Results from a Forensic Investigation of a Failed Cement Treated Base

After only 2 months in service, the frontage road of US 290 developed a series of depressions that caused a very poor ride. The main cause of the premature failure was attributed to disintegration of the cement treated base (CTB) layer. This was attributed to two primary factors: (1) a very coarse g...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of performance of constructed facilities 2008-06, Vol.22 (3), p.143-153
Hauptverfasser: Chen, Dar Hao, Scullion, Tom, Lee, Tzen-Chin, Bilyeu, John
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!