Ultrasonic measurement of gap between calandria tube and liquid injection shutdown system tube in PHWR

Sag of CT or liquid injection shutdown system tubes in pressurized heavy water reactor is known to occur due to irradiation creep and growth during plant operation. When the sag of CT is big enough, the CT tube possibly comes in contact with liquid injection shutdown system tube (LIN) crossing benea...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Nuclear engineering and design 2001-07, Vol.207 (2), p.125-135
Hauptverfasser: Kim, Tae Ryong, Sohn, Seok Man, Lee, Jun Shin, Lee, Sun Ki, Lee, Jong Po
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!