Multi-objective optimization of operational variables in a waste incineration plant

One of the primary objectives of the operation of a waste incineration plant is to maximise throughput. However, increasing throughput can intensify the loading on the gas-clean-up system and also cause a violation of operational constraints. This may result in penalty costs due to excessive polluti...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Computers & chemical engineering 2005-04, Vol.29 (5), p.1121-1130
Hauptverfasser: Anderson, S.R., Kadirkamanathan, V., Chipperfield, A., Sharifi, V., Swithenbank, J.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!