First operation experiences with ITER-FEAT model pump

Design and manufacturing of the model cryopump for ITER-FEAT have been finished. After acceptance tests at the contractor's premises the pump was installed in the TIMO-facility which was prepared for testing the pump under ITER-FEAT relevant operating conditions. The procedures for the final ac...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Fusion engineering and design 2001-11, Vol.58, p.365-369
Hauptverfasser: Mack, A, Day, Chr, Haas, H, Murdoch, D.K, Boissin, J.C, Schummer, P
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!