Retrofitting CO2 capture ready fossil plants with post-combustion capture. Part 1: Requirements for supercritical pulverized coal plants using solvent-based flue gas scrubbing
Abstract Rapid global deployment of carbon capture and storage (CCS) requires a two-track approach. CCS needs to be deployed at scale as quickly as possible and other plants, if built without CCS, need to be built CO2 capture ready (CCR) before they are retrofitted. In particular, coal plants are li...
Gespeichert in:
Veröffentlicht in: | Proceedings of the Institution of Mechanical Engineers. Part A, Journal of power and energy Journal of power and energy, 2009-05, Vol.223 (3), p.213-226 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!