Results from a Forensic Investigation of a Failed Cement Treated Base
After only 2 months in service, the frontage road of US 290 developed a series of depressions that caused a very poor ride. The main cause of the premature failure was attributed to disintegration of the cement treated base (CTB) layer. This was attributed to two primary factors: (1) a very coarse g...
Gespeichert in:
Veröffentlicht in: | Journal of performance of constructed facilities 2008-06, Vol.22 (3), p.143-153 |
---|---|
Hauptverfasser: | , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!