Feasibility study of 5 MW superconducting wind turbine generator
The feasibility of installing a direct drive superconducting generator in the 5 MW reference offshore wind turbine of the National Renewable Energy Laboratory (NREL) has been examined. The engineering current densities J sub(e) obtained in a series of race track coils have been combined with magneti...
Gespeichert in:
Veröffentlicht in: | Physica. C, Superconductivity Superconductivity, 2011-11, Vol.471 (21-22), p.1464-1469 |
---|---|
Hauptverfasser: | , , , , , , |
Format: | Artikel |
Sprache: | eng |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!