Algorithm for the Planning of Optimum Highway Work Zones

Work zones often cause traffic congestion on high volume roads. As traffic volumes increase so does work zone-related traffic congestion and so does the public demand for road agencies to decrease both their number and duration. Negative impacts on road users can be minimized by bundling interventio...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of infrastructure systems 2007-09, Vol.13 (3), p.202-214
Hauptverfasser: Hajdin, Rade, Lindenmann, Hans-Peter
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 214
container_issue 3
container_start_page 202
container_title Journal of infrastructure systems
container_volume 13
creator Hajdin, Rade
Lindenmann, Hans-Peter
description Work zones often cause traffic congestion on high volume roads. As traffic volumes increase so does work zone-related traffic congestion and so does the public demand for road agencies to decrease both their number and duration. Negative impacts on road users can be minimized by bundling interventions on several interconnected road sections instead of treating each road section separately. Negative impacts on road users can be quantified in user costs. The optimum work zone is the one that results in the minimum overall agency and user costs. The minimization of these costs is often the goal of corridor planning. In order to achieve this goal the interventions on each asset type (pavement, bridges, tunnels, hardware, etc.) must be bundled into optimum packages. In this paper a method is presented that enables road agencies to determine optimum work zones and intervention packages. The method allows the consideration of both budget constraints and distance constraints, including maximum permissible work zone length or minimum distance between work zones. The mathematical formulation of this optimization problem is a binary program that can be solved by existing techniques (i.e., the branch-and-bound method). The feasibility of the approach is illustrated with a simple example.
doi_str_mv 10.1061/(ASCE)1076-0342(2007)13:3(202)
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_miscellaneous_30091086</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>30091086</sourcerecordid><originalsourceid>FETCH-LOGICAL-a445t-62cb4e72b113a1ef81f7b6af2cf85e23e5b0348553050932451b7e27c480aacb3</originalsourceid><addsrcrecordid>eNp9kM1KAzEURoMoWKvvkI2lXYzeJJP5EVyUUq1QqKCiuAmZkLRTZyY1mSJ9ezO06s5VvsXJ_e49CA0IXBFIyPVw_DSZjgikSQQspkMKkI4Iu2Eh0dER6pE8ZhHn_O045B_sFJ15vwaALOG8h7JxtbSubFc1NtbhdqXxYyWbpmyW2Bq82LRlva3xrFyuvuQOv1r3gd9to_05OjGy8vri8PbRy930eTKL5ov7h8l4Hsk45m2UUFXEOqUFIUwSbTJi0iKRhiqTcU2Z5kXYKuOcAYec0ZiTItU0VXEGUqqC9dFgP3fj7OdW-1bUpVe6Cktqu_WCAeQkHBPA2z2onPXeaSM2rqyl2wkCohMmRCdMdCZEZ0J0wgRhgoVEw__LQ5H0SlbGyUaV_m9IDiRlSdeT77mAabG2W9eE-39L_u34BiCZe5s</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>30091086</pqid></control><display><type>article</type><title>Algorithm for the Planning of Optimum Highway Work Zones</title><source>American Society of Civil Engineers:NESLI2:Journals:2014</source><creator>Hajdin, Rade ; Lindenmann, Hans-Peter</creator><creatorcontrib>Hajdin, Rade ; Lindenmann, Hans-Peter</creatorcontrib><description>Work zones often cause traffic congestion on high volume roads. As traffic volumes increase so does work zone-related traffic congestion and so does the public demand for road agencies to decrease both their number and duration. Negative impacts on road users can be minimized by bundling interventions on several interconnected road sections instead of treating each road section separately. Negative impacts on road users can be quantified in user costs. The optimum work zone is the one that results in the minimum overall agency and user costs. The minimization of these costs is often the goal of corridor planning. In order to achieve this goal the interventions on each asset type (pavement, bridges, tunnels, hardware, etc.) must be bundled into optimum packages. In this paper a method is presented that enables road agencies to determine optimum work zones and intervention packages. The method allows the consideration of both budget constraints and distance constraints, including maximum permissible work zone length or minimum distance between work zones. The mathematical formulation of this optimization problem is a binary program that can be solved by existing techniques (i.e., the branch-and-bound method). The feasibility of the approach is illustrated with a simple example.</description><identifier>ISSN: 1076-0342</identifier><identifier>EISSN: 1943-555X</identifier><identifier>DOI: 10.1061/(ASCE)1076-0342(2007)13:3(202)</identifier><identifier>CODEN: JITSE4</identifier><language>eng</language><publisher>Reston, VA: American Society of Civil Engineers</publisher><subject>Applied sciences ; Buildings. Public works ; Computation methods. Tables. Charts ; Exact sciences and technology ; Project management. Process of design ; Road construction. Pavements. Maintenance ; Road works ; Structural analysis. Stresses ; TECHNICAL PAPERS ; Transportation infrastructure</subject><ispartof>Journal of infrastructure systems, 2007-09, Vol.13 (3), p.202-214</ispartof><rights>2008 INIST-CNRS</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-a445t-62cb4e72b113a1ef81f7b6af2cf85e23e5b0348553050932451b7e27c480aacb3</citedby><cites>FETCH-LOGICAL-a445t-62cb4e72b113a1ef81f7b6af2cf85e23e5b0348553050932451b7e27c480aacb3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttp://ascelibrary.org/doi/pdf/10.1061/(ASCE)1076-0342(2007)13:3(202)$$EPDF$$P50$$Gasce$$H</linktopdf><linktohtml>$$Uhttp://ascelibrary.org/doi/abs/10.1061/(ASCE)1076-0342(2007)13:3(202)$$EHTML$$P50$$Gasce$$H</linktohtml><link.rule.ids>314,776,780,27903,27904,75939,75947</link.rule.ids><backlink>$$Uhttp://pascal-francis.inist.fr/vibad/index.php?action=getRecordDetail&amp;idt=19017366$$DView record in Pascal Francis$$Hfree_for_read</backlink></links><search><creatorcontrib>Hajdin, Rade</creatorcontrib><creatorcontrib>Lindenmann, Hans-Peter</creatorcontrib><title>Algorithm for the Planning of Optimum Highway Work Zones</title><title>Journal of infrastructure systems</title><description>Work zones often cause traffic congestion on high volume roads. As traffic volumes increase so does work zone-related traffic congestion and so does the public demand for road agencies to decrease both their number and duration. Negative impacts on road users can be minimized by bundling interventions on several interconnected road sections instead of treating each road section separately. Negative impacts on road users can be quantified in user costs. The optimum work zone is the one that results in the minimum overall agency and user costs. The minimization of these costs is often the goal of corridor planning. In order to achieve this goal the interventions on each asset type (pavement, bridges, tunnels, hardware, etc.) must be bundled into optimum packages. In this paper a method is presented that enables road agencies to determine optimum work zones and intervention packages. The method allows the consideration of both budget constraints and distance constraints, including maximum permissible work zone length or minimum distance between work zones. The mathematical formulation of this optimization problem is a binary program that can be solved by existing techniques (i.e., the branch-and-bound method). The feasibility of the approach is illustrated with a simple example.</description><subject>Applied sciences</subject><subject>Buildings. Public works</subject><subject>Computation methods. Tables. Charts</subject><subject>Exact sciences and technology</subject><subject>Project management. Process of design</subject><subject>Road construction. Pavements. Maintenance</subject><subject>Road works</subject><subject>Structural analysis. Stresses</subject><subject>TECHNICAL PAPERS</subject><subject>Transportation infrastructure</subject><issn>1076-0342</issn><issn>1943-555X</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2007</creationdate><recordtype>article</recordtype><recordid>eNp9kM1KAzEURoMoWKvvkI2lXYzeJJP5EVyUUq1QqKCiuAmZkLRTZyY1mSJ9ezO06s5VvsXJ_e49CA0IXBFIyPVw_DSZjgikSQQspkMKkI4Iu2Eh0dER6pE8ZhHn_O045B_sFJ15vwaALOG8h7JxtbSubFc1NtbhdqXxYyWbpmyW2Bq82LRlva3xrFyuvuQOv1r3gd9to_05OjGy8vri8PbRy930eTKL5ov7h8l4Hsk45m2UUFXEOqUFIUwSbTJi0iKRhiqTcU2Z5kXYKuOcAYec0ZiTItU0VXEGUqqC9dFgP3fj7OdW-1bUpVe6Cktqu_WCAeQkHBPA2z2onPXeaSM2rqyl2wkCohMmRCdMdCZEZ0J0wgRhgoVEw__LQ5H0SlbGyUaV_m9IDiRlSdeT77mAabG2W9eE-39L_u34BiCZe5s</recordid><startdate>20070901</startdate><enddate>20070901</enddate><creator>Hajdin, Rade</creator><creator>Lindenmann, Hans-Peter</creator><general>American Society of Civil Engineers</general><scope>IQODW</scope><scope>AAYXX</scope><scope>CITATION</scope><scope>8FD</scope><scope>F28</scope><scope>FR3</scope><scope>KR7</scope></search><sort><creationdate>20070901</creationdate><title>Algorithm for the Planning of Optimum Highway Work Zones</title><author>Hajdin, Rade ; Lindenmann, Hans-Peter</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-a445t-62cb4e72b113a1ef81f7b6af2cf85e23e5b0348553050932451b7e27c480aacb3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2007</creationdate><topic>Applied sciences</topic><topic>Buildings. Public works</topic><topic>Computation methods. Tables. Charts</topic><topic>Exact sciences and technology</topic><topic>Project management. Process of design</topic><topic>Road construction. Pavements. Maintenance</topic><topic>Road works</topic><topic>Structural analysis. Stresses</topic><topic>TECHNICAL PAPERS</topic><topic>Transportation infrastructure</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Hajdin, Rade</creatorcontrib><creatorcontrib>Lindenmann, Hans-Peter</creatorcontrib><collection>Pascal-Francis</collection><collection>CrossRef</collection><collection>Technology Research Database</collection><collection>ANTE: Abstracts in New Technology &amp; Engineering</collection><collection>Engineering Research Database</collection><collection>Civil Engineering Abstracts</collection><jtitle>Journal of infrastructure systems</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Hajdin, Rade</au><au>Lindenmann, Hans-Peter</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Algorithm for the Planning of Optimum Highway Work Zones</atitle><jtitle>Journal of infrastructure systems</jtitle><date>2007-09-01</date><risdate>2007</risdate><volume>13</volume><issue>3</issue><spage>202</spage><epage>214</epage><pages>202-214</pages><issn>1076-0342</issn><eissn>1943-555X</eissn><coden>JITSE4</coden><abstract>Work zones often cause traffic congestion on high volume roads. As traffic volumes increase so does work zone-related traffic congestion and so does the public demand for road agencies to decrease both their number and duration. Negative impacts on road users can be minimized by bundling interventions on several interconnected road sections instead of treating each road section separately. Negative impacts on road users can be quantified in user costs. The optimum work zone is the one that results in the minimum overall agency and user costs. The minimization of these costs is often the goal of corridor planning. In order to achieve this goal the interventions on each asset type (pavement, bridges, tunnels, hardware, etc.) must be bundled into optimum packages. In this paper a method is presented that enables road agencies to determine optimum work zones and intervention packages. The method allows the consideration of both budget constraints and distance constraints, including maximum permissible work zone length or minimum distance between work zones. The mathematical formulation of this optimization problem is a binary program that can be solved by existing techniques (i.e., the branch-and-bound method). The feasibility of the approach is illustrated with a simple example.</abstract><cop>Reston, VA</cop><pub>American Society of Civil Engineers</pub><doi>10.1061/(ASCE)1076-0342(2007)13:3(202)</doi><tpages>13</tpages></addata></record>
fulltext fulltext
identifier ISSN: 1076-0342
ispartof Journal of infrastructure systems, 2007-09, Vol.13 (3), p.202-214
issn 1076-0342
1943-555X
language eng
recordid cdi_proquest_miscellaneous_30091086
source American Society of Civil Engineers:NESLI2:Journals:2014
subjects Applied sciences
Buildings. Public works
Computation methods. Tables. Charts
Exact sciences and technology
Project management. Process of design
Road construction. Pavements. Maintenance
Road works
Structural analysis. Stresses
TECHNICAL PAPERS
Transportation infrastructure
title Algorithm for the Planning of Optimum Highway Work Zones
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-23T21%3A45%3A31IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Algorithm%20for%20the%20Planning%20of%20Optimum%20Highway%20Work%20Zones&rft.jtitle=Journal%20of%20infrastructure%20systems&rft.au=Hajdin,%20Rade&rft.date=2007-09-01&rft.volume=13&rft.issue=3&rft.spage=202&rft.epage=214&rft.pages=202-214&rft.issn=1076-0342&rft.eissn=1943-555X&rft.coden=JITSE4&rft_id=info:doi/10.1061/(ASCE)1076-0342(2007)13:3(202)&rft_dat=%3Cproquest_cross%3E30091086%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=30091086&rft_id=info:pmid/&rfr_iscdi=true