIA, LEED AP</creatorcontrib><title>Planning and constructing a hybrid operating room: Lessons learned</title><title>Building Design & Construction</title><description>Case Study: Kootenai Health Surgery Renovation The multi-phase surgery renovation for Kootenai Health updated every square foot of the surgery department, including eight traditional operating rooms and one hybrid operating room. A hybrid OR is required to be 1.5x as large, with a minimum clear floor area of 600 square feet. Because hybrid ORs require additional space for equipment and to provide flexibility for the types of procedures performed, these rooms typically average more than 1,000 square feet. Key Technologies Needed in Hybrid ORs Include: Fixed angiographic imaging system Heart-lung bypass machine Hybrid operating table Physiologic / hemodynamic monitor Wall- and boom-mounted video display monitors Contrast injector Surgical and interventional lighting Transthoracic and intravascular echo Anesthesia machine Surgical carts and storage systems Functionality is Key.</description><subject>Anesthesia</subject><subject>Carts</subject><subject>Case studies</subject><subject>Construction planning</subject><subject>Feet</subject><subject>Hemodynamics</subject><subject>Hybrid systems</subject><subject>Lighting</subject><subject>Recovery (Medical)</subject><subject>Storage systems</subject><subject>Surgery</subject><issn>0007-3407</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2018</creationdate><recordtype>article</recordtype><sourceid>8G5</sourceid><sourceid>ABUWG</sourceid><sourceid>AFKRA</sourceid><sourceid>AZQEC</sourceid><sourceid>BENPR</sourceid><sourceid>CCPQU</sourceid><sourceid>DWQXO</sourceid><sourceid>GNUQQ</sourceid><sourceid>GUQSH</sourceid><sourceid>M2O</sourceid><recordid>eNpjYeA0MDAw1zU2MTDnYOAqLs4yMDA0MjIz42RwCshJzMvLzEtXSMxLUUjOzysuKSpNLgELKGRUJhVlpijkF6QWJYKFivLzc60UfFKLi4EKFXJSE4vyUlN4GFjTEnOKU3mhNDeDkptriLOHbkFRfmFpanFJfFFqQX5RSXG8kaGpobmlmYmlqTFRigDtyTi5</recordid><startdate>20181207</startdate><enddate>20181207</enddate><creator>Dan Kurtz, AIA, LEED AP</creator><general>SGC Horizon Building & Construction Group</general><scope>0U~</scope><scope>1-H</scope><scope>3V.</scope><scope>7RQ</scope><scope>7WY</scope><scope>7WZ</scope><scope>7XB</scope><scope>87Z</scope><scope>883</scope><scope>88F</scope><scope>88I</scope><scope>8FE</scope><scope>8FG</scope><scope>8FK</scope><scope>8FL</scope><scope>8G5</scope><scope>ABJCF</scope><scope>ABUWG</scope><scope>AEUYN</scope><scope>AFKRA</scope><scope>AZQEC</scope><scope>BENPR</scope><scope>BEZIV</scope><scope>BGLVJ</scope><scope>CCPQU</scope><scope>DWQXO</scope><scope>FRNLG</scope><scope>F~G</scope><scope>GNUQQ</scope><scope>GUQSH</scope><scope>HCIFZ</scope><scope>K60</scope><scope>K6~</scope><scope>L.-</scope><scope>L.0</scope><scope>L6V</scope><scope>M0C</scope><scope>M0F</scope><scope>M1Q</scope><scope>M2O</scope><scope>M2P</scope><scope>M7S</scope><scope>MBDVC</scope><scope>PQBIZ</scope><scope>PQBZA</scope><scope>PQEST</scope><scope>PQQKQ</scope><scope>PQUKI</scope><scope>PTHSS</scope><scope>Q9U</scope><scope>U9A</scope></search><sort><creationdate>20181207</creationdate><title>Planning and constructing a hybrid operating room: Lessons learned</title><author>Dan Kurtz, AIA, LEED AP</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-proquest_reports_21517964953</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2018</creationdate><topic>Anesthesia</topic><topic>Carts</topic><topic>Case studies</topic><topic>Construction planning</topic><topic>Feet</topic><topic>Hemodynamics</topic><topic>Hybrid systems</topic><topic>Lighting</topic><topic>Recovery (Medical)</topic><topic>Storage systems</topic><topic>Surgery</topic><toplevel>online_resources</toplevel><creatorcontrib>Dan Kurtz, AIA, LEED AP</creatorcontrib><collection>Global News & ABI/Inform Professional</collection><collection>Trade PRO</collection><collection>ProQuest Central (Corporate)</collection><collection>ProQuest Career & Technical Education Database</collection><collection>ABI/INFORM Collection</collection><collection>ABI/INFORM Global (PDF only)</collection><collection>ProQuest Central (purchase pre-March 2016)</collection><collection>ABI/INFORM Collection</collection><collection>ABI/INFORM Collection</collection><collection>Military Database (Alumni Edition)</collection><collection>Science Database (Alumni Edition)</collection><collection>ProQuest SciTech Collection</collection><collection>ProQuest Technology Collection</collection><collection>ProQuest Central (Alumni) (purchase pre-March 2016)</collection><collection>ABI/INFORM Collection (Alumni Edition)</collection><collection>Research Library (Alumni Edition)</collection><collection>Materials Science & Engineering Collection</collection><collection>ProQuest Central (Alumni)</collection><collection>ProQuest One Sustainability</collection><collection>ProQuest Central</collection><collection>ProQuest Central Essentials</collection><collection>ProQuest Central</collection><collection>ProQuest Business Premium Collection</collection><collection>Technology Collection</collection><collection>ProQuest One Community College</collection><collection>ProQuest Central Korea</collection><collection>Business Premium Collection (Alumni)</collection><collection>ABI/INFORM Global (Corporate)</collection><collection>ProQuest Central Student</collection><collection>Research Library Prep</collection><collection>SciTech Premium Collection (Proquest) (PQ_SDU_P3)</collection><collection>ProQuest Business Collection (Alumni Edition)</collection><collection>ProQuest Business Collection</collection><collection>ABI/INFORM Professional Advanced</collection><collection>ABI/INFORM Professional Standard</collection><collection>ProQuest Engineering Collection</collection><collection>ABI/INFORM global</collection><collection>ABI/INFORM trade & industry</collection><collection>Military Database (Proquest) (PQ_SDU_P3)</collection><collection>ProQuest research library</collection><collection>ProQuest Science Journals</collection><collection>Engineering Database</collection><collection>Research Library (Corporate)</collection><collection>One Business (ProQuest)</collection><collection>ProQuest One Business (Alumni)</collection><collection>ProQuest One Academic Eastern Edition (DO NOT USE)</collection><collection>ProQuest One Academic</collection><collection>ProQuest One Academic UKI Edition</collection><collection>Engineering collection</collection><collection>ProQuest Central Basic</collection><jtitle>Building Design & Construction</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Dan Kurtz, AIA, LEED AP</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Planning and constructing a hybrid operating room: Lessons learned</atitle><jtitle>Building Design & Construction</jtitle><date>2018-12-07</date><risdate>2018</risdate><issn>0007-3407</issn><abstract>Case Study: Kootenai Health Surgery Renovation The multi-phase surgery renovation for Kootenai Health updated every square foot of the surgery department, including eight traditional operating rooms and one hybrid operating room. A hybrid OR is required to be 1.5x as large, with a minimum clear floor area of 600 square feet. Because hybrid ORs require additional space for equipment and to provide flexibility for the types of procedures performed, these rooms typically average more than 1,000 square feet. Key Technologies Needed in Hybrid ORs Include: Fixed angiographic imaging system Heart-lung bypass machine Hybrid operating table Physiologic / hemodynamic monitor Wall- and boom-mounted video display monitors Contrast injector Surgical and interventional lighting Transthoracic and intravascular echo Anesthesia machine Surgical carts and storage systems Functionality is Key.</abstract><cop>Arlington Heights</cop><pub>SGC Horizon Building & Construction Group</pub></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0007-3407 |
ispartof | Building Design & Construction, 2018-12 |
issn | 0007-3407 |
language | eng |
recordid | cdi_proquest_reports_2151796495 |
source | EZB Electronic Journals Library |
subjects | Anesthesia Carts Case studies Construction planning Feet Hemodynamics Hybrid systems Lighting Recovery (Medical) Storage systems Surgery |
title | Planning and constructing a hybrid operating room: Lessons learned |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-17T14%3A38%3A50IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Planning%20and%20constructing%20a%20hybrid%20operating%20room:%20Lessons%20learned&rft.jtitle=Building%20Design%20&%20Construction&rft.au=Dan%20Kurtz,%20AIA,%20LEED%20AP&rft.date=2018-12-07&rft.issn=0007-3407&rft_id=info:doi/&rft_dat=%3Cproquest%3E2151796495%3C/proquest%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2151796495&rft_id=info:pmid/&rfr_iscdi=true |