Panama Canal: full tilt in the tropics
The high design standards were necessary to reduce the risk of having to close the locks in order to undertake repairs to the superstructure. "At the existing locks we have two lanes of traffic, which permits outages for maintenance without closing the entire canal," says ACP design manage...
Gespeichert in:
Veröffentlicht in: | Civil Engineering : Magazine of the South African Institution of Civil Engineering 2013-01, Vol.21 (1), p.48-51 |
---|---|
1. Verfasser: | |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The high design standards were necessary to reduce the risk of having to close the locks in order to undertake repairs to the superstructure. "At the existing locks we have two lanes of traffic, which permits outages for maintenance without closing the entire canal," says ACP design manager Cheryl George. "The new locks will only have one lane. Any closure of either of the locks would put the post-Panamax system out of service." |
---|---|
ISSN: | 1021-2000 |