Site inventory tracking in the project supply chain: problem description and solution proposal in a very large telecom project
Purpose - This paper aims to describe how performance in the project supply chain can be improved by implementing information technology solutions that track site installation and inventory.Design methodology approach - The case study was initiated after observing unexpected problems and subsequent...
Gespeichert in:
Veröffentlicht in: | Supply chain management 2010-01, Vol.15 (3), p.252-260 |
---|---|
Hauptverfasser: | , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 260 |
---|---|
container_issue | 3 |
container_start_page | 252 |
container_title | Supply chain management |
container_volume | 15 |
creator | Ala-Risku, Timo Collin, Jari Holmström, Jan Vuorinen, Juha-Pekka |
description | Purpose - This paper aims to describe how performance in the project supply chain can be improved by implementing information technology solutions that track site installation and inventory.Design methodology approach - The case study was initiated after observing unexpected problems and subsequent performance improvement in a very large project delivery. Personnel involved in the project were interviewed and project documentation was analyzed to identify the reasons for initial poor performance and the changes that lead to the observed improvement.Findings - As the scale and complexity of a delivery project increases the role of accurate and robust tracking of installation work and inventory increases. Alignment between participants breaks down in the absence of reliable inventory tracking with potentially very adverse effects on project delivery operations. Introducing reliable inventory tracking can very quickly re-align participants and improve overall performance in a telecom delivery project.Research limitations implications - The findings are based on a case study, with particular characteristics: large number of dispersed installation sites, modular product, remote sensing. Topics for further research are suggested to assess the relevance of inventory tracking in different contexts.Practical implications - The case shows how an original equipment manufacturer (OEM) can improve project delivery performance by investing in inventory tracking between inventory drop-off and installation on the site.Originality value - Project delivery has received scarce attention in a supply chain management context. This paper contributes to the body of knowledge by showing how site inventory tracking affects performance and alignment of the whole project supply chain. |
doi_str_mv | 10.1108/13598541011040008 |
format | Article |
fullrecord | <record><control><sourceid>proquest_emera</sourceid><recordid>TN_cdi_proquest_miscellaneous_743755316</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2022759581</sourcerecordid><originalsourceid>FETCH-LOGICAL-c382t-38d56c617a50409b81bed15427569dd2d99c55475f9c3deaa3457cdf1e6eb5a13</originalsourceid><addsrcrecordid>eNqNkUtLxTAQhYso-PwB7oIbN1Y7zaOpOxFfILhQ1yU3mWqvaVOTVLgbf7u5Xt0ogqtkTr5zZsJk2T4UxwCFPAHKa8kZFKliRVHItWwLKi5zIXm5nu7pPU-A2My2Q5gnAhiUW9n7fReRdMMbDtH5BYle6ZdueEoSic9IRu_mqCMJ0zjaBdHPqhtOl-rMYk8MBu27MXZuIGowJDg7fRYJGF1QdhmjyBumZKv8E5KIFrXrv3N3s41W2YB7X-dO9nh58XB-nd_eXd2cn93mmsoy5lQaLrSASvH0u3omYYYGOCsrLmpjSlPXmnNW8bbW1KBSlPFKmxZQ4IwroDvZ4So39X2dMMSm74JGa9WAbgpNxWjFOQWRyIMf5NxNfkjDNSUIKVjNygTBCtLeheCxbUbf9covGiia5T6aX_tInmLlwR69suZflqM_LD_RZjQt_QB6mJp9</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>216864942</pqid></control><display><type>article</type><title>Site inventory tracking in the project supply chain: problem description and solution proposal in a very large telecom project</title><source>Emerald A-Z Current Journals</source><source>Standard: Emerald eJournal Premier Collection</source><creator>Ala-Risku, Timo ; Collin, Jari ; Holmström, Jan ; Vuorinen, Juha-Pekka</creator><creatorcontrib>Ala-Risku, Timo ; Collin, Jari ; Holmström, Jan ; Vuorinen, Juha-Pekka</creatorcontrib><description>Purpose - This paper aims to describe how performance in the project supply chain can be improved by implementing information technology solutions that track site installation and inventory.Design methodology approach - The case study was initiated after observing unexpected problems and subsequent performance improvement in a very large project delivery. Personnel involved in the project were interviewed and project documentation was analyzed to identify the reasons for initial poor performance and the changes that lead to the observed improvement.Findings - As the scale and complexity of a delivery project increases the role of accurate and robust tracking of installation work and inventory increases. Alignment between participants breaks down in the absence of reliable inventory tracking with potentially very adverse effects on project delivery operations. Introducing reliable inventory tracking can very quickly re-align participants and improve overall performance in a telecom delivery project.Research limitations implications - The findings are based on a case study, with particular characteristics: large number of dispersed installation sites, modular product, remote sensing. Topics for further research are suggested to assess the relevance of inventory tracking in different contexts.Practical implications - The case shows how an original equipment manufacturer (OEM) can improve project delivery performance by investing in inventory tracking between inventory drop-off and installation on the site.Originality value - Project delivery has received scarce attention in a supply chain management context. This paper contributes to the body of knowledge by showing how site inventory tracking affects performance and alignment of the whole project supply chain.</description><identifier>ISSN: 1359-8546</identifier><identifier>EISSN: 1758-6852</identifier><identifier>DOI: 10.1108/13598541011040008</identifier><language>eng</language><publisher>Bradford: Emerald Group Publishing Limited</publisher><subject>Capital investments ; Case studies ; Design specifications ; Field study ; Inventory ; Inventory control ; Inventory management ; Logistics ; Project management ; Studies ; Supply chain management</subject><ispartof>Supply chain management, 2010-01, Vol.15 (3), p.252-260</ispartof><rights>Emerald Group Publishing Limited</rights><rights>Copyright Emerald Group Publishing Limited 2010</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c382t-38d56c617a50409b81bed15427569dd2d99c55475f9c3deaa3457cdf1e6eb5a13</citedby><cites>FETCH-LOGICAL-c382t-38d56c617a50409b81bed15427569dd2d99c55475f9c3deaa3457cdf1e6eb5a13</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttps://www.emerald.com/insight/content/doi/10.1108/13598541011040008/full/pdf$$EPDF$$P50$$Gemerald$$H</linktopdf><linktohtml>$$Uhttps://www.emerald.com/insight/content/doi/10.1108/13598541011040008/full/html$$EHTML$$P50$$Gemerald$$H</linktohtml><link.rule.ids>314,780,784,967,11635,21695,27924,27925,52686,52689,53244,53372</link.rule.ids></links><search><creatorcontrib>Ala-Risku, Timo</creatorcontrib><creatorcontrib>Collin, Jari</creatorcontrib><creatorcontrib>Holmström, Jan</creatorcontrib><creatorcontrib>Vuorinen, Juha-Pekka</creatorcontrib><title>Site inventory tracking in the project supply chain: problem description and solution proposal in a very large telecom project</title><title>Supply chain management</title><description>Purpose - This paper aims to describe how performance in the project supply chain can be improved by implementing information technology solutions that track site installation and inventory.Design methodology approach - The case study was initiated after observing unexpected problems and subsequent performance improvement in a very large project delivery. Personnel involved in the project were interviewed and project documentation was analyzed to identify the reasons for initial poor performance and the changes that lead to the observed improvement.Findings - As the scale and complexity of a delivery project increases the role of accurate and robust tracking of installation work and inventory increases. Alignment between participants breaks down in the absence of reliable inventory tracking with potentially very adverse effects on project delivery operations. Introducing reliable inventory tracking can very quickly re-align participants and improve overall performance in a telecom delivery project.Research limitations implications - The findings are based on a case study, with particular characteristics: large number of dispersed installation sites, modular product, remote sensing. Topics for further research are suggested to assess the relevance of inventory tracking in different contexts.Practical implications - The case shows how an original equipment manufacturer (OEM) can improve project delivery performance by investing in inventory tracking between inventory drop-off and installation on the site.Originality value - Project delivery has received scarce attention in a supply chain management context. This paper contributes to the body of knowledge by showing how site inventory tracking affects performance and alignment of the whole project supply chain.</description><subject>Capital investments</subject><subject>Case studies</subject><subject>Design specifications</subject><subject>Field study</subject><subject>Inventory</subject><subject>Inventory control</subject><subject>Inventory management</subject><subject>Logistics</subject><subject>Project management</subject><subject>Studies</subject><subject>Supply chain management</subject><issn>1359-8546</issn><issn>1758-6852</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2010</creationdate><recordtype>article</recordtype><sourceid>AFKRA</sourceid><sourceid>BENPR</sourceid><sourceid>CCPQU</sourceid><sourceid>DWQXO</sourceid><recordid>eNqNkUtLxTAQhYso-PwB7oIbN1Y7zaOpOxFfILhQ1yU3mWqvaVOTVLgbf7u5Xt0ogqtkTr5zZsJk2T4UxwCFPAHKa8kZFKliRVHItWwLKi5zIXm5nu7pPU-A2My2Q5gnAhiUW9n7fReRdMMbDtH5BYle6ZdueEoSic9IRu_mqCMJ0zjaBdHPqhtOl-rMYk8MBu27MXZuIGowJDg7fRYJGF1QdhmjyBumZKv8E5KIFrXrv3N3s41W2YB7X-dO9nh58XB-nd_eXd2cn93mmsoy5lQaLrSASvH0u3omYYYGOCsrLmpjSlPXmnNW8bbW1KBSlPFKmxZQ4IwroDvZ4So39X2dMMSm74JGa9WAbgpNxWjFOQWRyIMf5NxNfkjDNSUIKVjNygTBCtLeheCxbUbf9covGiia5T6aX_tInmLlwR69suZflqM_LD_RZjQt_QB6mJp9</recordid><startdate>20100101</startdate><enddate>20100101</enddate><creator>Ala-Risku, Timo</creator><creator>Collin, Jari</creator><creator>Holmström, Jan</creator><creator>Vuorinen, Juha-Pekka</creator><general>Emerald Group Publishing Limited</general><scope>AAYXX</scope><scope>CITATION</scope><scope>0U~</scope><scope>1-H</scope><scope>7TA</scope><scope>7WY</scope><scope>7WZ</scope><scope>7XB</scope><scope>8AO</scope><scope>8FD</scope><scope>AFKRA</scope><scope>BENPR</scope><scope>BEZIV</scope><scope>CCPQU</scope><scope>DWQXO</scope><scope>F~G</scope><scope>JG9</scope><scope>K6~</scope><scope>K8~</scope><scope>L.-</scope><scope>L.0</scope><scope>M0C</scope><scope>PQBIZ</scope><scope>PQEST</scope><scope>PQQKQ</scope><scope>PQUKI</scope><scope>Q9U</scope></search><sort><creationdate>20100101</creationdate><title>Site inventory tracking in the project supply chain: problem description and solution proposal in a very large telecom project</title><author>Ala-Risku, Timo ; Collin, Jari ; Holmström, Jan ; Vuorinen, Juha-Pekka</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c382t-38d56c617a50409b81bed15427569dd2d99c55475f9c3deaa3457cdf1e6eb5a13</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2010</creationdate><topic>Capital investments</topic><topic>Case studies</topic><topic>Design specifications</topic><topic>Field study</topic><topic>Inventory</topic><topic>Inventory control</topic><topic>Inventory management</topic><topic>Logistics</topic><topic>Project management</topic><topic>Studies</topic><topic>Supply chain management</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Ala-Risku, Timo</creatorcontrib><creatorcontrib>Collin, Jari</creatorcontrib><creatorcontrib>Holmström, Jan</creatorcontrib><creatorcontrib>Vuorinen, Juha-Pekka</creatorcontrib><collection>CrossRef</collection><collection>Global News & ABI/Inform Professional</collection><collection>Trade PRO</collection><collection>Materials Business File</collection><collection>ABI/INFORM Collection</collection><collection>ABI/INFORM Global (PDF only)</collection><collection>ProQuest Central (purchase pre-March 2016)</collection><collection>ProQuest Pharma Collection</collection><collection>Technology Research Database</collection><collection>ProQuest Central UK/Ireland</collection><collection>ProQuest Central</collection><collection>Business Premium Collection</collection><collection>ProQuest One Community College</collection><collection>ProQuest Central Korea</collection><collection>ABI/INFORM Global (Corporate)</collection><collection>Materials Research Database</collection><collection>ProQuest Business Collection</collection><collection>DELNET Management Collection</collection><collection>ABI/INFORM Professional Advanced</collection><collection>ABI/INFORM Professional Standard</collection><collection>ABI/INFORM Global</collection><collection>ProQuest One Business</collection><collection>ProQuest One Academic Eastern Edition (DO NOT USE)</collection><collection>ProQuest One Academic</collection><collection>ProQuest One Academic UKI Edition</collection><collection>ProQuest Central Basic</collection><jtitle>Supply chain management</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Ala-Risku, Timo</au><au>Collin, Jari</au><au>Holmström, Jan</au><au>Vuorinen, Juha-Pekka</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Site inventory tracking in the project supply chain: problem description and solution proposal in a very large telecom project</atitle><jtitle>Supply chain management</jtitle><date>2010-01-01</date><risdate>2010</risdate><volume>15</volume><issue>3</issue><spage>252</spage><epage>260</epage><pages>252-260</pages><issn>1359-8546</issn><eissn>1758-6852</eissn><abstract>Purpose - This paper aims to describe how performance in the project supply chain can be improved by implementing information technology solutions that track site installation and inventory.Design methodology approach - The case study was initiated after observing unexpected problems and subsequent performance improvement in a very large project delivery. Personnel involved in the project were interviewed and project documentation was analyzed to identify the reasons for initial poor performance and the changes that lead to the observed improvement.Findings - As the scale and complexity of a delivery project increases the role of accurate and robust tracking of installation work and inventory increases. Alignment between participants breaks down in the absence of reliable inventory tracking with potentially very adverse effects on project delivery operations. Introducing reliable inventory tracking can very quickly re-align participants and improve overall performance in a telecom delivery project.Research limitations implications - The findings are based on a case study, with particular characteristics: large number of dispersed installation sites, modular product, remote sensing. Topics for further research are suggested to assess the relevance of inventory tracking in different contexts.Practical implications - The case shows how an original equipment manufacturer (OEM) can improve project delivery performance by investing in inventory tracking between inventory drop-off and installation on the site.Originality value - Project delivery has received scarce attention in a supply chain management context. This paper contributes to the body of knowledge by showing how site inventory tracking affects performance and alignment of the whole project supply chain.</abstract><cop>Bradford</cop><pub>Emerald Group Publishing Limited</pub><doi>10.1108/13598541011040008</doi><tpages>9</tpages></addata></record> |
fulltext | fulltext |
identifier | ISSN: 1359-8546 |
ispartof | Supply chain management, 2010-01, Vol.15 (3), p.252-260 |
issn | 1359-8546 1758-6852 |
language | eng |
recordid | cdi_proquest_miscellaneous_743755316 |
source | Emerald A-Z Current Journals; Standard: Emerald eJournal Premier Collection |
subjects | Capital investments Case studies Design specifications Field study Inventory Inventory control Inventory management Logistics Project management Studies Supply chain management |
title | Site inventory tracking in the project supply chain: problem description and solution proposal in a very large telecom project |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-05T03%3A43%3A24IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_emera&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Site%20inventory%20tracking%20in%20the%20project%20supply%20chain:%20problem%20description%20and%20solution%20proposal%20in%20a%20very%20large%20telecom%20project&rft.jtitle=Supply%20chain%20management&rft.au=Ala-Risku,%20Timo&rft.date=2010-01-01&rft.volume=15&rft.issue=3&rft.spage=252&rft.epage=260&rft.pages=252-260&rft.issn=1359-8546&rft.eissn=1758-6852&rft_id=info:doi/10.1108/13598541011040008&rft_dat=%3Cproquest_emera%3E2022759581%3C/proquest_emera%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=216864942&rft_id=info:pmid/&rfr_iscdi=true |