Preliminary Gas Turbine Design Using the Multidisciplinary Design System MOPEDS

A prototype preliminary design task for gas turbines is set up to outline the four major requirements a preliminary design program must typically meet: assessment of all major engine components and their interrelations; inclusion of all relevant disciplines; designing over several operating points;...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of engineering for gas turbines and power 2004-04, Vol.126 (2), p.258-264
Hauptverfasser: Jeschke, P, Kurzke, J, Schaber, R, Riegler, C
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!