Transient high-temperature stress relaxation of prestressing tendons in unbonded construction

Unbonded post-tensioned (UPT) flat plate concrete slabs are popular for modern continuous multiple bay floor assemblies due to economic and sustainability benefits (reductions in slab thickness and building self-weight) and structural advantages (decreased deflections over larger spans). Only limite...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Fire safety journal 2009-05, Vol.44 (4), p.570-579
Hauptverfasser: Gales, J., Bisby, L.A., MacDougall, C., MacLean, K.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!