Comparing Procurement Methods for Design-Build Projects
The design-build delivery method is increasingly used in the United States due to numerous advantages it can offer a project. An important issue associated with design-build delivery is the procurement method used to select the design-build team. It is a critical decision that involves several key p...
Gespeichert in:
Veröffentlicht in: | Journal of construction engineering and management 2006-03, Vol.132 (3), p.230-238 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The design-build delivery method is increasingly used in the United States due to numerous advantages it can offer a project. An important issue associated with design-build delivery is the procurement method used to select the design-build team. It is a critical decision that involves several key project team members, including the owner, designer, and contractor organizations, and requires the owner to carefully choose the design-build procurement method that will be used to select the team that will deliver the project. This research quantitatively analyzed the correlation between the design-build procurement method and the performance of the design-build project with regard to cost, time, and quality metrics. The procurement methods studied were sole source, qualifications-based, best value, and low bid selection. Data were collected through surveys from 76 design-build projects in the United States. Based on the patterns and relationships identified from these data, a better understanding of the procurement process and how it influences project performance is achieved. The impact of project-specific factors and guidelines are presented to assist owners in selecting the design-build team procurement method that responds to their project goals. |
---|---|
ISSN: | 0733-9364 1943-7862 |
DOI: | 10.1061/(ASCE)0733-9364(2006)132:3(230) |