STUDY ON OPERATION STANDARD TIME WITH PRECAST MEMBERS IN CONSTRUCTION OF HIGH-RISE RC BUILDINGS USING HIGH STRENGTH CONCRETE

A 45-story RC building, where pre-cast concrete members were employed for its outer frame as well as inside columns and beams, were construction, and the estimate equation of the operation standard time was examined with its construction data. As a result, the following conclusions were obtained. 1)...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of Structural and Construction Engineering (Transactions of AIJ) 2006/08/30, Vol.71(606), pp.21-28
Hauptverfasser: KAWAI, Kunihiko, HAYAKAWA, Mitsutaka, JINNAI, Hiroshi
Format: Artikel
Sprache:jpn
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 28
container_issue 606
container_start_page 21
container_title Journal of Structural and Construction Engineering (Transactions of AIJ)
container_volume 71
creator KAWAI, Kunihiko
HAYAKAWA, Mitsutaka
JINNAI, Hiroshi
description A 45-story RC building, where pre-cast concrete members were employed for its outer frame as well as inside columns and beams, were construction, and the estimate equation of the operation standard time was examined with its construction data. As a result, the following conclusions were obtained. 1) In this measurement, the installation time of the pre-cast member in the top floor has decreased to 39.4〜63.8% compared with that in the floor. 2) In the construction of the high-rise RC building, the reason for the reduction in installation of the pre-cast column and the pre-cast beam from a lower floor to the upper depends on both the improvement of worker's capability and the change in the work difficulty. 3) The change in the total mean operation time by repeating work in high-rise RC buildings can be estimated with the logarithm model of the learning engineering. However, it is necessary to consider the change in the work difficulty for evaluation of the installation time of pre-cast members in high-rise RC buildings.
doi_str_mv 10.3130/aijs.71.21_2
format Article
fullrecord <record><control><sourceid>proquest_jstag</sourceid><recordid>TN_cdi_proquest_miscellaneous_29646893</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>29646893</sourcerecordid><originalsourceid>FETCH-LOGICAL-j983-bada490925b32e628192a01b84ad86856b1846883ed02fdb8ef292bb77f2d9b53</originalsourceid><addsrcrecordid>eNo9kM9PwjAcxRejiYje_AN68jbsj1Ha4xhlFGEjXYnx1HSsKIRfbnAw8Y-3oPF7-bzk-947vCB4RLBDEIHPdrVuOj3Uwcjgq6CFGEMhQ11y7TWJYBhhiG-Du6ZZQ0gjTlEr-C70fPAG8gzkM6FiLb0qdJwNYjUAWk4FeJV6BGZKJHGhwVRM-0IVQGYgybNCq3lyieRDMJLpKFSyEEAloD-Xk4HM0gLMC4_L0_cqkaW-zUcTJbS4D26WdtO4hz-2Az0UOhmFkzyVSTwJ15yRsLSVjTjkuFsS7ChmiGMLUckiWzHKurRELKKMEVdBvKxK5paY47Ls9Za44mWXtIOn39pDvf88ueZotqtm4TYbu3P7U2Mwpz7PiTeOf43r5mjfnTnUq62tv4ytj6vFxpnzvqaHDIX0jJcx9BeRCDEC_02LD1sbtyM_6eJvpw</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>29646893</pqid></control><display><type>article</type><title>STUDY ON OPERATION STANDARD TIME WITH PRECAST MEMBERS IN CONSTRUCTION OF HIGH-RISE RC BUILDINGS USING HIGH STRENGTH CONCRETE</title><source>J-STAGE (Japan Science &amp; Technology Information Aggregator, Electronic) Freely Available Titles - Japanese</source><creator>KAWAI, Kunihiko ; HAYAKAWA, Mitsutaka ; JINNAI, Hiroshi</creator><creatorcontrib>KAWAI, Kunihiko ; HAYAKAWA, Mitsutaka ; JINNAI, Hiroshi</creatorcontrib><description>A 45-story RC building, where pre-cast concrete members were employed for its outer frame as well as inside columns and beams, were construction, and the estimate equation of the operation standard time was examined with its construction data. As a result, the following conclusions were obtained. 1) In this measurement, the installation time of the pre-cast member in the top floor has decreased to 39.4〜63.8% compared with that in the floor. 2) In the construction of the high-rise RC building, the reason for the reduction in installation of the pre-cast column and the pre-cast beam from a lower floor to the upper depends on both the improvement of worker's capability and the change in the work difficulty. 3) The change in the total mean operation time by repeating work in high-rise RC buildings can be estimated with the logarithm model of the learning engineering. However, it is necessary to consider the change in the work difficulty for evaluation of the installation time of pre-cast members in high-rise RC buildings.</description><identifier>ISSN: 1340-4202</identifier><identifier>EISSN: 1881-8153</identifier><identifier>DOI: 10.3130/aijs.71.21_2</identifier><language>jpn</language><publisher>Architectural Institute of Japan</publisher><subject>Construction method ; High-rise RC building ; Learning engineering ; Operation standard time ; Pre-cast concrete</subject><ispartof>Journal of Structural and Construction Engineering (Transactions of AIJ), 2006/08/30, Vol.71(606), pp.21-28</ispartof><rights>2006 Architectural Institute of Japan</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,776,780,1877,27901,27902</link.rule.ids></links><search><creatorcontrib>KAWAI, Kunihiko</creatorcontrib><creatorcontrib>HAYAKAWA, Mitsutaka</creatorcontrib><creatorcontrib>JINNAI, Hiroshi</creatorcontrib><title>STUDY ON OPERATION STANDARD TIME WITH PRECAST MEMBERS IN CONSTRUCTION OF HIGH-RISE RC BUILDINGS USING HIGH STRENGTH CONCRETE</title><title>Journal of Structural and Construction Engineering (Transactions of AIJ)</title><addtitle>J. Struct. Constr. Eng.</addtitle><description>A 45-story RC building, where pre-cast concrete members were employed for its outer frame as well as inside columns and beams, were construction, and the estimate equation of the operation standard time was examined with its construction data. As a result, the following conclusions were obtained. 1) In this measurement, the installation time of the pre-cast member in the top floor has decreased to 39.4〜63.8% compared with that in the floor. 2) In the construction of the high-rise RC building, the reason for the reduction in installation of the pre-cast column and the pre-cast beam from a lower floor to the upper depends on both the improvement of worker's capability and the change in the work difficulty. 3) The change in the total mean operation time by repeating work in high-rise RC buildings can be estimated with the logarithm model of the learning engineering. However, it is necessary to consider the change in the work difficulty for evaluation of the installation time of pre-cast members in high-rise RC buildings.</description><subject>Construction method</subject><subject>High-rise RC building</subject><subject>Learning engineering</subject><subject>Operation standard time</subject><subject>Pre-cast concrete</subject><issn>1340-4202</issn><issn>1881-8153</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2006</creationdate><recordtype>article</recordtype><recordid>eNo9kM9PwjAcxRejiYje_AN68jbsj1Ha4xhlFGEjXYnx1HSsKIRfbnAw8Y-3oPF7-bzk-947vCB4RLBDEIHPdrVuOj3Uwcjgq6CFGEMhQ11y7TWJYBhhiG-Du6ZZQ0gjTlEr-C70fPAG8gzkM6FiLb0qdJwNYjUAWk4FeJV6BGZKJHGhwVRM-0IVQGYgybNCq3lyieRDMJLpKFSyEEAloD-Xk4HM0gLMC4_L0_cqkaW-zUcTJbS4D26WdtO4hz-2Az0UOhmFkzyVSTwJ15yRsLSVjTjkuFsS7ChmiGMLUckiWzHKurRELKKMEVdBvKxK5paY47Ls9Za44mWXtIOn39pDvf88ueZotqtm4TYbu3P7U2Mwpz7PiTeOf43r5mjfnTnUq62tv4ytj6vFxpnzvqaHDIX0jJcx9BeRCDEC_02LD1sbtyM_6eJvpw</recordid><startdate>20060830</startdate><enddate>20060830</enddate><creator>KAWAI, Kunihiko</creator><creator>HAYAKAWA, Mitsutaka</creator><creator>JINNAI, Hiroshi</creator><general>Architectural Institute of Japan</general><scope>8FD</scope><scope>FR3</scope><scope>KR7</scope></search><sort><creationdate>20060830</creationdate><title>STUDY ON OPERATION STANDARD TIME WITH PRECAST MEMBERS IN CONSTRUCTION OF HIGH-RISE RC BUILDINGS USING HIGH STRENGTH CONCRETE</title><author>KAWAI, Kunihiko ; HAYAKAWA, Mitsutaka ; JINNAI, Hiroshi</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-j983-bada490925b32e628192a01b84ad86856b1846883ed02fdb8ef292bb77f2d9b53</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>jpn</language><creationdate>2006</creationdate><topic>Construction method</topic><topic>High-rise RC building</topic><topic>Learning engineering</topic><topic>Operation standard time</topic><topic>Pre-cast concrete</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>KAWAI, Kunihiko</creatorcontrib><creatorcontrib>HAYAKAWA, Mitsutaka</creatorcontrib><creatorcontrib>JINNAI, Hiroshi</creatorcontrib><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>Civil Engineering Abstracts</collection><jtitle>Journal of Structural and Construction Engineering (Transactions of AIJ)</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>KAWAI, Kunihiko</au><au>HAYAKAWA, Mitsutaka</au><au>JINNAI, Hiroshi</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>STUDY ON OPERATION STANDARD TIME WITH PRECAST MEMBERS IN CONSTRUCTION OF HIGH-RISE RC BUILDINGS USING HIGH STRENGTH CONCRETE</atitle><jtitle>Journal of Structural and Construction Engineering (Transactions of AIJ)</jtitle><addtitle>J. Struct. Constr. Eng.</addtitle><date>2006-08-30</date><risdate>2006</risdate><volume>71</volume><issue>606</issue><spage>21</spage><epage>28</epage><pages>21-28</pages><issn>1340-4202</issn><eissn>1881-8153</eissn><abstract>A 45-story RC building, where pre-cast concrete members were employed for its outer frame as well as inside columns and beams, were construction, and the estimate equation of the operation standard time was examined with its construction data. As a result, the following conclusions were obtained. 1) In this measurement, the installation time of the pre-cast member in the top floor has decreased to 39.4〜63.8% compared with that in the floor. 2) In the construction of the high-rise RC building, the reason for the reduction in installation of the pre-cast column and the pre-cast beam from a lower floor to the upper depends on both the improvement of worker's capability and the change in the work difficulty. 3) The change in the total mean operation time by repeating work in high-rise RC buildings can be estimated with the logarithm model of the learning engineering. However, it is necessary to consider the change in the work difficulty for evaluation of the installation time of pre-cast members in high-rise RC buildings.</abstract><pub>Architectural Institute of Japan</pub><doi>10.3130/aijs.71.21_2</doi><tpages>8</tpages><oa>free_for_read</oa></addata></record>
fulltext fulltext
identifier ISSN: 1340-4202
ispartof Journal of Structural and Construction Engineering (Transactions of AIJ), 2006/08/30, Vol.71(606), pp.21-28
issn 1340-4202
1881-8153
language jpn
recordid cdi_proquest_miscellaneous_29646893
source J-STAGE (Japan Science & Technology Information Aggregator, Electronic) Freely Available Titles - Japanese
subjects Construction method
High-rise RC building
Learning engineering
Operation standard time
Pre-cast concrete
title STUDY ON OPERATION STANDARD TIME WITH PRECAST MEMBERS IN CONSTRUCTION OF HIGH-RISE RC BUILDINGS USING HIGH STRENGTH CONCRETE
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-01T21%3A30%3A54IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_jstag&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=STUDY%20ON%20OPERATION%20STANDARD%20TIME%20WITH%20PRECAST%20MEMBERS%20IN%20CONSTRUCTION%20OF%20HIGH-RISE%20RC%20BUILDINGS%20USING%20HIGH%20STRENGTH%20CONCRETE&rft.jtitle=Journal%20of%20Structural%20and%20Construction%20Engineering%20(Transactions%20of%20AIJ)&rft.au=KAWAI,%20Kunihiko&rft.date=2006-08-30&rft.volume=71&rft.issue=606&rft.spage=21&rft.epage=28&rft.pages=21-28&rft.issn=1340-4202&rft.eissn=1881-8153&rft_id=info:doi/10.3130/aijs.71.21_2&rft_dat=%3Cproquest_jstag%3E29646893%3C/proquest_jstag%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=29646893&rft_id=info:pmid/&rfr_iscdi=true