Avoiding Change Orders in Public School Construction

Increased student enrollment and the current poor state of the educational infrastructure require the construction of more school buildings and the renovation of many of the existing ones. The large number and magnitude of change orders in these projects constitute an impediment to the rapid and eco...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of professional issues in engineering education and practice 2007-01, Vol.133 (1), p.67-73
Hauptverfasser: Günhan, Suat, Arditi, David, Doyle, Jacqueline
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 73
container_issue 1
container_start_page 67
container_title Journal of professional issues in engineering education and practice
container_volume 133
creator Günhan, Suat
Arditi, David
Doyle, Jacqueline
description Increased student enrollment and the current poor state of the educational infrastructure require the construction of more school buildings and the renovation of many of the existing ones. The large number and magnitude of change orders in these projects constitute an impediment to the rapid and economic delivery of these projects. A total of 6,585 change orders filed in a school district’s projects in the 5 1/2 year period from 1999 to 2004 were analyzed in five categories including owner-directed changes, code compliance issues, errors/omissions in contract documents, discovered or changed conditions, and others. The results of the study indicate that the dollar value of change orders relative to the original contract can be reduced if preventive measures are taken. These measures include choosing the right construction management firm, emphasizing the definition of project scope early in the project, and effectively managing the precontract activities by conducting value engineering and constructability reviews. The results indicate that school projects can be completed with change orders not exceeding 5% of the contract value if these measures are taken. This study is of relevance to practitioners involved in school design and construction projects.
doi_str_mv 10.1061/(ASCE)1052-3928(2007)133:1(67)
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_miscellaneous_29566889</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>29566889</sourcerecordid><originalsourceid>FETCH-LOGICAL-a349t-1849bca6ecc46c60617067dbd22e650be5b3c071124fcc1e1179af41cdb5a5e43</originalsourceid><addsrcrecordid>eNp9kE1Lw0AQhhdRsFb_Q06lPUR39itZwUMJ9QMKFarnZbPZtClptu4mgv_ehKhHTzOH93mZeRCaAb4FLOBuvtxmqwVgTmIqSTonGCcLoPQe5iJZnKEJSEZjzhmc9_tv7BJdhXDAGBNO8QSx5aeriqrZRdleNzsbbXxhfYiqJnrt8roy0dbsnaujzDWh9Z1pK9dco4tS18He_Mwpen9cvWXP8Xrz9JIt17GmTLYxpEzmRgtrDBNG9DcnWCRFXhBiBce55Tk1OAEgrDQGLEAidcnAFDnX3DI6RbOx9-TdR2dDq45VMLaudWNdFxSRXIg0lX3wYQwa70LwtlQnXx21_1KA1SBLqUGWGiyowYIaZKlelgIlkp6XI6_7enVwnW_6v_7gf9lvsfFuNA</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>29566889</pqid></control><display><type>article</type><title>Avoiding Change Orders in Public School Construction</title><source>American Society of Civil Engineers:NESLI2:Journals:2014</source><source>EBSCOhost Education Source</source><creator>Günhan, Suat ; Arditi, David ; Doyle, Jacqueline</creator><creatorcontrib>Günhan, Suat ; Arditi, David ; Doyle, Jacqueline</creatorcontrib><description>Increased student enrollment and the current poor state of the educational infrastructure require the construction of more school buildings and the renovation of many of the existing ones. The large number and magnitude of change orders in these projects constitute an impediment to the rapid and economic delivery of these projects. A total of 6,585 change orders filed in a school district’s projects in the 5 1/2 year period from 1999 to 2004 were analyzed in five categories including owner-directed changes, code compliance issues, errors/omissions in contract documents, discovered or changed conditions, and others. The results of the study indicate that the dollar value of change orders relative to the original contract can be reduced if preventive measures are taken. These measures include choosing the right construction management firm, emphasizing the definition of project scope early in the project, and effectively managing the precontract activities by conducting value engineering and constructability reviews. The results indicate that school projects can be completed with change orders not exceeding 5% of the contract value if these measures are taken. This study is of relevance to practitioners involved in school design and construction projects.</description><identifier>ISSN: 1052-3928</identifier><identifier>EISSN: 1943-5541</identifier><identifier>DOI: 10.1061/(ASCE)1052-3928(2007)133:1(67)</identifier><language>eng</language><publisher>American Society of Civil Engineers</publisher><subject>LEGAL AFFAIRS SECTION</subject><ispartof>Journal of professional issues in engineering education and practice, 2007-01, Vol.133 (1), p.67-73</ispartof><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-a349t-1849bca6ecc46c60617067dbd22e650be5b3c071124fcc1e1179af41cdb5a5e43</citedby><cites>FETCH-LOGICAL-a349t-1849bca6ecc46c60617067dbd22e650be5b3c071124fcc1e1179af41cdb5a5e43</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttp://ascelibrary.org/doi/pdf/10.1061/(ASCE)1052-3928(2007)133:1(67)$$EPDF$$P50$$Gasce$$H</linktopdf><linktohtml>$$Uhttp://ascelibrary.org/doi/abs/10.1061/(ASCE)1052-3928(2007)133:1(67)$$EHTML$$P50$$Gasce$$H</linktohtml><link.rule.ids>314,780,784,27924,27925,76193,76201</link.rule.ids></links><search><creatorcontrib>Günhan, Suat</creatorcontrib><creatorcontrib>Arditi, David</creatorcontrib><creatorcontrib>Doyle, Jacqueline</creatorcontrib><title>Avoiding Change Orders in Public School Construction</title><title>Journal of professional issues in engineering education and practice</title><description>Increased student enrollment and the current poor state of the educational infrastructure require the construction of more school buildings and the renovation of many of the existing ones. The large number and magnitude of change orders in these projects constitute an impediment to the rapid and economic delivery of these projects. A total of 6,585 change orders filed in a school district’s projects in the 5 1/2 year period from 1999 to 2004 were analyzed in five categories including owner-directed changes, code compliance issues, errors/omissions in contract documents, discovered or changed conditions, and others. The results of the study indicate that the dollar value of change orders relative to the original contract can be reduced if preventive measures are taken. These measures include choosing the right construction management firm, emphasizing the definition of project scope early in the project, and effectively managing the precontract activities by conducting value engineering and constructability reviews. The results indicate that school projects can be completed with change orders not exceeding 5% of the contract value if these measures are taken. This study is of relevance to practitioners involved in school design and construction projects.</description><subject>LEGAL AFFAIRS SECTION</subject><issn>1052-3928</issn><issn>1943-5541</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2007</creationdate><recordtype>article</recordtype><recordid>eNp9kE1Lw0AQhhdRsFb_Q06lPUR39itZwUMJ9QMKFarnZbPZtClptu4mgv_ehKhHTzOH93mZeRCaAb4FLOBuvtxmqwVgTmIqSTonGCcLoPQe5iJZnKEJSEZjzhmc9_tv7BJdhXDAGBNO8QSx5aeriqrZRdleNzsbbXxhfYiqJnrt8roy0dbsnaujzDWh9Z1pK9dco4tS18He_Mwpen9cvWXP8Xrz9JIt17GmTLYxpEzmRgtrDBNG9DcnWCRFXhBiBce55Tk1OAEgrDQGLEAidcnAFDnX3DI6RbOx9-TdR2dDq45VMLaudWNdFxSRXIg0lX3wYQwa70LwtlQnXx21_1KA1SBLqUGWGiyowYIaZKlelgIlkp6XI6_7enVwnW_6v_7gf9lvsfFuNA</recordid><startdate>200701</startdate><enddate>200701</enddate><creator>Günhan, Suat</creator><creator>Arditi, David</creator><creator>Doyle, Jacqueline</creator><general>American Society of Civil Engineers</general><scope>AAYXX</scope><scope>CITATION</scope><scope>7TA</scope><scope>7TB</scope><scope>8FD</scope><scope>F28</scope><scope>FR3</scope><scope>JG9</scope><scope>KR7</scope></search><sort><creationdate>200701</creationdate><title>Avoiding Change Orders in Public School Construction</title><author>Günhan, Suat ; Arditi, David ; Doyle, Jacqueline</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-a349t-1849bca6ecc46c60617067dbd22e650be5b3c071124fcc1e1179af41cdb5a5e43</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2007</creationdate><topic>LEGAL AFFAIRS SECTION</topic><toplevel>online_resources</toplevel><creatorcontrib>Günhan, Suat</creatorcontrib><creatorcontrib>Arditi, David</creatorcontrib><creatorcontrib>Doyle, Jacqueline</creatorcontrib><collection>CrossRef</collection><collection>Materials Business File</collection><collection>Mechanical &amp; Transportation Engineering Abstracts</collection><collection>Technology Research Database</collection><collection>ANTE: Abstracts in New Technology &amp; Engineering</collection><collection>Engineering Research Database</collection><collection>Materials Research Database</collection><collection>Civil Engineering Abstracts</collection><jtitle>Journal of professional issues in engineering education and practice</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Günhan, Suat</au><au>Arditi, David</au><au>Doyle, Jacqueline</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Avoiding Change Orders in Public School Construction</atitle><jtitle>Journal of professional issues in engineering education and practice</jtitle><date>2007-01</date><risdate>2007</risdate><volume>133</volume><issue>1</issue><spage>67</spage><epage>73</epage><pages>67-73</pages><issn>1052-3928</issn><eissn>1943-5541</eissn><abstract>Increased student enrollment and the current poor state of the educational infrastructure require the construction of more school buildings and the renovation of many of the existing ones. The large number and magnitude of change orders in these projects constitute an impediment to the rapid and economic delivery of these projects. A total of 6,585 change orders filed in a school district’s projects in the 5 1/2 year period from 1999 to 2004 were analyzed in five categories including owner-directed changes, code compliance issues, errors/omissions in contract documents, discovered or changed conditions, and others. The results of the study indicate that the dollar value of change orders relative to the original contract can be reduced if preventive measures are taken. These measures include choosing the right construction management firm, emphasizing the definition of project scope early in the project, and effectively managing the precontract activities by conducting value engineering and constructability reviews. The results indicate that school projects can be completed with change orders not exceeding 5% of the contract value if these measures are taken. This study is of relevance to practitioners involved in school design and construction projects.</abstract><pub>American Society of Civil Engineers</pub><doi>10.1061/(ASCE)1052-3928(2007)133:1(67)</doi><tpages>7</tpages></addata></record>
fulltext fulltext
identifier ISSN: 1052-3928
ispartof Journal of professional issues in engineering education and practice, 2007-01, Vol.133 (1), p.67-73
issn 1052-3928
1943-5541
language eng
recordid cdi_proquest_miscellaneous_29566889
source American Society of Civil Engineers:NESLI2:Journals:2014; EBSCOhost Education Source
subjects LEGAL AFFAIRS SECTION
title Avoiding Change Orders in Public School Construction
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-29T11%3A04%3A42IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Avoiding%20Change%20Orders%20in%20Public%20School%20Construction&rft.jtitle=Journal%20of%20professional%20issues%20in%20engineering%20education%20and%20practice&rft.au=G%C3%BCnhan,%20Suat&rft.date=2007-01&rft.volume=133&rft.issue=1&rft.spage=67&rft.epage=73&rft.pages=67-73&rft.issn=1052-3928&rft.eissn=1943-5541&rft_id=info:doi/10.1061/(ASCE)1052-3928(2007)133:1(67)&rft_dat=%3Cproquest_cross%3E29566889%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=29566889&rft_id=info:pmid/&rfr_iscdi=true