Inception Point and Air Concentration in Flows on Stepped Chutes Lined with Wedge-Shaped Concrete Blocks

Stepped channels lined with wedge-shaped concrete blocks are a promising solution to provide overtopping protection for embankment dams if the discharge capacity of existing spillways is not adequate. The paper addresses the characteristics of the two-phase transition and skimming flows in stepped c...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of hydraulic engineering (New York, N.Y.) N.Y.), 2008-08, Vol.134 (8), p.1042-1051
Hauptverfasser: Relvas, António T, Pinheiro, António N
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!