The present status of R&D for the muon target at J-PARC: The development of silver-brazing method for graphite

At the J-PARC muon science facility, the muon target was made of an isotropic graphite (IG-43). The energy deposited by the proton beam is estimated to be 3.3 kW on graphite and 600 W on the copper frame. To alleviate the thermal stress, a titanium stress absorber is inserted between the graphite an...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of nuclear materials 2008-06, Vol.377 (1), p.28-33
Hauptverfasser: Makimura, Shunsuke, Ozaki, Hidetsugu, Okamura, Hisanori, Futakawa, Masatoshi, Naoe, Takashi, Miyake, Yasuhiro, Kawamura, Naritoshi, Nishiyama, Kusuo, Kawai, Masayoshi
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!