Ergonomics Program Management in Tucuruí Hydropower Plant using TPM Methodology

This paper aims to present the benefits achieved in the ergonomics process management with the use of the TPM methodology (Total Productive Maintenance) in Tucuruí Hydropower Plant. The methodology is aligned with the corporate guidelines, moreover with the Strategic Planning of the company, it is r...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Work (Reading, Mass.) Mass.), 2012, Vol.41 (S1), p.2822-2830
Hauptverfasser: Santos, R.M., Sassi, A.C., Sá, B.M., Miguez, S.A., Pardauil, A.A.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 2830
container_issue S1
container_start_page 2822
container_title Work (Reading, Mass.)
container_volume 41
creator Santos, R.M.
Sassi, A.C.
Sá, B.M.
Miguez, S.A.
Pardauil, A.A.
description This paper aims to present the benefits achieved in the ergonomics process management with the use of the TPM methodology (Total Productive Maintenance) in Tucuruí Hydropower Plant. The methodology is aligned with the corporate guidelines, moreover with the Strategic Planning of the company, it is represented in the TPM Pillars including the Health Pillar in which is inserted the ergonomics process. The results of the ergonomic actions demonstrated a 12% reduction over the absenteeism rate due to musculoskeletal disorders, solving 77,0% of ergonomic non-conformities, what favored the rise of the Organizational Climate in 44,8%, impacting on the overall performance of the company. Awards confirmed the success of the work by the achievement of the Award for TPM Excellence in 2001, Award for Excellence in Consistent TPM Commitment in 2009 and more recently the Special Award for TPM Achievement, 2010. The determination of the high rank administration and workers, allied with the involvement/dynamism of Pillars, has assured the success of this management practice in Tucuruí Hydropower Plant.
doi_str_mv 10.3233/WOR-2012-0530-2822
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_miscellaneous_921143238</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sage_id>10.3233_WOR-2012-0530-2822</sage_id><sourcerecordid>921143238</sourcerecordid><originalsourceid>FETCH-LOGICAL-c386t-cf03513dbe16f0dfe26fe5ae0ec6936c4d8607b542f2c32340b63f1cea4f61223</originalsourceid><addsrcrecordid>eNp9kE1OwzAQhS0EoqVwARYoO1am_kmcZIkqoEitGqEilpbj2CFVEhe7FuqhOAUXw1ELS1Yz0rz3NO8D4BqjO0oonb6tXiBBmECUUARJRsgJGOMsTWBOUnQadpRgmGc4GYEL5zYIIUJQfg5GhFCc4jgdg-LB1qY3XSNdVFhTW9FFS9GLWnWq30VNH6299NZ_f0XzfWXN1nwqGxWtCEfvmr6O1sUyWqrdu6lMa-r9JTjTonXq6jgn4PXxYT2bw8Xq6Xl2v4CSZmwHpUY0wbQqFWYaVVoRplUiFFKS5ZTJuMoYSsskJprI0DZGJaMaSyVizXD4fwJuD7lbaz68cjveNU6qNnymjHc8JxjHwZgFJTkopTXOWaX51jadsHuOER9A8gCSDyD5AJIPIIPp5hjvy05Vf5ZfckEwPQhcYMU3xts-1P0v8gflkX2m</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>921143238</pqid></control><display><type>article</type><title>Ergonomics Program Management in Tucuruí Hydropower Plant using TPM Methodology</title><source>MEDLINE</source><source>Business Source Complete (EB_SDU_P3)</source><creator>Santos, R.M. ; Sassi, A.C. ; Sá, B.M. ; Miguez, S.A. ; Pardauil, A.A.</creator><creatorcontrib>Santos, R.M. ; Sassi, A.C. ; Sá, B.M. ; Miguez, S.A. ; Pardauil, A.A.</creatorcontrib><description>This paper aims to present the benefits achieved in the ergonomics process management with the use of the TPM methodology (Total Productive Maintenance) in Tucuruí Hydropower Plant. The methodology is aligned with the corporate guidelines, moreover with the Strategic Planning of the company, it is represented in the TPM Pillars including the Health Pillar in which is inserted the ergonomics process. The results of the ergonomic actions demonstrated a 12% reduction over the absenteeism rate due to musculoskeletal disorders, solving 77,0% of ergonomic non-conformities, what favored the rise of the Organizational Climate in 44,8%, impacting on the overall performance of the company. Awards confirmed the success of the work by the achievement of the Award for TPM Excellence in 2001, Award for Excellence in Consistent TPM Commitment in 2009 and more recently the Special Award for TPM Achievement, 2010. The determination of the high rank administration and workers, allied with the involvement/dynamism of Pillars, has assured the success of this management practice in Tucuruí Hydropower Plant.</description><identifier>ISSN: 1051-9815</identifier><identifier>EISSN: 1875-9270</identifier><identifier>DOI: 10.3233/WOR-2012-0530-2822</identifier><identifier>PMID: 22317147</identifier><language>eng</language><publisher>London, England: SAGE Publications</publisher><subject>Brazil ; Ergonomics - methods ; Humans ; Occupational Health ; Organizational Culture ; Organizational Objectives ; Organizational Policy ; Power Plants</subject><ispartof>Work (Reading, Mass.), 2012, Vol.41 (S1), p.2822-2830</ispartof><rights>IOS Press and the authors. All rights reserved</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c386t-cf03513dbe16f0dfe26fe5ae0ec6936c4d8607b542f2c32340b63f1cea4f61223</citedby></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,4014,27914,27915,27916</link.rule.ids><backlink>$$Uhttps://www.ncbi.nlm.nih.gov/pubmed/22317147$$D View this record in MEDLINE/PubMed$$Hfree_for_read</backlink></links><search><creatorcontrib>Santos, R.M.</creatorcontrib><creatorcontrib>Sassi, A.C.</creatorcontrib><creatorcontrib>Sá, B.M.</creatorcontrib><creatorcontrib>Miguez, S.A.</creatorcontrib><creatorcontrib>Pardauil, A.A.</creatorcontrib><title>Ergonomics Program Management in Tucuruí Hydropower Plant using TPM Methodology</title><title>Work (Reading, Mass.)</title><addtitle>Work</addtitle><description>This paper aims to present the benefits achieved in the ergonomics process management with the use of the TPM methodology (Total Productive Maintenance) in Tucuruí Hydropower Plant. The methodology is aligned with the corporate guidelines, moreover with the Strategic Planning of the company, it is represented in the TPM Pillars including the Health Pillar in which is inserted the ergonomics process. The results of the ergonomic actions demonstrated a 12% reduction over the absenteeism rate due to musculoskeletal disorders, solving 77,0% of ergonomic non-conformities, what favored the rise of the Organizational Climate in 44,8%, impacting on the overall performance of the company. Awards confirmed the success of the work by the achievement of the Award for TPM Excellence in 2001, Award for Excellence in Consistent TPM Commitment in 2009 and more recently the Special Award for TPM Achievement, 2010. The determination of the high rank administration and workers, allied with the involvement/dynamism of Pillars, has assured the success of this management practice in Tucuruí Hydropower Plant.</description><subject>Brazil</subject><subject>Ergonomics - methods</subject><subject>Humans</subject><subject>Occupational Health</subject><subject>Organizational Culture</subject><subject>Organizational Objectives</subject><subject>Organizational Policy</subject><subject>Power Plants</subject><issn>1051-9815</issn><issn>1875-9270</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2012</creationdate><recordtype>article</recordtype><sourceid>EIF</sourceid><recordid>eNp9kE1OwzAQhS0EoqVwARYoO1am_kmcZIkqoEitGqEilpbj2CFVEhe7FuqhOAUXw1ELS1Yz0rz3NO8D4BqjO0oonb6tXiBBmECUUARJRsgJGOMsTWBOUnQadpRgmGc4GYEL5zYIIUJQfg5GhFCc4jgdg-LB1qY3XSNdVFhTW9FFS9GLWnWq30VNH6299NZ_f0XzfWXN1nwqGxWtCEfvmr6O1sUyWqrdu6lMa-r9JTjTonXq6jgn4PXxYT2bw8Xq6Xl2v4CSZmwHpUY0wbQqFWYaVVoRplUiFFKS5ZTJuMoYSsskJprI0DZGJaMaSyVizXD4fwJuD7lbaz68cjveNU6qNnymjHc8JxjHwZgFJTkopTXOWaX51jadsHuOER9A8gCSDyD5AJIPIIPp5hjvy05Vf5ZfckEwPQhcYMU3xts-1P0v8gflkX2m</recordid><startdate>2012</startdate><enddate>2012</enddate><creator>Santos, R.M.</creator><creator>Sassi, A.C.</creator><creator>Sá, B.M.</creator><creator>Miguez, S.A.</creator><creator>Pardauil, A.A.</creator><general>SAGE Publications</general><scope>CGR</scope><scope>CUY</scope><scope>CVF</scope><scope>ECM</scope><scope>EIF</scope><scope>NPM</scope><scope>AAYXX</scope><scope>CITATION</scope><scope>7X8</scope></search><sort><creationdate>2012</creationdate><title>Ergonomics Program Management in Tucuruí Hydropower Plant using TPM Methodology</title><author>Santos, R.M. ; Sassi, A.C. ; Sá, B.M. ; Miguez, S.A. ; Pardauil, A.A.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c386t-cf03513dbe16f0dfe26fe5ae0ec6936c4d8607b542f2c32340b63f1cea4f61223</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2012</creationdate><topic>Brazil</topic><topic>Ergonomics - methods</topic><topic>Humans</topic><topic>Occupational Health</topic><topic>Organizational Culture</topic><topic>Organizational Objectives</topic><topic>Organizational Policy</topic><topic>Power Plants</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Santos, R.M.</creatorcontrib><creatorcontrib>Sassi, A.C.</creatorcontrib><creatorcontrib>Sá, B.M.</creatorcontrib><creatorcontrib>Miguez, S.A.</creatorcontrib><creatorcontrib>Pardauil, A.A.</creatorcontrib><collection>Medline</collection><collection>MEDLINE</collection><collection>MEDLINE (Ovid)</collection><collection>MEDLINE</collection><collection>MEDLINE</collection><collection>PubMed</collection><collection>CrossRef</collection><collection>MEDLINE - Academic</collection><jtitle>Work (Reading, Mass.)</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Santos, R.M.</au><au>Sassi, A.C.</au><au>Sá, B.M.</au><au>Miguez, S.A.</au><au>Pardauil, A.A.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Ergonomics Program Management in Tucuruí Hydropower Plant using TPM Methodology</atitle><jtitle>Work (Reading, Mass.)</jtitle><addtitle>Work</addtitle><date>2012</date><risdate>2012</risdate><volume>41</volume><issue>S1</issue><spage>2822</spage><epage>2830</epage><pages>2822-2830</pages><issn>1051-9815</issn><eissn>1875-9270</eissn><abstract>This paper aims to present the benefits achieved in the ergonomics process management with the use of the TPM methodology (Total Productive Maintenance) in Tucuruí Hydropower Plant. The methodology is aligned with the corporate guidelines, moreover with the Strategic Planning of the company, it is represented in the TPM Pillars including the Health Pillar in which is inserted the ergonomics process. The results of the ergonomic actions demonstrated a 12% reduction over the absenteeism rate due to musculoskeletal disorders, solving 77,0% of ergonomic non-conformities, what favored the rise of the Organizational Climate in 44,8%, impacting on the overall performance of the company. Awards confirmed the success of the work by the achievement of the Award for TPM Excellence in 2001, Award for Excellence in Consistent TPM Commitment in 2009 and more recently the Special Award for TPM Achievement, 2010. The determination of the high rank administration and workers, allied with the involvement/dynamism of Pillars, has assured the success of this management practice in Tucuruí Hydropower Plant.</abstract><cop>London, England</cop><pub>SAGE Publications</pub><pmid>22317147</pmid><doi>10.3233/WOR-2012-0530-2822</doi><tpages>9</tpages><oa>free_for_read</oa></addata></record>
fulltext fulltext
identifier ISSN: 1051-9815
ispartof Work (Reading, Mass.), 2012, Vol.41 (S1), p.2822-2830
issn 1051-9815
1875-9270
language eng
recordid cdi_proquest_miscellaneous_921143238
source MEDLINE; Business Source Complete (EB_SDU_P3)
subjects Brazil
Ergonomics - methods
Humans
Occupational Health
Organizational Culture
Organizational Objectives
Organizational Policy
Power Plants
title Ergonomics Program Management in Tucuruí Hydropower Plant using TPM Methodology
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-14T19%3A56%3A04IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Ergonomics%20Program%20Management%20in%20Tucuru%C3%AD%20Hydropower%20Plant%20using%20TPM%20Methodology&rft.jtitle=Work%20(Reading,%20Mass.)&rft.au=Santos,%20R.M.&rft.date=2012&rft.volume=41&rft.issue=S1&rft.spage=2822&rft.epage=2830&rft.pages=2822-2830&rft.issn=1051-9815&rft.eissn=1875-9270&rft_id=info:doi/10.3233/WOR-2012-0530-2822&rft_dat=%3Cproquest_cross%3E921143238%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=921143238&rft_id=info:pmid/22317147&rft_sage_id=10.3233_WOR-2012-0530-2822&rfr_iscdi=true