Pennsylvania SPS-6 Performance at 10 Years: Evaluation of Concrete Pavement Rehabilitation Strategies

With a long history of constructing jointed concrete pavements, Pennsylvania pursued the construction of Special Pavement Studies (SPS-6) sections for the rehabilitation of jointed concrete pavements experiment. After 10 years of service under very high loads on rural Interstate highways, a number o...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Transportation research record 2003, Vol.1823 (1), p.28-38
Hauptverfasser: Morian, Dennis A., Coleman, Laura, Frith, Doug J., Stoffels, Shelley M., Dawood, Dan
Format: Artikel
Sprache:eng
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 38
container_issue 1
container_start_page 28
container_title Transportation research record
container_volume 1823
creator Morian, Dennis A.
Coleman, Laura
Frith, Doug J.
Stoffels, Shelley M.
Dawood, Dan
description With a long history of constructing jointed concrete pavements, Pennsylvania pursued the construction of Special Pavement Studies (SPS-6) sections for the rehabilitation of jointed concrete pavements experiment. After 10 years of service under very high loads on rural Interstate highways, a number of sections required renewal. The performances of the eight standard Strategic Highway Research Program sections, a control section, and three state supplemental sections were examined. The experiment included a broad range of treatments, including minimum and maximum concrete pavement restoration, the use of thin and thick overlays, and the use of crack or break and seat as well as rubblization as pretreatments for pavement overlays. Ten years after construction, many of the pavements that received the treatments are in need of major rehabilitation. This provides an opportune time to evaluate both the structural and functional performances of these test sections to date. Additionally, an evaluation of cost-effectiveness showed the importance of performing thorough evaluations of projects for rehabilitation and the potential benefit of rubblization of badly damaged jointed concrete pavements, a method used on the state supplemental sections, as a preoverlay strategy.
doi_str_mv 10.3141/1823-04
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_miscellaneous_27917239</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sage_id>10.3141_1823-04</sage_id><sourcerecordid>27917239</sourcerecordid><originalsourceid>FETCH-LOGICAL-c226t-c388de34fb5be3716fad46684f65ddf88fea55b4f8de5098c9aada390d89d2cd3</originalsourceid><addsrcrecordid>eNpl0E9LwzAYBvAgCs4pfoUcRE_VpEnbxJuM-QcGFqcHT-Vt-2Z2tOlM0sG-vZV68_RcfjzwPIRccnYruOR3XMUiYvKIzGKe6kiyJD4mMyZSHnGt-Ck5837LmBAyEzOCOVrrD-0ebAN0na-jlOboTO86sBVSCJQz-ong_D1d7qEdIDS9pb2hi95WDgPSHPbYoQ30Db-gbNomTGYdHATcNOjPyYmB1uPFX87Jx-PyffEcrV6fXhYPq6iK4zRElVCqRiFNmZQoMp4aqGWaKmnSpK6NUgYhSUppRpUwrSoNUIPQrFa6jqtazMn11Ltz_feAPhRd4ytsW7DYD76IM82zWOgR3kywcr33Dk2xc00H7lBwVvzeWPzeWDA5yqtJethgse0HZ8cF_9gP87Nwvw</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>27917239</pqid></control><display><type>article</type><title>Pennsylvania SPS-6 Performance at 10 Years: Evaluation of Concrete Pavement Rehabilitation Strategies</title><source>SAGE Complete</source><creator>Morian, Dennis A. ; Coleman, Laura ; Frith, Doug J. ; Stoffels, Shelley M. ; Dawood, Dan</creator><creatorcontrib>Morian, Dennis A. ; Coleman, Laura ; Frith, Doug J. ; Stoffels, Shelley M. ; Dawood, Dan</creatorcontrib><description>With a long history of constructing jointed concrete pavements, Pennsylvania pursued the construction of Special Pavement Studies (SPS-6) sections for the rehabilitation of jointed concrete pavements experiment. After 10 years of service under very high loads on rural Interstate highways, a number of sections required renewal. The performances of the eight standard Strategic Highway Research Program sections, a control section, and three state supplemental sections were examined. The experiment included a broad range of treatments, including minimum and maximum concrete pavement restoration, the use of thin and thick overlays, and the use of crack or break and seat as well as rubblization as pretreatments for pavement overlays. Ten years after construction, many of the pavements that received the treatments are in need of major rehabilitation. This provides an opportune time to evaluate both the structural and functional performances of these test sections to date. Additionally, an evaluation of cost-effectiveness showed the importance of performing thorough evaluations of projects for rehabilitation and the potential benefit of rubblization of badly damaged jointed concrete pavements, a method used on the state supplemental sections, as a preoverlay strategy.</description><identifier>ISSN: 0361-1981</identifier><identifier>EISSN: 2169-4052</identifier><identifier>DOI: 10.3141/1823-04</identifier><language>eng</language><publisher>Los Angeles, CA: SAGE Publications</publisher><ispartof>Transportation research record, 2003, Vol.1823 (1), p.28-38</ispartof><rights>2003 National Academy of Sciences</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c226t-c388de34fb5be3716fad46684f65ddf88fea55b4f8de5098c9aada390d89d2cd3</citedby><cites>FETCH-LOGICAL-c226t-c388de34fb5be3716fad46684f65ddf88fea55b4f8de5098c9aada390d89d2cd3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttps://journals.sagepub.com/doi/pdf/10.3141/1823-04$$EPDF$$P50$$Gsage$$H</linktopdf><linktohtml>$$Uhttps://journals.sagepub.com/doi/10.3141/1823-04$$EHTML$$P50$$Gsage$$H</linktohtml><link.rule.ids>314,780,784,4024,21819,27923,27924,27925,43621,43622</link.rule.ids></links><search><creatorcontrib>Morian, Dennis A.</creatorcontrib><creatorcontrib>Coleman, Laura</creatorcontrib><creatorcontrib>Frith, Doug J.</creatorcontrib><creatorcontrib>Stoffels, Shelley M.</creatorcontrib><creatorcontrib>Dawood, Dan</creatorcontrib><title>Pennsylvania SPS-6 Performance at 10 Years: Evaluation of Concrete Pavement Rehabilitation Strategies</title><title>Transportation research record</title><description>With a long history of constructing jointed concrete pavements, Pennsylvania pursued the construction of Special Pavement Studies (SPS-6) sections for the rehabilitation of jointed concrete pavements experiment. After 10 years of service under very high loads on rural Interstate highways, a number of sections required renewal. The performances of the eight standard Strategic Highway Research Program sections, a control section, and three state supplemental sections were examined. The experiment included a broad range of treatments, including minimum and maximum concrete pavement restoration, the use of thin and thick overlays, and the use of crack or break and seat as well as rubblization as pretreatments for pavement overlays. Ten years after construction, many of the pavements that received the treatments are in need of major rehabilitation. This provides an opportune time to evaluate both the structural and functional performances of these test sections to date. Additionally, an evaluation of cost-effectiveness showed the importance of performing thorough evaluations of projects for rehabilitation and the potential benefit of rubblization of badly damaged jointed concrete pavements, a method used on the state supplemental sections, as a preoverlay strategy.</description><issn>0361-1981</issn><issn>2169-4052</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2003</creationdate><recordtype>article</recordtype><recordid>eNpl0E9LwzAYBvAgCs4pfoUcRE_VpEnbxJuM-QcGFqcHT-Vt-2Z2tOlM0sG-vZV68_RcfjzwPIRccnYruOR3XMUiYvKIzGKe6kiyJD4mMyZSHnGt-Ck5837LmBAyEzOCOVrrD-0ebAN0na-jlOboTO86sBVSCJQz-ong_D1d7qEdIDS9pb2hi95WDgPSHPbYoQ30Db-gbNomTGYdHATcNOjPyYmB1uPFX87Jx-PyffEcrV6fXhYPq6iK4zRElVCqRiFNmZQoMp4aqGWaKmnSpK6NUgYhSUppRpUwrSoNUIPQrFa6jqtazMn11Ltz_feAPhRd4ytsW7DYD76IM82zWOgR3kywcr33Dk2xc00H7lBwVvzeWPzeWDA5yqtJethgse0HZ8cF_9gP87Nwvw</recordid><startdate>2003</startdate><enddate>2003</enddate><creator>Morian, Dennis A.</creator><creator>Coleman, Laura</creator><creator>Frith, Doug J.</creator><creator>Stoffels, Shelley M.</creator><creator>Dawood, Dan</creator><general>SAGE Publications</general><scope>AAYXX</scope><scope>CITATION</scope><scope>8FD</scope><scope>FR3</scope><scope>KR7</scope></search><sort><creationdate>2003</creationdate><title>Pennsylvania SPS-6 Performance at 10 Years: Evaluation of Concrete Pavement Rehabilitation Strategies</title><author>Morian, Dennis A. ; Coleman, Laura ; Frith, Doug J. ; Stoffels, Shelley M. ; Dawood, Dan</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c226t-c388de34fb5be3716fad46684f65ddf88fea55b4f8de5098c9aada390d89d2cd3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2003</creationdate><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Morian, Dennis A.</creatorcontrib><creatorcontrib>Coleman, Laura</creatorcontrib><creatorcontrib>Frith, Doug J.</creatorcontrib><creatorcontrib>Stoffels, Shelley M.</creatorcontrib><creatorcontrib>Dawood, Dan</creatorcontrib><collection>CrossRef</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>Civil Engineering Abstracts</collection><jtitle>Transportation research record</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Morian, Dennis A.</au><au>Coleman, Laura</au><au>Frith, Doug J.</au><au>Stoffels, Shelley M.</au><au>Dawood, Dan</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Pennsylvania SPS-6 Performance at 10 Years: Evaluation of Concrete Pavement Rehabilitation Strategies</atitle><jtitle>Transportation research record</jtitle><date>2003</date><risdate>2003</risdate><volume>1823</volume><issue>1</issue><spage>28</spage><epage>38</epage><pages>28-38</pages><issn>0361-1981</issn><eissn>2169-4052</eissn><abstract>With a long history of constructing jointed concrete pavements, Pennsylvania pursued the construction of Special Pavement Studies (SPS-6) sections for the rehabilitation of jointed concrete pavements experiment. After 10 years of service under very high loads on rural Interstate highways, a number of sections required renewal. The performances of the eight standard Strategic Highway Research Program sections, a control section, and three state supplemental sections were examined. The experiment included a broad range of treatments, including minimum and maximum concrete pavement restoration, the use of thin and thick overlays, and the use of crack or break and seat as well as rubblization as pretreatments for pavement overlays. Ten years after construction, many of the pavements that received the treatments are in need of major rehabilitation. This provides an opportune time to evaluate both the structural and functional performances of these test sections to date. Additionally, an evaluation of cost-effectiveness showed the importance of performing thorough evaluations of projects for rehabilitation and the potential benefit of rubblization of badly damaged jointed concrete pavements, a method used on the state supplemental sections, as a preoverlay strategy.</abstract><cop>Los Angeles, CA</cop><pub>SAGE Publications</pub><doi>10.3141/1823-04</doi><tpages>11</tpages></addata></record>
fulltext fulltext
identifier ISSN: 0361-1981
ispartof Transportation research record, 2003, Vol.1823 (1), p.28-38
issn 0361-1981
2169-4052
language eng
recordid cdi_proquest_miscellaneous_27917239
source SAGE Complete
title Pennsylvania SPS-6 Performance at 10 Years: Evaluation of Concrete Pavement Rehabilitation Strategies
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-03T06%3A04%3A38IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Pennsylvania%20SPS-6%20Performance%20at%2010%20Years:%20Evaluation%20of%20Concrete%20Pavement%20Rehabilitation%20Strategies&rft.jtitle=Transportation%20research%20record&rft.au=Morian,%20Dennis%20A.&rft.date=2003&rft.volume=1823&rft.issue=1&rft.spage=28&rft.epage=38&rft.pages=28-38&rft.issn=0361-1981&rft.eissn=2169-4052&rft_id=info:doi/10.3141/1823-04&rft_dat=%3Cproquest_cross%3E27917239%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=27917239&rft_id=info:pmid/&rft_sage_id=10.3141_1823-04&rfr_iscdi=true